NPDES MAR1006CC · Clean Water Act
CENTRAL STREET CORRIDOR WATER AND SEWER REHABILITATION AND REPLACEMENT, Framingham, MA: NPDES MAR1006CC discharge permit, effluent exceedances, inspections, penalties
CENTRAL STREET CORRIDOR WATER AND SEWER REHABILITATION AND REPLACEMENT, Framingham, Massachusetts: General permit coverage MAR1006CC, held by P. Gioioso & Sons, Inc.; Construction stormwater; Effective; issued June 15, 2026, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 3,119 were issued before MAR1006CC. P. Gioioso & Sons, Inc. holds 13 permits in Massachusetts.
Other permits held by P. Gioioso & Sons, Inc.
- CENTRAL STREET WATER/SEWER REPLACEMENT, Framingham: MAG912306, issued 2022-08-02
- PLYMOUTH STANDBY WASTEWATER FORCE MAIN, Plymouth: MAR100016, issued 2017-03-17
- COMMANDER SHEA BLVD AND NO NAME ROAD, Quincy: MAR10024X, issued 2019-07-05
- HIGHLAND AVE. / NEEDHAM ST. ROADWAY RECONSTRUCTION AND BRIDGE WIDENING PROJECT, Needham: MAR1002ZV, issued 2020-12-01
- RIVER STREET INFRASTRUCTURE AND STREETSCAPE IMPROVEMENTS, Cambridge: MAR1004AA, issued 2022-10-07
- PHASE 4 & 5 WEST LYNN SEWER SEPARATION, Lynn: MAR1004RA, issued 2023-08-14
- MBTA EAST STREET BRIDGE REPLACEMENT PROJECT, Dedham: MAR1005CJ, issued 2024-08-19
- SOUTH BOSTON SEWER SEPARATION - PHASE III, South Boston: MAR1005EZ, issued 2024-10-24
- INTERMEDIATE HIGH PIPELINE IMPROVEMENTS CP1 SECTION 75A & 47, Watertown: MAR1005N2, issued 2025-03-26
- EAST BOSTON SEWER SEPARATION PHASE IV, CONTRACT 1, East Boston: MAR10062C, issued 2025-11-20
Coverages issued nearest MAR1006CC
- 2026-06-09: 150 TIHONET ROAD, Wareham: MAR1006D6, held by North American Renewables, Inc.
- 2026-06-09: SHEFFIELD HIGHWAY GARAGE, Sheffield: MAR1006D7, held by Wm. J. Keller & Sons Construction Corp.
- 2026-06-09: TYLER FAVREAU, Sterling: MAR1006DB, held by Tyler S Favreau
- 2026-06-10: SAPPHIRE CIRCLE SUBDIVISION, Canton: MAR10061J, held by Zeus Construction LLC
- 2026-06-11: 6 LAKESHORE CENTER, Bridgewater: MAR1006CN, held by Opechee Construction Corporation
- 2026-06-15: LONGMEADOW MIDDLE SCHOOL, Longmeadow: MAR1006D0, held by Fontaine Bros
- 2026-06-15: BOURNE STREET DEVELOPMENT, Clinton: MAR1006DC, held by Mia Realty Trust
- 2026-06-15: UXBRIDGE GAS & MARKET STATION DEVELOPMENT, Uxbridge: MAR1006DD, held by Uxbridge Gas & Market, LLC
- 2026-06-15: 35 PRATTS JUNCTION PAVING MAINTENANCE PROJECT, Sterling: MAR1006DF, held by New England Power Company
- 2026-06-15: ADIN ESTATES DEFINITIVE SUBDIVISION IN FRANKLIN, MA, Franklin: MAR1006DG, held by Bill Canesi of Canesi Bros. Construction, Inc.
CENTRAL STREET CORRIDOR WATER AND SEWER REHABILITATION AND REPLACEMENT among its neighbors
49 discharge permits are in the Lake Cochituate-Sudbury River subwatershed (HUC 010700050103); MAR1006CC is one.
Other permits in the Lake Cochituate-Sudbury River subwatershed (HUC 010700050103)
- #605313, NATICK, BRIDGE REPLACEMENT N-03-020, RT 27 OVER RT 9, Natick: MAR1005NJ, minor, term to 2027-02-16
- ABI-LAB 3, Natick: MAR1004ZR, minor, term to 2027-02-16
- BMS SHEPLEY HILL LANDFILL SOIL RELOCATION, Devens: MAR10065F, minor, term to 2027-02-16
- BRIDGE REPLACEMENT, N-03-020, RT. 27 OVER RT. 9 AND INTERCHANGE IMPROVEMENTS, Natick: MAR1005KP, minor, term to 2027-02-16
- CENTRAL STREET WATER/SEWER REPLACEMENT, Framingham: MAG912306, minor, term to 2027-08-01
- CLEAN CORPORATION, Natick: MAG912002, minor, term to 2027-08-01
- COAN, INC., Natick: MANOE3475, minor, term to 2025-10-01
- FEDERAL EXPRESS - ZNAT, Natick: MANOEJ02Y, minor, term to 2024-10-30
- FORT DEVENS MIRE PIT, Devens: MAR1003W1, minor, term to 2027-02-16
- FRAMINGHAM LOGAN EXPRESS OVERFLOW LOT REVENUE CONTROLS, Framingham: MAR10056D, minor, term to 2027-02-16
What stands out
- Its term runs 246 days, June 15, 2026 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CENTRAL STREET CORRIDOR WATER AND SEWER REHABILITATION AND REPLACEMENT |
|---|---|
| Permittee | P. Gioioso & Sons, Inc. |
| NPDES ID | MAR1006CC |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 15, 2026 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Framingham, MA 01701 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Lake Cochituate-Sudbury River (HUC 010700050103) |
NPDES MAR1006CC: effluent limits and exceedances
CENTRAL STREET CORRIDOR WATER AND SEWER REHABILITATION AND REPLACEMENT (NPDES MAR1006CC): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1006CC: no pollutant row on file.
NPDES MAR1006CC: inspections, violations and enforcement
NPDES MAR1006CC (CENTRAL STREET CORRIDOR WATER AND SEWER REHABILITATION AND REPLACEMENT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1006CC
NPDES MAR1006CC: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1006CC
NPDES MAR1006CC: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.