NPDES MAR1006GF · Clean Water Act
WORCESTER REGIONAL AIRPORT PERMANENT (OVERFLOW) PARKING LOT, Worcester, MA: NPDES MAR1006GF discharge permit, effluent exceedances, inspections, penalties
WORCESTER REGIONAL AIRPORT PERMANENT (OVERFLOW) PARKING LOT, Worcester, Massachusetts: General permit coverage MAR1006GF, held by Massachusetts Port Authority; Construction stormwater; Effective; issued August 7, 2026, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 3,213 were issued before MAR1006GF. Massachusetts Port Authority holds 16 permits in Massachusetts.
Other permits held by Massachusetts Port Authority
- LOGAN INTL AIRPORT TERMINAL C CANOPY AND CENTRAL/WEST GARAGE ACCESS ROADWAYS, East Boston: MAR10020D, issued 2019-05-15
- LOGAN AIRPORT - REHABILITATION OF RUNWAY 14-32, TAXIWAY S J/J1, East Boston: MAR1003F8, issued 2021-07-29
- RICHARDS/CYPHER/E/FARGO ROADWAY RECONSTRUCTION, South Boston: MAR1004SX, issued 2023-09-08
- CONLEY TERMINAL CONTAINER STORAGE PHASE I M549-C1 (BULKHEAD REPAIR), South Boston: MAR1004ZZ, issued 2024-01-23
- FRAMINGHAM LOGAN EXPRESS OVERFLOW LOT REVENUE CONTROLS, Framingham: MAR10056V, issued 2024-05-06
- CONLEY TERMINAL CONTAINER STORAGE PHASE II M549-C2 (TERMINAL EXPANSION), South Boston: MAR10058J, issued 2024-06-03
- SALT STORAGE FACILITY LAURENCE G. HANSCOM FIELD, Bedford: MAR10059D, issued 2024-06-20
- MPA PROJECT NO. H288 RUNWAY 5-23 REHABILITATION, Bedford: MAR1005BW, issued 2024-08-06
- MASSPORT TERMINAL E GARAGE, CURBSIDE , ROADWAYS, LOGAN AIRPORT, East Boston: MAR1005Y5, issued 2025-09-23
- HANSCOM FIELD WATER DISTRIBUTION SYSTEM UPGRADES, Bedford: MAR100620, issued 2025-11-17
Coverages issued nearest MAR1006GF
- 2026-08-05: TOWN OF CONCORD LANDFILL SOLAR PROJECT, Concord: MAR1006G8, held by Kearsarge Walden St LLC
- 2026-08-05: WORCESTER REGIONAL AIRPORT PERMANENT (OVERFLOW) PARKING LOT, Worcester: MAR1006G9, held by Shawmut Design and Construction
- 2026-08-05: PALMER HEALTHCARE CENTER, Palmer: MAR1006GA, held by Timberline Construction Corporation
- 2026-08-06: APPLIED MATERIALS BUILDING ADDITION, Gloucester: MAR1006G4, held by IPS-Integrated Project Services, LLC
- 2026-08-07: GLENVIEW LANDFILL - PROPOSED CAP MODIFICATION & SOLAR PHOTOVOLTAIC FACILITY, Chelmsford: MAR1006GC, held by Helios Energy
- 2026-08-10: MIT MILLSTONE WATER MAIN EXTENSION, Westford: MAR1006GG, held by McCourt Construction Company
- 2026-08-10: PROPOSED ROOSEVELT PARK IMPROVEMENTS, Malden: MAR1006GH, held by R.A.D. Sports
- 2026-08-12: 609409-133236 J.F. WHITE: SPRINGFIELD, MA- BRIDGE REPLACEMENT ON ARMORY STREET, Springfield: MAR1006G5, held by J.F. White Contracting Co.
- 2026-08-12: THE RESIDENCES AT WELLINGTON STATION, Medford: MAR1006GJ, held by Wellington - T Owner, LLC
- 2026-08-13: 154 &158 SALEM STREET, Wakefield: MAR1006FT, held by Wakefield Salem Street LLC
WORCESTER REGIONAL AIRPORT PERMANENT (OVERFLOW) PARKING LOT among its neighbors
76 discharge permits are in the Tatnuck Brook-Blackstone River subwatershed (HUC 010900030102); MAR1006GF is one. Its county: 391, 23 major; MAR1006GF is minor permit.
Other permits in the Tatnuck Brook-Blackstone River subwatershed (HUC 010900030102)
- #605377, MILLBURY, MCCRACKEN RD & GREENWOOD ST RECONSTRUCTION, Millbury: MAR100554, minor, term to 2027-02-16
- 185 MADISON ST, Worcester: MAR1003T6, minor, term to 2027-02-16
- 185 MADISON STREET, Worcester: MAR10033S, minor, term to 2022-02-15
- 222 BROOKS STREET - RESIDENTIAL, Worcester: MAR1003WY, minor, term to 2027-02-16
- 222 BROOKS STREET - RESIDENTIAL, Worcester: MAR1003WZ, minor, term to 2027-02-16
- 47R FOURTH STREET, Worcester: MAR1004MI, minor, term to 2027-02-16
- 50 & 190 WASHINGTON STREET, AUBURN, Auburn: MAR1005R1, minor, term to 2027-02-16
- 91 WORCESTER-PROVIDENCE TURNPIKE, MILLBURY, MA, Millbury: MAR1005SM, minor, term to 2027-02-16
- 92 GRAND STREET, Worcester: MAR10035U, minor, term to 2022-02-15
- 939 SOUTHBRIDGE STREET REPAVING AND GARAGE EXPANSION, Worcester: MAR10064P, minor, term to 2027-02-16
What stands out
- Its term runs 193 days, August 7, 2026 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | WORCESTER REGIONAL AIRPORT PERMANENT (OVERFLOW) PARKING LOT |
|---|---|
| Permittee | Massachusetts Port Authority |
| NPDES ID | MAR1006GF |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 7, 2026 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Worcester, MA 01602 |
| Subwatershed | Tatnuck Brook-Blackstone River (HUC 010900030102) |
| Other EPA IDs (FRS) | RCRA handler MAR000502997 |
NPDES MAR1006GF: effluent limits and exceedances
WORCESTER REGIONAL AIRPORT PERMANENT (OVERFLOW) PARKING LOT (NPDES MAR1006GF): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1006GF: no pollutant row on file.
NPDES MAR1006GF: inspections, violations and enforcement
NPDES MAR1006GF (WORCESTER REGIONAL AIRPORT PERMANENT (OVERFLOW) PARKING LOT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1006GF
NPDES MAR1006GF: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1006GF
NPDES MAR1006GF: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.