NPDES MAR1005M4 · Clean Water Act
METHUEN, MA - ARLINGTON NEIGHBORHOOD INFRASTRUCTURE IMP. - PHASE 1, Methuen, Ma, MA: NPDES MAR1005M4 discharge permit, effluent exceedances, inspections, penalties
METHUEN, MA - ARLINGTON NEIGHBORHOOD INFRASTRUCTURE IMP. - PHASE 1, Methuen, Ma, Massachusetts: General permit coverage MAR1005M4, held by Albanese D&S, Inc.; Construction stormwater; Effective; issued March 7, 2025, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 2,266 were issued before MAR1005M4. Albanese D&S, Inc. holds 10 permits in Massachusetts.
Other permits held by Albanese D&S, Inc.
- REHABILITATION OF WASM 3 SECTIONS W11/W12/W16/51 WATER MAINS, Medford, Somervile, Arlington: MAR1002YW, issued 2020-11-17
- REHABILITATION OF SECTIONS 23, 24, AND 47 WATER MAINS BOSTON AND NEWTON, Boston And Newton: MAR1003OF, issued 2022-01-05
- MWRA NORTHERN EXTRA HIGH PRESSURE ZONE IMPROVEMENTS SECTION 63, Lexington: MAR1003U5, issued 2022-04-21
- STURGES PUMP STATION IMPROVEMENTS - CONTRACT NO, 21-23, Reading: MAR1003VX, issued 2022-05-11
- MASSDOT NO. 607652 - EVERETT, MA, Everett: MAR1004M1, issued 2023-05-02
- REHABILITATION OF SECTIONS 24 & 25 WATER MAINS, Watertown: MAR1004RN, issued 2023-08-22
- NORTH ANDOVER, MA - WILLOWS & JASMINE PS, North Andover: MAR1005YW, issued 2025-09-30
- CENTRALVILLE PHASE I - MAINLINE CONDUIT AND SEPARATION OUTFALL, Lowell: MAR10064H, issued 2026-01-02
- 970 BROADWAY ROAD, DRACUT, MA 01826, Dracut: MAR10065D, issued 2026-02-11
Coverages issued nearest MAR1005M4
- 2025-03-05: HINCKLEYS POND-HERRING RIVER HEADWATERS ECO-RESTORATION, Harwich: MAR1005LZ, held by SumCo Eco-Contracting, LLC
- 2025-03-05: 189 NANTASKET AVE. MIXED-USE REDEVELOPMENT, Hull: MAR1005M0, held by The Procopio Companies
- 2025-03-06: TUFTS UNIVERSITY RESIDENCE HALLS, Medford: MAR1005M1, held by Keith Melanson
- 2025-03-06: PROSPECT GROVE ESTATES, Norwood: MAR1005M2, held by The Marion Group, LLC
- 2025-03-07: CENTURY DRIVE INDUSTRIAL PARK, West Boylston: MAR1005M3, held by Birdland Hill, LLC
- 2025-03-08: WHITE STADIUM WEST GRANDSTAND, Boston: MAR1005M5, held by JDC Demo and Abatement
- 2025-03-10: RECONSTRUCTION/REHABILITATION ON ROUTE 12 (CENTRAL STREET), Leominster: MAR1005M6, held by JH Lynch & Sons, Inc.
- 2025-03-10: HARWICH, ROUTE 28, SIDEWALK INSTALLATION, Harwich: MAR1005M7, held by Massachusetts Department of Transportation - District 5
- 2025-03-11: A.F. AMORELLO & SONS, INC.: SOUTHBRIDGE,MA - RECONSTRUCTION OF CRANE & RIVER ST., Southbridge: MAR1005M8, held by A.F. Amorello & Sons, Inc.
- 2025-03-12: PHASE II BUTTONWOOD BROOK WATER QUALITY IMPROVEMENTS, New Bedford: MAR1005M9, held by P.A. Landers, Inc.
METHUEN, MA - ARLINGTON NEIGHBORHOOD INFRASTRUCTURE IMP. - PHASE 1 among its neighbors
61 discharge permits are in the Spicket River subwatershed (HUC 010700061102); MAR1005M4 is one.
Other permits in the Spicket River subwatershed (HUC 010700061102)
- 233 LAWRENCE ROAD, Salem: NHR1001UW, minor, term to 2027-02-16
- 33 DANTON DRIVE - JESSIE'S BAKERY, Methuen: MAR1004AJ, minor, term to 2027-02-16
- 370 NORTH BROADWAY - SITE PLAN PHASE 1, Salem: NHR1002BU, minor, term to 2027-02-16
- 3M SALEM, Salem: NHNOE3365, minor, term to 2023-01-08
- 4 LOT SUBDIVISION - FOREMAN LANE, Pelham: NHR10015K, minor, term to 2022-02-15
- 6 INDUSTRIAL WAY WAREHOUSE SITE PLAN, Salem: NHR1001DT, minor, term to 2022-02-15
- 610924- LAWRENCE- ROADWAY RECONSTRUCTION ON AMESBURY STREET, Lawrence: MAR1005LR, minor, term to 2027-02-16
- ANAREN CERAMICS, Salem: NHNOE3354, minor, term to 2022-11-01
- AQUA LINE UTILITY, INC.: METHUEN, MA - LOWELL STREET DRAINAGE IMPROVEMENTS, Methuen: MAR1005MI, minor, term to 2027-02-16
- BRAEMOOR RIDGE, Salem: NHR12AD65
What stands out
- Its term runs 1 year and 346 days, March 7, 2025 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | METHUEN, MA - ARLINGTON NEIGHBORHOOD INFRASTRUCTURE IMP. - PHASE 1 |
|---|---|
| Permittee | Albanese D&S, Inc. |
| NPDES ID | MAR1005M4 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 7, 2025 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Methuen, Ma, MA 01844 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Spicket River (HUC 010700061102) |
NPDES MAR1005M4: effluent limits and exceedances
METHUEN, MA - ARLINGTON NEIGHBORHOOD INFRASTRUCTURE IMP. - PHASE 1 (NPDES MAR1005M4): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1005M4: no pollutant row on file.
NPDES MAR1005M4: inspections, violations and enforcement
NPDES MAR1005M4 (METHUEN, MA - ARLINGTON NEIGHBORHOOD INFRASTRUCTURE IMP. - PHASE 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1005M4
NPDES MAR1005M4: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1005M4
NPDES MAR1005M4: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.