NPDES MAR1004XU · Clean Water Act
PROPOSED FUELING STATION IMPROVEMENTS, Sutton, MA: NPDES MAR1004XU discharge permit, effluent exceedances, inspections, penalties
PROPOSED FUELING STATION IMPROVEMENTS, Sutton, Massachusetts: General permit coverage MAR1004XU, held by Drake Petroleum Company, Inc; Construction stormwater; Effective; issued December 6, 2023, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 1,567 were issued before MAR1004XU.
Coverages issued nearest MAR1004XU
- 2023-12-05: 313 MAIN STREET, Boylston: MAR1004XJ, held by Pond View on Main, LLC
- 2023-12-05: SOUTH STREET FOOTE RESIDENCE, Carlisle: MAR1004XL, held by Hutter Construction Corporation
- 2023-12-05: 220 STURBRIDGE ROAD, Charlton: MAR1004XM, held by Comerford, LLC
- 2023-12-06: 501 & 505 WAREHAM STREET, Middleborough: MAR1004XN, held by The Middleboro Wareham Trust
- 2023-12-06: 605032-116287 HADLEY- RECONSTRUCTION ON ROUTE 9, Hadley: MAR1004XR, held by MassDOT Highway Division
- 2023-12-06: W1737-041 GEELEHER: LUDLOW, MA - MILLSIDE DRIVE CONSTRUCTION, Ludlow: MAR1004XV, held by Geeleher Enterprises Inc.
- 2023-12-11: PHASE 1C-5 OYSTER POND SEWER EXTENSION, Chatham: MAR1004XZ, held by C.C Construction
- 2023-12-13: KING PHILIP ESTATES, Wrentham: MAR1004Y0, held by Mounir Tayara
- 2023-12-13: 212 BEACHAM STREET EVERETT, MA, Everett: MAR1004Y1, held by Construction Source Management
- 2023-12-13: SHAWMUT AVENUE AND HOWLAND STREET PUMPING STATION IMPROVEMENTS, New Bedford: MAR1004Y2, held by WES Construction Corp.
PROPOSED FUELING STATION IMPROVEMENTS among its neighbors
39 discharge permits are in the Singletary Brook-Blackstone River subwatershed (HUC 010900030105); MAR1004XU is one.
Other permits in the Singletary Brook-Blackstone River subwatershed (HUC 010900030105)
- #608640, SUTTON/GRAFTON, BRIDGE REPLACEMENT S-33-004 DEPOT STREET, Sutton: MAR1005NK, minor, term to 2027-02-16
- 133 GRANITE STREET, Worcester: MAR1004S4, minor, term to 2027-02-16
- AAA FACILITY, Worcester: MAR1005PN, minor, term to 2027-02-16
- ATLAS GLOBAL SOLUTIONS, Sutton: MANOE3298, minor, term to 2020-09-01
- ATLAS GLOBAL SOLUTIONS, Sutton: MANOE3302, minor, term to 2020-09-01
- CALUMET COURT AND CENTENNIAL COURT, Uxbridge: MAR10061V, minor, term to 2027-02-16
- EYEPOINT PHARMACEUTICALS US, INC., Northbridge: MANOEJ0DB, minor, term to 2029-07-25
- FISHERVILLE TERRACE, Grafton: MAR10048T, minor, term to 2027-02-16
- GRAFTON WASTEWATER TREATMENT PLANT, South Grafton: MANOEJ081, minor, term to 2026-05-27
- GRAFTON WWTP, South Grafton: MAG070419, minor, term to 2020-05-19
What stands out
- Its term runs 3 years and 72 days, December 6, 2023 to February 16, 2027.
- No dated event in the 365 days to October 14, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PROPOSED FUELING STATION IMPROVEMENTS |
|---|---|
| Permittee | Drake Petroleum Company, Inc |
| NPDES ID | MAR1004XU |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 6, 2023 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Sutton, MA 01590 |
| Subwatershed | Singletary Brook-Blackstone River (HUC 010900030105) |
NPDES MAR1004XU: effluent limits and exceedances
PROPOSED FUELING STATION IMPROVEMENTS (NPDES MAR1004XU): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1004XU: no pollutant row on file.
NPDES MAR1004XU: inspections, violations and enforcement
NPDES MAR1004XU (PROPOSED FUELING STATION IMPROVEMENTS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1004XU
NPDES MAR1004XU: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1004XU
NPDES MAR1004XU: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.