NPDES MAR1005FR · Clean Water Act
ANDOVER GATE RELIABILITY, Andover, MA: NPDES MAR1005FR discharge permit, effluent exceedances, inspections, penalties
ANDOVER GATE RELIABILITY, Andover, Massachusetts: General permit coverage MAR1005FR, held by New England Utility Constructors Inc.; Construction stormwater; Not needed.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file. New England Utility Constructors Inc. holds 3 permits in Massachusetts.
Other permits held by New England Utility Constructors Inc.
- EASTON LIQUIFIED NATURAL GAS OVER-PRESSURIZATION STATION, Easton: MAR1005GA, issued 2024-11-06
- ANDOVER GATE RELAY PROJECT, Andover: MAR1005GB, issued 2024-11-06
ANDOVER GATE RELIABILITY among its neighbors
19 discharge permits are in the Lower Shawsheen River subwatershed (HUC 010700061303); MAR1005FR is one.
Other permits in the Lower Shawsheen River subwatershed (HUC 010700061303)
- 27 MAIN STREET, ANDOVER, MA, Andover: MAG912160, minor, term to 2027-08-01
- 305 NORTH MAIN STREET, Andover: MAR10066A, minor, term to 2027-02-16
- 350 WINTHROP AVENUE, North Andover: MAR100566, minor, term to 2027-02-16
- ANDOVER MUNICIPAL SEPARATE STORM SEWER SYSTEM, Andover: MAR041178
- BRIDGE BUNDLE REPLACEMENT OF I-495 BRIDGES OVER RTE 28 INTERCHANGE AND MBTA RAIL, Andover: MAR10050O, minor, term to 2027-02-16
- BRIDGE BUNDLE, REPLACEMENTS AT I-495 OVER ROUTE 28 AND MBTA, Andover: MAR1004Z7, minor, term to 2027-02-16
- CORNER DEVELOPMENT PROJECT AT MERRIMACK COLLEGE, North Andover: MAR10058Z, minor, term to 2027-02-16
- CORNER DEVELOPMENT PROJECT AT MERRIMACK COLLEGE, North Andover: MAR1005A7, minor, term to 2027-02-16
- CORRIDOR IMPROVEMENTS ON ROUTE 114 IN NORTH ANDOVER, North Andover: MAR1006C5, minor, term to 2027-02-16
- CORRIDOR IMPROVEMENTS ON ROUTE 114, BETWEEN WAVERLY ROAD AND WILLOW/MILL STREET, North Andover: MAR10069K, minor, term to 2027-02-16
What stands out
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater.
Identity
| Facility | ANDOVER GATE RELIABILITY |
|---|---|
| Permittee | New England Utility Constructors Inc. |
| NPDES ID | MAR1005FR |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Address | Andover, MA 01810 |
| Subwatershed | Lower Shawsheen River (HUC 010700061303) |
NPDES MAR1005FR: effluent limits and exceedances
ANDOVER GATE RELIABILITY (NPDES MAR1005FR): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1005FR: no pollutant row on file.
NPDES MAR1005FR: inspections, violations and enforcement
NPDES MAR1005FR (ANDOVER GATE RELIABILITY): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1005FR
NPDES MAR1005FR: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1005FR
NPDES MAR1005FR: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.