NPDES MAR1005EY · Clean Water Act
FRANCIS WYMAN BASEBALL FIELD RENOVATION PROJECT, Burlington, MA: NPDES MAR1005EY discharge permit, effluent exceedances, inspections, penalties
FRANCIS WYMAN BASEBALL FIELD RENOVATION PROJECT, Burlington, Massachusetts: General permit coverage MAR1005EY, held by Mark Heimlich; Construction stormwater; Effective; issued October 14, 2024, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 2,034 were issued before MAR1005EY. Mark Heimlich holds 3 permits in Massachusetts.
Other permits held by Mark Heimlich
- GREATER LOWELL REGIONAL VOCATIONAL TECH HS TRACK FIELD RECONSTRUCTION PROJECT, Tyngsborough: MAR1004MW, issued 2023-05-24
- FRUIT STREET PARK PICKLEBALL COURTS AND PARKING AREA, Hopkinton: MAR1004SW, issued 2023-09-08
Coverages issued nearest MAR1005EY
- 2024-10-10: CHIPOTLE, Canton: MAR1005ES, held by Ramco
- 2024-10-10: PROPOSED UPGRADED FACILITY, Stoughton: MAR1005ET, held by 84 Lumber Co.
- 2024-10-14: PUBLIC WORKS FACILITY EXPANSION & RENOVATION, Foxborough: MAR1005EV, held by Peter DeGirolamo & Sons, Inc.
- 2024-10-14: LOVE FARMS REDEVELOPMENT, West Dennis: MAR1005EW, held by Acella Construction Corporation
- 2024-10-14: ROUTE 3 BRIDGE REPLACEMENT OVER FRANKLIN STREET, Duxbury: MAR1005EX, held by Massachusetts Department of Transportation
- 2024-10-15: 111 AVCO ROAD, Haverhill: MAR1005F0, held by MDK Realty, Inc.
- 2024-10-17: HEARTHSTONE VILLAGE, West Springfield: MAR1005F1, held by JKM Construction Corp.
- 2024-10-17: C3552 MDR CONSTRUCTION CO. INC: MELROSE-LYNN FELLS PKWY MELROSE ST INTERSECTION, Melrose: MAR1005F3, held by MDR Construction Co. Inc.
- 2024-10-18: QUINEBAUG VALLEY RAIL TRAIL, Southbridge: MAR1005F4, held by David G. Roach and Sons, Inc.
- 2024-10-18: ACE DENTAL, Brockton: MAR1005F5, held by Ace Dental
FRANCIS WYMAN BASEBALL FIELD RENOVATION PROJECT among its neighbors
88 discharge permits are in the Upper Shawsheen River subwatershed (HUC 010700061301); MAR1005EY is one. Its county: 539, 13 major; MAR1005EY is minor permit.
Other permits in the Upper Shawsheen River subwatershed (HUC 010700061301)
- 1366 TECHNOLOGIES INC., Bedford: MANOEJ033, minor, term to 2024-11-20
- 17 HARTWELL AVE, Lexington: MAR1005MV, minor, term to 2027-02-16
- 172 MIDDLESEX TURNPIKE, Bedford: MAR1003FH, minor, term to 2022-02-15
- 2019 EMD MILLIPORE DEMOLITION PROJECT, Bedford: MAR1002E0, minor, term to 2022-02-15
- 25 NETWORK DRIVE OFFICE/LAB/MANUFACTURING BUILDING, Burlington: MAR100411, minor, term to 2027-02-16
- 28 MERIAM STREET, Lexington: MAR1005DR, minor, term to 2027-02-16
- 3-5 MILITIA DRIVE, Lexington: MAR1006CF, minor, term to 2027-02-16
- 3-5 MILITIA DRIVE, Lexington: MAR1006FY, minor, term to 2027-02-16
- 40 MIDDLESEX TURNPIKE, Bedford: MAR1005LP, minor, term to 2027-02-16
- 7 HARTWELL AVENUE, Lexington: MAG912279, minor, term to 2027-08-01
What stands out
- Its term runs 2 years and 125 days, October 14, 2024 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | FRANCIS WYMAN BASEBALL FIELD RENOVATION PROJECT |
|---|---|
| Permittee | Mark Heimlich |
| NPDES ID | MAR1005EY |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 14, 2024 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Burlington, MA 01803 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Upper Shawsheen River (HUC 010700061301) |
| Other EPA IDs (FRS) | RCRA handler MAR000584979; ICIS-AIR source MA0000002511901272 |
NPDES MAR1005EY: effluent limits and exceedances
FRANCIS WYMAN BASEBALL FIELD RENOVATION PROJECT (NPDES MAR1005EY): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1005EY: no pollutant row on file.
NPDES MAR1005EY: inspections, violations and enforcement
NPDES MAR1005EY (FRANCIS WYMAN BASEBALL FIELD RENOVATION PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1005EY
NPDES MAR1005EY: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1005EY
NPDES MAR1005EY: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.