NPDES AZR10I0OR · Clean Water Act
NA-19-F94 SHIPROCK EAST SCATTERED XVII, Shiprock, NM: NPDES AZR10I0OR discharge permit, effluent exceedances, inspections, penalties
NA-19-F94 SHIPROCK EAST SCATTERED XVII, Shiprock, New Mexico: General permit coverage AZR10I0OR, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY; Construction stormwater; Administratively continued; issued June 1, 2021, term to February 15, 2022, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 289 were issued before AZR10I0OR. NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY holds 131 permits in New Mexico.
Other permits held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- NA-13-Z89/Z90 NAVAJO GALLUP WATER SUPPLY PROJECT REACH 14.1 AND 14.2, Churchrock: AZR10I01Y, issued 2017-05-17
- NA-17-F58 FFO HOUSING SCATTERED XI, Nageezi: AZR10I0A3, issued 2018-07-02
- NA-17-W20 SHIPROCK NORTH LIFT STATION REPLACEMENT, Shiprock: AZR10I0KC, issued 2020-04-08
- NA-18-U67 RAMAH WHITEROCK UNIT ONE CISTERNS, Mountain View: AZR10I0LE, issued 2020-08-25
- NA-18-W59 WHITEROCK SOUTH WATERLINE EXTENSION, Whiterock: AZR10I0LF, issued 2020-08-25
- NA-17-U21/X09: BURNHAM HUNTER WASH WATERLINE EXTENSION, Burnham: AZR10I0M5, issued 2020-10-29
- NA-19-F96 FFO HOUSING SCATTERED XIII, Nageezi: AZR10I0O9, issued 2021-04-28
- C014524 PROJECT # N11 (1A) 1,2&4 MARIANO LAKE, NEW MEXICO: NECA 1416, Mariano Lake: AZR10I0OA, issued 2021-04-28
- THOREAU WELL CONNECTION PROJECT: NECA 1413, Thoreau: AZR10I0OM, issued 2021-05-26
- NA-19-G02 CROWNPOINT SCATTERED HOUSING 2019, Crownpoint: AZR10I0PL, issued 2021-08-03
Coverages issued nearest AZR10I0OR
- 2021-05-24: BRIDGE 8130 REPLACEMENT PROJECT - NMDOT CN: F100290, C5182658, Bloomfield: NMR1003WJ, held by Kiewit of New Mexico, Co.
- 2021-05-24: SINGLE FAMILY HOME - 5870 QUESENBERRY, Las Cruces: NMR1003WK, held by Warren Construction Inc.
- 2021-05-26: THOREAU WELL CONNECTION PROJECT: NECA 1413, Thoreau: AZR10I0OM, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2021-05-27: 5 CAMINO ROSILLO, Santa Fe: NMR1003X0, held by Prull Custom Builders
- 2021-05-27: TA-IV CHILLED WATER LOOP, Albuquerque: NMR1003X1, held by National Technology & Engineering Solutions of Sandia, LLC
- 2021-06-01: LEGACY AT SIERRA VISTA, Los Lunas: NMR1003X6, held by HAKES BROTHERS ABQ
- 2021-06-03: COLUMBUS (11) DNMP, LLC, Columbus: NMR1003XG, held by Franklin Land Associates, LLC
- 2021-06-03: PALOMAS MEADOWS SUBDIVISION, Albuquerque: NMR1003XH, held by Clearbrook Investments, Inc.
- 2021-06-03: PALOMAS MEADOWS SUBDIVISION, Albuquerque: NMR1003XI, held by Stillbrooke Homes, Inc. A New Mexico Corporation
- 2021-06-03: LA ENTRADA SUBDIVISION, Santa Teresa: NMR1003XJ, held by Hakes Brothers
NA-19-F94 SHIPROCK EAST SCATTERED XVII among its neighbors
87 discharge permits are in the Rattlesnake Wash-San Juan River subwatershed (HUC 140801050704); AZR10I0OR is one.
Other permits in the Rattlesnake Wash-San Juan River subwatershed (HUC 140801050704)
- (F79) SHIPROCK MEDICAL REFERRAL XVI, Shiprock: AZR10I0PK, minor, term to 2022-02-15
- (F94) SHIPROCK EAST SCATTERED XVII, Shiprock: AZR10I0OH, minor, term to 2022-02-15
- (G23) SHIPROCK EAST SCATTERED XVIII, Shiprock: AZR10I0VI, minor, term to 2027-02-16
- (G38) SHIPROCK MEDICAL REFERRALS, Shiprock: AZR10I160, minor, term to 2027-02-16
- (G40) SHIPROCK EAST SCATTERED XIX, Shiprock: AZR10I12H, minor, term to 2027-02-16
- (G52) SHIPROCK EAST SCATTERED HOUSING 2023, Shiprock: AZR10I17P, minor, term to 2027-02-16
- (LI7) SHIPROCK SU FAILED DRAINFIELDS, Shiprock: AZR10I0VH, minor, term to 2027-02-16
- (LJ6) SHIPROCK FARM AREA CISTERN, Shiprock: AZR10I0ZH
- (LM6) SHIPROCK FAILED DRAINFIELD SYSTEMS, Shiprock: AZR10I10G, minor, term to 2027-02-16
- (LM9) SHIPROCK SU FAILED SEPTIC SYSTEM DL2 DL3, Shiprock: AZR10I12I, minor, term to 2027-02-16
What stands out
- Its term runs 259 days, June 1, 2021 to February 15, 2022; the term ended 1,673 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NA-19-F94 SHIPROCK EAST SCATTERED XVII |
|---|---|
| Permittee | NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY |
| NPDES ID | AZR10I0OR |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 1, 2021 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Shiprock, NM 87420 |
| Subwatershed | Rattlesnake Wash-San Juan River (HUC 140801050704) |
NPDES AZR10I0OR: effluent limits and exceedances
NA-19-F94 SHIPROCK EAST SCATTERED XVII (NPDES AZR10I0OR): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I0OR: no pollutant row on file.
NPDES AZR10I0OR: inspections, violations and enforcement
NPDES AZR10I0OR (NA-19-F94 SHIPROCK EAST SCATTERED XVII): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I0OR
NPDES AZR10I0OR: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I0OR
NPDES AZR10I0OR: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.