Clean Water Act discharge permit · NPDES AZR10I0LF
NA-18-W59 WHITEROCK SOUTH WATERLINE EXTENSION, Whiterock, NM: NPDES AZR10I0LF discharge permit, effluent exceedances, inspections, penalties
- Administratively continuedPermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
NA-18-W59 WHITEROCK SOUTH WATERLINE EXTENSION, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY, holds NPDES permit AZR10I0LF. EPA’s file records it issued August 25, 2020 and expiring February 15, 2022. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for NA-18-W59 WHITEROCK SOUTH WATERLINE EXTENSION: its NPDES ID, its permit type and status, its dates, its address in Whiterock, New Mexico. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES AZR10I0LF.
Identity
| Facility as filed | NA-18-W59 WHITEROCK SOUTH WATERLINE EXTENSION |
|---|---|
| Permittee as filed | NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY |
| NPDES ID | AZR10I0LF |
| Permit status | Administratively continued (past its expiration date and still in force until reissued) |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | August 25, 2020 |
| Expiration date | February 15, 2022 |
| Issuing agency | U.S. EPA |
| Address | Whiterock, NM 87313 |
| Subwatershed | Juans Lake-Kim-me-ni-oli Wash (HUC 140801060503) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES AZR10I0LF.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES AZR10I0LF.
Inspections
EPA’s inspection file holds no inspection for NPDES AZR10I0LF.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES AZR10I0LF.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, AZR10I0LF.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID AZR10I0LF there.
NA-18-W59 WHITEROCK SOUTH WATERLINE EXTENSION, Whiterock, New Mexico: Coverage under a general permit AZR10I0LF, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY; Construction stormwater; Administratively continued (past its expiration date and still in force until reissued); issued August 25, 2020, term to February 15, 2022, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 138 were issued before AZR10I0LF. NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY holds 131 permits in New Mexico.
Other permits held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- NA-13-Z89/Z90 NAVAJO GALLUP WATER SUPPLY PROJECT REACH 14.1 AND 14.2, Churchrock: AZR10I01Y, issued 2017-05-17
- NA-17-F58 FFO HOUSING SCATTERED XI, Nageezi: AZR10I0A3, issued 2018-07-02
- NA-17-W20 SHIPROCK NORTH LIFT STATION REPLACEMENT, Shiprock: AZR10I0KC, issued 2020-04-08
- NA-18-U67 RAMAH WHITEROCK UNIT ONE CISTERNS, Mountain View: AZR10I0LE, issued 2020-08-25
- NA-17-U21/X09: BURNHAM HUNTER WASH WATERLINE EXTENSION, Burnham: AZR10I0M5, issued 2020-10-29
- NA-19-F96 FFO HOUSING SCATTERED XIII, Nageezi: AZR10I0O9, issued 2021-04-28
- C014524 PROJECT # N11 (1A) 1,2&4 MARIANO LAKE, NEW MEXICO: NECA 1416, Mariano Lake: AZR10I0OA, issued 2021-04-28
- THOREAU WELL CONNECTION PROJECT: NECA 1413, Thoreau: AZR10I0OM, issued 2021-05-26
- NA-19-F94 SHIPROCK EAST SCATTERED XVII, Shiprock: AZR10I0OR, issued 2021-06-01
- NA-19-G02 CROWNPOINT SCATTERED HOUSING 2019, Crownpoint: AZR10I0PL, issued 2021-08-03
Coverages issued nearest AZR10I0LF
- 2020-08-12: 2200 VISTA ORIENTE NW, Albuquerque: NMR10036M, held by Tuan Huynh
- 2020-08-18: CN2101360R NM176, Eunice: NMR10036U, held by James Hamilton Construction Co
- 2020-08-20: SINGLE FAMILY HOME - 2243 GUAMIS RD, Las Cruces: NMR10036X, held by Bosque Construction LLC
- 2020-08-21: KIDDIE ACADEMY WESTSIDE, Albuquerque: NMR100370, held by Azaan Holdings
- 2020-08-25: NA-18-U67 RAMAH WHITEROCK UNIT ONE CISTERNS, Mountain View: AZR10I0LE, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2020-08-28: COLIBRI PHASE 1 & 2, Santa Fe: NMR10037I, held by Pulte Homes of New Mexico
- 2020-09-03: CROWNPOINT YOUTH COMPLEX, Crownpoint: AZR10I0LJ, held by Arviso Construction Co, Inc.
- 2020-09-04: PHASE 3 LOMAS ENCANTADAS 2B SUBDIVISION, Rio Rancho: NMR100388, held by Lomas Encantadas Development Company, LLC
- 2020-09-09: MDPR, Los Alamos: NMR10038V, held by Newport News Nuclear, BWXT, Los Alamos
- 2020-09-18: SEVANO PLACE SUBDIVISION, Albuquerque: NMR10039R, held by Sevano, LLC
NA-18-W59 WHITEROCK SOUTH WATERLINE EXTENSION among its neighbors
4 discharge permits are in the Juans Lake-Kim-me-ni-oli Wash subwatershed (HUC 140801060503); AZR10I0LF is one.
Other permits in the Juans Lake-Kim-me-ni-oli Wash subwatershed (HUC 140801060503)
- LAKE VALLEY BOARDING SCHOOL, Lake Valley: NN0021016, minor, term to 2014-11-30
- NA-20-LE6 HUERFANO CARSON NORTH CISTERNS PHASE I, Lake Valley: AZR10I0WO, minor, term to 2027-02-16
- NA-20-LE6, HUERFANO CARSON NORTH CISTERNS PHASE 1, Lake Valley: AZR10I0VM, minor, term to 2027-02-16
Nearby on the register
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
The NA-18-W59 WHITEROCK SOUTH WATERLINE EXTENSION is one of 1 storm water construction permits on EPA's NPDES register in Whiterock, the only such permit in that city, and it sits among 4 NPDES permits in the Juans Lake-Kim-me-ni-oli Wash subwatershed, this one included. The permit records no pollutants under a numeric limit and no effluent exceedances, each counted at 0.