NPDES MAR1005AW · Clean Water Act
NEEDHAM RESERVOIR, Needham, MA: NPDES MAR1005AW discharge permit, effluent exceedances, inspections, penalties
NEEDHAM RESERVOIR, Needham, Massachusetts: General permit coverage MAR1005AW, held by Maverick Construction Management Services, Inc.; Construction stormwater; Effective; issued July 22, 2024, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 1,916 were issued before MAR1005AW. Maverick Construction Management Services, Inc. holds 7 permits in Massachusetts.
Other permits held by Maverick Construction Management Services, Inc.
- CANTERBURY BROOK CULVERT SEDIMENT REMOVAL PROJECT, Mattapan: MAR10038I
- SOUTH CREEK STORMWATER OUTFALL RESTORATION PHASE I, Everett: MAR100473, issued 2022-08-22
- MONATIQUOT RIVER RESTORATION - HANCOCK STREET AND PLAIN STREET, Braintree: MAR1004Q8, issued 2023-07-26
- SOUTH RESERVOIR DAM IMPROVEMENTS, Winchester: MAR1005EK, issued 2024-10-09
- MONOOSNOC BROOK RESILIENT REDESIGN & RETROFIT PROJECT, Leominster: MAR1005XJ, issued 2025-09-10
- RUNWAY 5 END DRAINAGE IMPROVEMENT PROJECT, North Andover: MAR1005Y3, issued 2025-09-18
Coverages issued nearest MAR1005AW
- 2024-07-15: ALEXAN WORCESTER, Worcester: MAR1005AP, held by CH MF BTH III/Boston Worcester, L.L.C.
- 2024-07-17: LAUREL HILL ESTATES, Lancaster: MAR1005AS, held by Harbor Classic Homes
- 2024-07-19: PROPOSED COLD STORAGE BUILDING & ADDITION, Fall River: MAR1005AT, held by Hutchens Holdings III, LLC
- 2024-07-19: MULTIPURPOSE TURF FIELD AT CARVALHO FIELD, Lowell: MAR1005AU, held by Todd Heimlich
- 2024-07-19: DANEHY PARK FIELD 4 FIELD AND TRACK IMPROVEMENTS, Cambridge: MAR1005AV, held by Todd Heimlich
- 2024-07-23: GOLDEN NOZZLE CARWASH - LEOMINSTER, MASSACHUSETTS, Leominster: MAR1005AY, held by Nouria Energy Retail, Inc
- 2024-07-24: 768 ELM STREET, CONCORD MA, Concord: MAR1005AQ, held by Block Builders, Inc.
- 2024-07-24: STRAWBERRY FARMS, Littleton: MAR1005AZ, held by Mark Gallagher
- 2024-07-24: WELLS 5 & 8 WATER TREATMENT PLANT, Chatham: MAR1005B1, held by Winston Builders Corp
- 2024-07-24: PROPOSED RETAIL MOTOR FUEL OUTLET - RAYNHAM, MA, Raynham: MAR1005B3, held by Nouria Energy Corp
NEEDHAM RESERVOIR among its neighbors
100 discharge permits are in the Beaver Brook-Charles River subwatershed (HUC 010900010703); MAR1005AW is one.
Other permits in the Beaver Brook-Charles River subwatershed (HUC 010900010703)
- 100 WEST STREET, Needham: MAR10066S, minor, term to 2027-02-16
- 101 HIGH STREET, WESTWOOD - RESIDENTIAL DEVELOPMENT, Westwood: MAR10068S, minor, term to 2027-02-16
- 1208D VFW PARKWAY, Ma: MAR1003UY, minor, term to 2027-02-16
- 151 RIVERMOOR ST, West Roxbury: MAR1005YY, minor, term to 2027-02-16
- 160 GOULD STREET OFFICE BUILDING, Needham: MA0029921
- 20 SEYON, Watertown: MAR1005WM, minor, term to 2027-02-16
- 200 TRAPELO RD, PHASE 2, IMPROVEMENTS, Waltham: MAR10065K, minor, term to 2027-02-16
- 214 LOWDER STREET, Dedham: MAR1003R0, minor, term to 2022-02-15
- 220-234 CALVARY STREET, Waltham: MAG912128, minor, term to 2027-08-01
- 33 BULLARD ROAD, WESTON PROJECT, Weston: MAR1005RS, minor, term to 2027-02-16
What stands out
- Its term runs 2 years and 209 days, July 22, 2024 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NEEDHAM RESERVOIR |
|---|---|
| Permittee | Maverick Construction Management Services, Inc. |
| NPDES ID | MAR1005AW |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 22, 2024 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Needham, MA 02492 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Beaver Brook-Charles River (HUC 010900010703) |
NPDES MAR1005AW: effluent limits and exceedances
NEEDHAM RESERVOIR (NPDES MAR1005AW): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1005AW: no pollutant row on file.
NPDES MAR1005AW: inspections, violations and enforcement
NPDES MAR1005AW (NEEDHAM RESERVOIR): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1005AW
NPDES MAR1005AW: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1005AW
NPDES MAR1005AW: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.