NPDES MAR100473 · Clean Water Act
SOUTH CREEK STORMWATER OUTFALL RESTORATION PHASE I, Everett, MA: NPDES MAR100473 discharge permit, effluent exceedances, inspections, penalties
SOUTH CREEK STORMWATER OUTFALL RESTORATION PHASE I, Everett, Massachusetts: General permit coverage MAR100473, held by Maverick Construction Management Services, Inc.; Construction stormwater; Effective; issued August 22, 2022, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 912 were issued before MAR100473. Maverick Construction Management Services, Inc. holds 7 permits in Massachusetts.
Other permits held by Maverick Construction Management Services, Inc.
- CANTERBURY BROOK CULVERT SEDIMENT REMOVAL PROJECT, Mattapan: MAR10038I
- MONATIQUOT RIVER RESTORATION - HANCOCK STREET AND PLAIN STREET, Braintree: MAR1004Q8, issued 2023-07-26
- NEEDHAM RESERVOIR, Needham: MAR1005AW, issued 2024-07-22
- SOUTH RESERVOIR DAM IMPROVEMENTS, Winchester: MAR1005EK, issued 2024-10-09
- MONOOSNOC BROOK RESILIENT REDESIGN & RETROFIT PROJECT, Leominster: MAR1005XJ, issued 2025-09-10
- RUNWAY 5 END DRAINAGE IMPROVEMENT PROJECT, North Andover: MAR1005Y3, issued 2025-09-18
Coverages issued nearest MAR100473
- 2022-08-18: PLAZA 549, Westport: MAR10046T, held by 549 American Legion Highway Realty Trust
- 2022-08-18: VILLAGE AT BRICK KILN, Falmouth: MAR10046U, held by VILLAGE AT BRICK KILN LLC
- 2022-08-19: 608078-117601 AQUA LINE: CHELSEA, MA - BROADWAY (ROUTE 107), Chelsea: MAR10046V, held by Aqua Line Utility, Inc.
- 2022-08-22: NORTH QUINCY CABLES REPLACEMENT PROJECT, Quincy: MAR10046Y, held by United Civil Inc.
- 2022-08-22: OLDE FORGE COMMONS, N. Easton: MAR100471, held by Olde Forge Commons, LLC
- 2022-08-22: FRASER FIELD, Lynn: MAR100476, held by David W. White & Son, Inc.
- 2022-08-23: MASS CENTRAL RAIL TRAIL-MILL TO PRINCETON STREETS, Holden: MAR100477, held by R.D. Salvadore Excavation
- 2022-08-24: 25 MILLER HILL ROAD, DOVER, MA, Dover: MAR100479, held by David Parrish, Sherborn Development Group LLC
- 2022-08-24: JACKSON FARM NORTH ATTLEBORO, MA, North Attleboro: MAR10047B, held by H & M Excavating, Inc
- 2022-08-25: WEAVER'S COVE INDUSTRIAL PARK, LLC, Fall River: MAR10047C, held by Weaver's Cove Industrial Park, LLC
SOUTH CREEK STORMWATER OUTFALL RESTORATION PHASE I among its neighbors
157 discharge permits are in the Mystic River-Frontal Boston Harbor subwatershed (HUC 010900010502); MAR100473 is one.
Other permits in the Mystic River-Frontal Boston Harbor subwatershed (HUC 010900010502)
- 0 SOUTH FARM ROAD, Everett: MAG912155, minor, term to 2027-08-01
- 10 & 20 EXECUTIVE DRIVE, STONEHAM, Stoneham: MAR1005SA, minor, term to 2027-02-16
- 100, 125, 150 CAMBRIDGEPARK DRIVE, Cambridge: MAR1002G8, minor, term to 2022-02-15
- 101 SMITH PLACE, Cambridge: MAR10037T, minor, term to 2022-02-15
- 1165R MASS AVE RESIDENTIAL DEVELOPMENT, Arlington: MAR1003QJ, minor, term to 2022-02-15
- 128 SPRING STREET, Everett: MAR1005EI, minor, term to 2027-02-16
- 142 MYSTIC AVENUE MEDFORD MA, Medford: MAR1004RK, minor, term to 2027-02-16
- 212 BEACHAM STREET EVERETT, MA, Everett: MAR1004Y1, minor, term to 2027-02-16
- 299 BROADWAY, Somerville: MAR10063U, minor, term to 2027-02-16
- 35 GARVEY STREET, EVERETT MA 02149, Everett: MAR1003QR, minor, term to 2022-02-15
What stands out
- Its term runs 4 years and 178 days, August 22, 2022 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SOUTH CREEK STORMWATER OUTFALL RESTORATION PHASE I |
|---|---|
| Permittee | Maverick Construction Management Services, Inc. |
| NPDES ID | MAR100473 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 22, 2022 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Everett, MA 02149 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Mystic River-Frontal Boston Harbor (HUC 010900010502) |
NPDES MAR100473: effluent limits and exceedances
SOUTH CREEK STORMWATER OUTFALL RESTORATION PHASE I (NPDES MAR100473): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR100473: no pollutant row on file.
NPDES MAR100473: inspections, violations and enforcement
NPDES MAR100473 (SOUTH CREEK STORMWATER OUTFALL RESTORATION PHASE I): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR100473
NPDES MAR100473: one email when its EPA record changes — $99/month.
Permits near NPDES MAR100473
NPDES MAR100473: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.