NPDES MAR1005J5 · Clean Water Act
LAKESIDE EXPANSION, Natick, MA: NPDES MAR1005J5 discharge permit, effluent exceedances, inspections, penalties
LAKESIDE EXPANSION, Natick, Massachusetts: General permit coverage MAR1005J5, held by The MathWorks, Inc.; Construction stormwater; Effective; issued December 31, 2024, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 2,167 were issued before MAR1005J5.
Coverages issued nearest MAR1005J5
- 2024-12-27: TRANSPORTATION IMPROVEMENT PROJECT KENDALL ROAD, Tyngsborough: MAR1005IZ, held by Newport Construction Corporation
- 2024-12-30: CATHOLIC RELIGIOUS ARCHIVES, Brighton: MAR1005J1, held by Trustees of Boston College
- 2024-12-30: HAYES PUMP STATION REHABILITATION, Wakefield: MAR1005J2, held by Waterline Industries Corp.
- 2024-12-30: ACAPESKET GARDENS, East Falmouth: MAR1005J3, held by Nick Mirrione
- 2024-12-31: PROPOSED CAR WASH, Haverhill: MAR1005J4, held by Marquis Contracting Group
- 2025-01-01: WESSAGUSSETT BEACH WALK PROJECT, Weymouth: MAR1005J7, held by Eric Mangasarian
- 2025-01-01: 3.23 MW DC PHOTOVOLTAIC SOLAR DEVELOPMENT, Cheshire: MAR1005J9, held by Gore Brook, LLC
- 2025-01-02: 815 BEDFORD STREET, Bridgewater: MAR1005JA, held by John Vasvatekis
- 2025-01-03: WESSAGUSSETT BEACH WALK PROJECT, Weymouth: MAR1005JB, held by Gregory LaBella
- 2025-01-03: MAP 23 PARCELS 34A, Blackstone: MAR1005JC, held by Brian Inman
LAKESIDE EXPANSION among its neighbors
49 discharge permits are in the Lake Cochituate-Sudbury River subwatershed (HUC 010700050103); MAR1005J5 is one.
Other permits in the Lake Cochituate-Sudbury River subwatershed (HUC 010700050103)
- #605313, NATICK, BRIDGE REPLACEMENT N-03-020, RT 27 OVER RT 9, Natick: MAR1005NJ, minor, term to 2027-02-16
- ABI-LAB 3, Natick: MAR1004ZR, minor, term to 2027-02-16
- BMS SHEPLEY HILL LANDFILL SOIL RELOCATION, Devens: MAR10065F, minor, term to 2027-02-16
- BRIDGE REPLACEMENT, N-03-020, RT. 27 OVER RT. 9 AND INTERCHANGE IMPROVEMENTS, Natick: MAR1005KP, minor, term to 2027-02-16
- CENTRAL STREET CORRIDOR WATER AND SEWER REHABILITATION AND REPLACEMENT, Framingham: MAR1006CC, minor, term to 2027-02-16
- CENTRAL STREET WATER/SEWER REPLACEMENT, Framingham: MAG912306, minor, term to 2027-08-01
- CLEAN CORPORATION, Natick: MAG912002, minor, term to 2027-08-01
- COAN, INC., Natick: MANOE3475, minor, term to 2025-10-01
- FEDERAL EXPRESS - ZNAT, Natick: MANOEJ02Y, minor, term to 2024-10-30
- FORT DEVENS MIRE PIT, Devens: MAR1003W1, minor, term to 2027-02-16
What stands out
- Its term runs 2 years and 47 days, December 31, 2024 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | LAKESIDE EXPANSION |
|---|---|
| Permittee | The MathWorks, Inc. |
| NPDES ID | MAR1005J5 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 31, 2024 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Natick, MA 01760 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Lake Cochituate-Sudbury River (HUC 010700050103) |
NPDES MAR1005J5: effluent limits and exceedances
LAKESIDE EXPANSION (NPDES MAR1005J5): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1005J5: no pollutant row on file.
NPDES MAR1005J5: inspections, violations and enforcement
NPDES MAR1005J5 (LAKESIDE EXPANSION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1005J5
NPDES MAR1005J5: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1005J5
NPDES MAR1005J5: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.