NPDES NMR1005DI · Clean Water Act
METRO VERDE NORTH PHASE 1 SUBDIVISION, Las Cruces, NM: NPDES NMR1005DI discharge permit, effluent exceedances, inspections, penalties
METRO VERDE NORTH PHASE 1 SUBDIVISION, Las Cruces, New Mexico: General permit coverage NMR1005DI, held by SIerra Norte Development, Inc.; Construction stormwater; Effective; issued February 8, 2023, term to February 16, 2027, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 1,110 were issued before NMR1005DI. SIerra Norte Development, Inc. holds 19 permits in New Mexico.
Other permits held by SIerra Norte Development, Inc.
- METRO PARK VILLAGE PHASE 4 AND 5, Las Cruces: NMR100362, issued 2020-08-07
- THE TRAILS AT METRO PHASE 1 AND 2, Las Cruces: NMR1003EI, issued 2020-11-16
- PEACHTREE HILLS RD STORMWATER CROSSING, Las Cruces: NMR1003EJ
- RED HAWK ESTATES, PHASE 2, Las Cruces: NMR1004AI, issued 2021-11-01
- METRO VERDE SOUTH PHASES 3E AND 3F, Las Cruces: NMR1004EH, issued 2022-01-03
- METRO VERDE ARCADIA SUBDIVISION PHASE 1, Las Cruces: NMR1004HQ, issued 2022-02-14
- SONOMA RANCH EAST II PHASE 11, Las Cruces: NMR1004NV, issued 2022-04-21
- RED HAWK CENTRAL SUBDIVISION, Las Cruces: NMR1005H4, issued 2023-03-28
- SONOMA-CENTRAL SUBDIVISION PHASE 1 DEVELOPER, Las Cruces: NMR1005Z9, issued 2023-11-07
- METRO EVOLUTION PHASE 2 SUBDIVISION, Las Cruces: NMR10068K, issued 2024-02-27
Coverages issued nearest NMR1005DI
- 2023-02-06: SINGLE FAMILY RESIDENCE – 7290 ALDRICH, Las Cruces: NMR1005D3, held by Maribel Melendez
- 2023-02-07: THE SANDS VILLAGE APARTMENTS, Las Cruces: NMR1005D7, held by GBL, LLC
- 2023-02-08: BRIDGE BOULEVARD RECONSTRUCTION PROJECT PHASE 2, Albuquerque: NMR1005DC, held by Bernalillo County
- 2023-02-08: 3113 VILLAGE DRIVE, Santa Few: NMR1005DF, held by Jesse Gries
- 2023-02-08: BLACKROCK SERVICES HMA FACILITY CARMONY, Albuquerque: NMR1005DH, held by Black Rock Services, LLC
- 2023-02-09: LOT 4 RETAIL CENTER, Albuquerque: NMR1005DJ, held by Insight Construction
- 2023-02-10: ZOCALO PHASE 5, Santa Fe: NMR1005D9, held by TQM, LLC
- 2023-02-10: CAVERN CITY AIR TERMINAL RUNWAY 14R-32L RECONSTRUCTION, Carlsbad: NMR1005DN, held by Constructors, Inc
- 2023-02-13: NA-21-LI8 GALLUP NORTH FAILED SEPTIC SYSTEMS, Twin Lakes: AZR10I0Y4, held by Navajo Area Indian Health Service
- 2023-02-13: TAKE 5 CAR WASH COORS, Albuquerque: NMR1005DO, held by Boing US Holdco, Inc., dba Take 5 Car Wash
METRO VERDE NORTH PHASE 1 SUBDIVISION among its neighbors
84 discharge permits are in the Indian Lake subwatershed (HUC 130301030507); NMR1005DI is one.
Other permits in the Indian Lake subwatershed (HUC 130301030507)
- 15515 SPACE MURALS - SINGLE FAMILY RESIDENCE, Las Cruces: NMR1003BN, minor, term to 2022-02-15
- 15575 SPACE MURALS LANE DRIVEWAY AND BUILDING, Las Cruces: NMR1006TB, minor, term to 2027-02-16
- 6327 WAGONS EAST TRAIL - ROADRUNNER CONSTRUCTION, Las Cruces: NMR1004UG, minor, term to 2027-02-16
- 6351 WAGONS EAST TRAIL SFH, Las Cruces: NMR1004I8, minor, term to 2022-02-15
- AMBER MESA ROADS, Las Cruces: NMR1007FO, minor, term to 2027-02-16
- BERRY PATCH AVENUE ROADWAY AND DRAINAGE PROJECT, Las Cruces: NMR1002WX
- BERRY PATCH AVENUE ROADWAY AND DRAINAGE PROJECT, Las Cruces: NMR1002XA
- BRAHMAN DIVERSION CHANNEL EXTENSION (DRAGON FLY), Las Cruces: NMR10066F, minor, term to 2027-02-16
- DEVELOPMENT AT 9575 BATAAN MEMORIAL WEST, CONTRACTOR, Las Cruces: NMR1005H5, minor, term to 2027-02-16
- DEVELOPMENT AT 9575 BATAAN MEMORIAL WEST, OWNER, Las Cruces: NMR1005H6, minor, term to 2027-02-16
What stands out
- Its term runs 4 years and 8 days, February 8, 2023 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | METRO VERDE NORTH PHASE 1 SUBDIVISION |
|---|---|
| Permittee | SIerra Norte Development, Inc. |
| NPDES ID | NMR1005DI |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | February 8, 2023 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Las Cruces, NM 88012 |
| Subwatershed | Indian Lake (HUC 130301030507) |
NPDES NMR1005DI: effluent limits and exceedances
METRO VERDE NORTH PHASE 1 SUBDIVISION (NPDES NMR1005DI): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NMR1005DI: no pollutant row on file.
NPDES NMR1005DI: inspections, violations and enforcement
NPDES NMR1005DI (METRO VERDE NORTH PHASE 1 SUBDIVISION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NMR1005DI
NPDES NMR1005DI: one email when its EPA record changes — $99/month.
Permits near NPDES NMR1005DI
NPDES NMR1005DI: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.