NPDES MAR100620 · Clean Water Act
HANSCOM FIELD WATER DISTRIBUTION SYSTEM UPGRADES, Bedford, MA: NPDES MAR100620 discharge permit, effluent exceedances, inspections, penalties
HANSCOM FIELD WATER DISTRIBUTION SYSTEM UPGRADES, Bedford, Massachusetts: General permit coverage MAR100620, held by Massachusetts Port Authority; Construction stormwater; Effective; issued November 17, 2025, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 2,733 were issued before MAR100620. Massachusetts Port Authority holds 16 permits in Massachusetts.
Other permits held by Massachusetts Port Authority
- LOGAN INTL AIRPORT TERMINAL C CANOPY AND CENTRAL/WEST GARAGE ACCESS ROADWAYS, East Boston: MAR10020D, issued 2019-05-15
- LOGAN AIRPORT - REHABILITATION OF RUNWAY 14-32, TAXIWAY S J/J1, East Boston: MAR1003F8, issued 2021-07-29
- RICHARDS/CYPHER/E/FARGO ROADWAY RECONSTRUCTION, South Boston: MAR1004SX, issued 2023-09-08
- CONLEY TERMINAL CONTAINER STORAGE PHASE I M549-C1 (BULKHEAD REPAIR), South Boston: MAR1004ZZ, issued 2024-01-23
- FRAMINGHAM LOGAN EXPRESS OVERFLOW LOT REVENUE CONTROLS, Framingham: MAR10056V, issued 2024-05-06
- CONLEY TERMINAL CONTAINER STORAGE PHASE II M549-C2 (TERMINAL EXPANSION), South Boston: MAR10058J, issued 2024-06-03
- SALT STORAGE FACILITY LAURENCE G. HANSCOM FIELD, Bedford: MAR10059D, issued 2024-06-20
- MPA PROJECT NO. H288 RUNWAY 5-23 REHABILITATION, Bedford: MAR1005BW, issued 2024-08-06
- MASSPORT TERMINAL E GARAGE, CURBSIDE , ROADWAYS, LOGAN AIRPORT, East Boston: MAR1005Y5, issued 2025-09-23
- DANVERS LOGAN EXPRESS SITE WORK MPA CONTRACT NO. L1830-C3, Danvers: MAR10062X, issued 2025-12-18
Coverages issued nearest MAR100620
- 2025-11-17: RINGER PARK, Allston: MAR10060X, held by BPRD
- 2025-11-17: 32R HILL STREET, MEDWAY, MA, Medway: MAR10061I, held by Zeus Construction LLC
- 2025-11-17: BLACKINTON INFRASTRUCTURE IMPROVEMENT PHASE II, North Adams: MAR10061P, held by Western Earthworks, LLC
- 2025-11-17: CHRISTIAN HILL HOMES, Lowell: MAR10061Y, held by Christian Hill Homes, LLC
- 2025-11-17: MIT DAPER FIELD, Cambridge: MAR10061Z, held by Columbia Construction Company
- 2025-11-18: NUTTING ROAD PFAS TREATMENT PLANT, Westford: MAR10061E, held by R.H. White Construction
- 2025-11-18: 3 RICKETTS POND DRIVE (REAR BUILDING), Carver: MAR100625, held by Mike Facchini
- 2025-11-18: LAKEVILLE NEW FIRE STATION, Lakeville: MAR100629, held by Rudy V. Pompeo, Inc.
- 2025-11-20: UMASS DARTMOUTH LARTS PROJECT, Dartmouth: MAR10060H, held by Bond Building Construction, Inc.
- 2025-11-20: EAST BOSTON SEWER SEPARATION PHASE IV, CONTRACT 1, East Boston: MAR10062C, held by P. Gioioso & Sons, Inc.
HANSCOM FIELD WATER DISTRIBUTION SYSTEM UPGRADES among its neighbors
88 discharge permits are in the Upper Shawsheen River subwatershed (HUC 010700061301); MAR100620 is one. Its county: 539, 13 major; MAR100620 is minor permit.
Other permits in the Upper Shawsheen River subwatershed (HUC 010700061301)
- 1366 TECHNOLOGIES INC., Bedford: MANOEJ033, minor, term to 2024-11-20
- 17 HARTWELL AVE, Lexington: MAR1005MV, minor, term to 2027-02-16
- 172 MIDDLESEX TURNPIKE, Bedford: MAR1003FH, minor, term to 2022-02-15
- 2019 EMD MILLIPORE DEMOLITION PROJECT, Bedford: MAR1002E0, minor, term to 2022-02-15
- 25 NETWORK DRIVE OFFICE/LAB/MANUFACTURING BUILDING, Burlington: MAR100411, minor, term to 2027-02-16
- 28 MERIAM STREET, Lexington: MAR1005DR, minor, term to 2027-02-16
- 3-5 MILITIA DRIVE, Lexington: MAR1006CF, minor, term to 2027-02-16
- 3-5 MILITIA DRIVE, Lexington: MAR1006FY, minor, term to 2027-02-16
- 40 MIDDLESEX TURNPIKE, Bedford: MAR1005LP, minor, term to 2027-02-16
- 7 HARTWELL AVENUE, Lexington: MAG912279, minor, term to 2027-08-01
What stands out
- Its term runs 1 year and 91 days, November 17, 2025 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | HANSCOM FIELD WATER DISTRIBUTION SYSTEM UPGRADES |
|---|---|
| Permittee | Massachusetts Port Authority |
| NPDES ID | MAR100620 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 17, 2025 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Bedford, MA 01730 |
| Subwatershed | Upper Shawsheen River (HUC 010700061301) |
| Other EPA IDs (FRS) | RCRA handler MAD981070055 |
NPDES MAR100620: effluent limits and exceedances
HANSCOM FIELD WATER DISTRIBUTION SYSTEM UPGRADES (NPDES MAR100620): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR100620: no pollutant row on file.
NPDES MAR100620: inspections, violations and enforcement
NPDES MAR100620 (HANSCOM FIELD WATER DISTRIBUTION SYSTEM UPGRADES): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR100620
NPDES MAR100620: one email when its EPA record changes — $99/month.
Permits near NPDES MAR100620
NPDES MAR100620: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.