NPDES MAR1005GR · Clean Water Act
89 BEDFORD STREET, Lexington, MA: NPDES MAR1005GR discharge permit, effluent exceedances, inspections, penalties
89 BEDFORD STREET, Lexington, Massachusetts: General permit coverage MAR1005GR, held by FK Partners Lexington, LLC; Construction stormwater; Effective; issued November 17, 2024, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 2,095 were issued before MAR1005GR.
Coverages issued nearest MAR1005GR
- 2024-11-13: PINE MEADOW ROAD DUAL-USE SOLAR ARRAY B, Northfield: MAR1005GM, held by DIstributed Energy Infrastructure
- 2024-11-13: FRANCIS MORSE PLAYSTEAD, Methuen: MAR1005GN, held by Huntress Associates, Inc.
- 2024-11-14: WHITE STADIUM EAST GRANDSTAND, Boston: MAR1005GO, held by BOND Building Construction, Inc.
- 2024-11-15: WESTPORT WATER MAIN EXTENSION, Westport: MAR1005GP, held by Dig-It Construction LLC
- 2024-11-15: A.F. AMORELLO & SONS, INC: NORTHBRIDGE, MA - COMPLETE STREETS PROJECT, Northbridge: MAR1005GQ, held by A.F. Amorello & Sons, Inc.
- 2024-11-18: TRAFFIC & SAFETY IMPROVEMENTS, ESSEX ST X-SECTION WITH SPRING ST & CORNING ST, Beverly: MAR1005GT, held by MacKay Construction Services
- 2024-11-19: 606517-125780 WEST BROOKFIELD ROUTE 9, West Brookfield: MAR1005GU, held by MassDOT Highway Division
- 2024-11-19: WHISTLE STOP FARM - PHASE II, Westford: MAR1005GV, held by Seal Harbor, LLC
- 2024-11-19: 155 BAY ROAD BELCHERTOWN, Belchertown: MAR1005GW, held by UFP Real Estate LLC
- 2024-11-20: MPMGR, Lancaster: MAR1005GX, held by Manafort Brothers Inc.
89 BEDFORD STREET among its neighbors
88 discharge permits are in the Upper Shawsheen River subwatershed (HUC 010700061301); MAR1005GR is one.
Other permits in the Upper Shawsheen River subwatershed (HUC 010700061301)
- 1366 TECHNOLOGIES INC., Bedford: MANOEJ033, minor, term to 2024-11-20
- 17 HARTWELL AVE, Lexington: MAR1005MV, minor, term to 2027-02-16
- 172 MIDDLESEX TURNPIKE, Bedford: MAR1003FH, minor, term to 2022-02-15
- 2019 EMD MILLIPORE DEMOLITION PROJECT, Bedford: MAR1002E0, minor, term to 2022-02-15
- 25 NETWORK DRIVE OFFICE/LAB/MANUFACTURING BUILDING, Burlington: MAR100411, minor, term to 2027-02-16
- 28 MERIAM STREET, Lexington: MAR1005DR, minor, term to 2027-02-16
- 3-5 MILITIA DRIVE, Lexington: MAR1006CF, minor, term to 2027-02-16
- 3-5 MILITIA DRIVE, Lexington: MAR1006FY, minor, term to 2027-02-16
- 40 MIDDLESEX TURNPIKE, Bedford: MAR1005LP, minor, term to 2027-02-16
- 7 HARTWELL AVENUE, Lexington: MAG912279, minor, term to 2027-08-01
What stands out
- Its term runs 2 years and 91 days, November 17, 2024 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | 89 BEDFORD STREET |
|---|---|
| Permittee | FK Partners Lexington, LLC |
| NPDES ID | MAR1005GR |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 17, 2024 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Lexington, MA 02420 |
| Subwatershed | Upper Shawsheen River (HUC 010700061301) |
NPDES MAR1005GR: effluent limits and exceedances
89 BEDFORD STREET (NPDES MAR1005GR): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1005GR: no pollutant row on file.
NPDES MAR1005GR: inspections, violations and enforcement
NPDES MAR1005GR (89 BEDFORD STREET): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1005GR
NPDES MAR1005GR: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1005GR
NPDES MAR1005GR: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.