NPDES MAR10050O · Clean Water Act
BRIDGE BUNDLE REPLACEMENT OF I-495 BRIDGES OVER RTE 28 INTERCHANGE AND MBTA RAIL, Andover, MA: NPDES MAR10050O discharge permit, effluent exceedances, inspections, penalties
BRIDGE BUNDLE REPLACEMENT OF I-495 BRIDGES OVER RTE 28 INTERCHANGE AND MBTA RAIL, Andover, Massachusetts: General permit coverage MAR10050O, held by Massachusetts Department of Transportation; Construction stormwater; Effective; issued February 5, 2024, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 1,644 were issued before MAR10050O. Massachusetts Department of Transportation holds 62 permits in Massachusetts.
Other permits held by Massachusetts Department of Transportation
- INTERSECTION IMPROVEMENTS ON BOSTON ROAD (RTE 4) AT CONCORD AND PARKER ROADS, Chelmsford: MAR10034D, issued 2021-02-24
- I-95 RESURFACING AND RELATED WORK, PEABODY TO NEWBURYPORT, MA, Peabody: MAR10034U, issued 2021-03-08
- EVERETT, MA - FERRY ST, SOUTH FERRY ST AND ELM ST, Everett: MAR1003NM, issued 2022-02-01
- INTERSECTION RECONSTRUCTION ON ROUTE 108 AT ROUTE 110 (KENOZA AVE), Haverhill: MAR1003OK, issued 2022-01-10
- WESTBOROUGH/HOPKINTON PROJECT #606632 FRUIT ST. OVER MBTA/CSX & SUDBURY RIVER, Westborough: MAR1003YW, issued 2022-05-30
- STURBRIDGE, RESURFACING ALONG A SECTION OF I-90 PROJECT #609481, Sturbridge: MAR1003ZA, issued 2022-05-30
- AUBURN PROJECT #607556 INTERCHANGE RAMPS, I-90 EXIT 10 OVER RT. 12, Auburn: MAR1003ZB, issued 2022-05-30
- STOW, BRIDGE SUPERSTR. REPLAC, GLEASONDALE ROAD (RT. 62) OVER ASSABET RIVER, Stow: MAR1003ZG, issued 2022-05-31
- DEDHAM STREET/I-95 INTERCHANGE RECONSTRUCTION INCLUDING REHABILITATION/REPLACEME, Canton/Norwood/Westwood: MAR1003ZI, issued 2022-05-31
- RECONSTRUCTION AND RELATED WORK AT MAIN STREET (ROUTE 113) - DUNSTABLE, Dunstable: MAR1003ZL, issued 2022-05-31
Coverages issued nearest MAR10050O
- 2024-01-31: OLD OAKEN BUCKET ESTATES, Norwell: MAR10050G, held by Highland Estates Old Oaken Bucket, LLC
- 2024-01-31: 619 WINTHROP AVENUE, Revere: MAR10050H, held by SD Winthrop, LLC
- 2024-02-01: RED BRIDGE HYDRO, Wilbraham: MAR10050I, held by Patriot Hydro, LLC
- 2024-02-01: MATTAKEESETT VILLAGE, Pembroke: MAR10050J, held by Steve McCarthy
- 2024-02-03: 440 HARTFORD TURNPIKE, Shrewsbury: MAR10050N, held by Eugene T. Sullivan Inc.
- 2024-02-05: 103 SANBORN LANE, Reading: MAR10050P, held by M.G. Hall Contractors, Inc.,
- 2024-02-06: ALEXAN CHELMSFORD, Chelmsford: MAR10050R, held by Capitol Services, LLC
- 2024-02-07: PINE RIDGE ESTATES, Uxbridge: MAR10050S, held by 47 Dodge Deco, LLC
- 2024-02-08: 20-2023 FREIGHT SHED DEMOLITION WOODS HOLE, Falmouth: MAR10050U, held by Speakman Excavating LLC
- 2024-02-08: PROVIN MOUNTAIN WATER STORAGE TANK, Westfield: MAR10050V, held by Crestview Construction & Trucking, Inc.
BRIDGE BUNDLE REPLACEMENT OF I-495 BRIDGES OVER RTE 28 INTERCHANGE AND MBTA RAIL among its neighbors
19 discharge permits are in the Lower Shawsheen River subwatershed (HUC 010700061303); MAR10050O is one.
Other permits in the Lower Shawsheen River subwatershed (HUC 010700061303)
- 27 MAIN STREET, ANDOVER, MA, Andover: MAG912160, minor, term to 2027-08-01
- 305 NORTH MAIN STREET, Andover: MAR10066A, minor, term to 2027-02-16
- 350 WINTHROP AVENUE, North Andover: MAR100566, minor, term to 2027-02-16
- ANDOVER GATE RELIABILITY, Andover: MAR1005FR
- ANDOVER MUNICIPAL SEPARATE STORM SEWER SYSTEM, Andover: MAR041178
- BRIDGE BUNDLE, REPLACEMENTS AT I-495 OVER ROUTE 28 AND MBTA, Andover: MAR1004Z7, minor, term to 2027-02-16
- CORNER DEVELOPMENT PROJECT AT MERRIMACK COLLEGE, North Andover: MAR10058Z, minor, term to 2027-02-16
- CORNER DEVELOPMENT PROJECT AT MERRIMACK COLLEGE, North Andover: MAR1005A7, minor, term to 2027-02-16
- CORRIDOR IMPROVEMENTS ON ROUTE 114 IN NORTH ANDOVER, North Andover: MAR1006C5, minor, term to 2027-02-16
- CORRIDOR IMPROVEMENTS ON ROUTE 114, BETWEEN WAVERLY ROAD AND WILLOW/MILL STREET, North Andover: MAR10069K, minor, term to 2027-02-16
What stands out
- Its term runs 3 years and 11 days, February 5, 2024 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | BRIDGE BUNDLE REPLACEMENT OF I-495 BRIDGES OVER RTE 28 INTERCHANGE AND MBTA RAIL |
|---|---|
| Permittee | Massachusetts Department of Transportation |
| NPDES ID | MAR10050O |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | February 5, 2024 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Andover, MA 01810 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Lower Shawsheen River (HUC 010700061303) |
NPDES MAR10050O: effluent limits and exceedances
BRIDGE BUNDLE REPLACEMENT OF I-495 BRIDGES OVER RTE 28 INTERCHANGE AND MBTA RAIL (NPDES MAR10050O): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR10050O: no pollutant row on file.
NPDES MAR10050O: inspections, violations and enforcement
NPDES MAR10050O (BRIDGE BUNDLE REPLACEMENT OF I-495 BRIDGES OVER RTE 28 INTERCHANGE AND MBTA RAIL): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR10050O
NPDES MAR10050O: one email when its EPA record changes — $99/month.
Permits near NPDES MAR10050O
NPDES MAR10050O: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.