NPDES MAR1005M6 · Clean Water Act
RECONSTRUCTION/REHABILITATION ON ROUTE 12 (CENTRAL STREET), Leominster, MA: NPDES MAR1005M6 discharge permit, effluent exceedances, inspections, penalties
RECONSTRUCTION/REHABILITATION ON ROUTE 12 (CENTRAL STREET), Leominster, Massachusetts: General permit coverage MAR1005M6, held by JH Lynch & Sons, Inc.; Construction stormwater; Effective; issued March 10, 2025, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 2,269 were issued before MAR1005M6. JH Lynch & Sons, Inc. holds 7 permits in Massachusetts.
Other permits held by JH Lynch & Sons, Inc.
- DONALD J. LYNCH BOULEVARD IMPROVEMENTS, Marlborough: MAR1003JH, issued 2021-09-30
- PROPOSED HOSPITAL DRIVE SUBDIVISION - PHASE 2, Worcester: MAR1003PU, issued 2022-02-04
- MAIN STREET/122 A DRAINAGE IMPROVEMENTS PROJECT, Holden: MAR1003S6, issued 2022-03-22
- RESURFACING & RELATED WORK ON A SECTION OF ROUTE 9, Spencer: MAR1005NA, issued 2025-03-28
- REPLACEMENT OF RUNWAY 29 DEPARTURE END EMAS, Worcester: MAR1005VC, issued 2025-08-07
- COMPLETE STREETS IMPROVEMENTS: ENDICOTT, BIGELOW, IN THE CITY OF WORCESTER, Worcester: MAR10067Z, issued 2026-03-16
Coverages issued nearest MAR1005M6
- 2025-03-06: TUFTS UNIVERSITY RESIDENCE HALLS, Medford: MAR1005M1, held by Keith Melanson
- 2025-03-06: PROSPECT GROVE ESTATES, Norwood: MAR1005M2, held by The Marion Group, LLC
- 2025-03-07: CENTURY DRIVE INDUSTRIAL PARK, West Boylston: MAR1005M3, held by Birdland Hill, LLC
- 2025-03-07: METHUEN, MA - ARLINGTON NEIGHBORHOOD INFRASTRUCTURE IMP. - PHASE 1, Methuen, Ma: MAR1005M4, held by Albanese D&S, Inc.
- 2025-03-08: WHITE STADIUM WEST GRANDSTAND, Boston: MAR1005M5, held by JDC Demo and Abatement
- 2025-03-10: HARWICH, ROUTE 28, SIDEWALK INSTALLATION, Harwich: MAR1005M7, held by Massachusetts Department of Transportation - District 5
- 2025-03-11: A.F. AMORELLO & SONS, INC.: SOUTHBRIDGE,MA - RECONSTRUCTION OF CRANE & RIVER ST., Southbridge: MAR1005M8, held by A.F. Amorello & Sons, Inc.
- 2025-03-12: PHASE II BUTTONWOOD BROOK WATER QUALITY IMPROVEMENTS, New Bedford: MAR1005M9, held by P.A. Landers, Inc.
- 2025-03-12: 121 GROVE STREET, FRANKLIN MA, Franklin: MAR1005MA, held by Fairfield Residential
- 2025-03-12: NORTHFIELD MOUNT HERMON HOCKEY ARENA, Gill: MAR1005MB, held by Northfield Mount Hermon (Mary McEneany)
RECONSTRUCTION/REHABILITATION ON ROUTE 12 (CENTRAL STREET) among its neighbors
66 discharge permits are in the Monoosnoc Brook-North Nashua River subwatershed (HUC 010700040103); MAR1005M6 is one.
Other permits in the Monoosnoc Brook-North Nashua River subwatershed (HUC 010700040103)
- #119986 LEOMINSTER, VISCOLOID AVE., ROADWAY RECONSTRUCTION & RELATED WORK, Leominster: MAR1004HJ, minor, term to 2027-02-16
- 0 HILLTOP ROAD SUBDIVISION, Lancaster: MAR1005CY, minor, term to 2027-02-16
- 110 LEOMINSTER ROAD GAS STATION - STERLING, Sterling: MAR1005ZG, minor, term to 2027-02-16
- 119986 P.J. ALBERT: LEOMINSTER, MA - ROADWAY RECONSTRUCTION AT VISCOLOID AVE, Leominster: MAR1004BS, minor, term to 2027-02-16
- 201 HILL TOP, Lancaster: MAR1005CT, minor, term to 2027-02-16
- 21 JUNGLE ROAD, LEOMINSTER, Leominster: MAR1005DY, minor, term to 2027-02-16
- 313/343/O141/P142 ACR AND ACCESS ROAD IMPROVEMENT PROJECT, Sterling: MAR1005L9, minor, term to 2027-02-16
- 35 PRATTS JUNCTION PAVING MAINTENANCE PROJECT, Sterling: MAR1006DF, minor, term to 2027-02-16
- 610731 FITCHBURG, RT. 2 RESURFACING & RELATED WORK, Fitchburg: MAR1004PU, minor, term to 2027-02-16
- 72 JUNGLE ROAD GRAVEL PIT, Leominster: MAR1005YK, minor, term to 2027-02-16
What stands out
- Its term runs 1 year and 343 days, March 10, 2025 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | RECONSTRUCTION/REHABILITATION ON ROUTE 12 (CENTRAL STREET) |
|---|---|
| Permittee | JH Lynch & Sons, Inc. |
| NPDES ID | MAR1005M6 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 10, 2025 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Leominster, MA 01453 |
| Subwatershed | Monoosnoc Brook-North Nashua River (HUC 010700040103) |
NPDES MAR1005M6: effluent limits and exceedances
RECONSTRUCTION/REHABILITATION ON ROUTE 12 (CENTRAL STREET) (NPDES MAR1005M6): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1005M6: no pollutant row on file.
NPDES MAR1005M6: inspections, violations and enforcement
NPDES MAR1005M6 (RECONSTRUCTION/REHABILITATION ON ROUTE 12 (CENTRAL STREET)): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1005M6
NPDES MAR1005M6: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1005M6
NPDES MAR1005M6: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.