NPDES NMR1004AI · Clean Water Act
RED HAWK ESTATES, PHASE 2, Las Cruces, NM: NPDES NMR1004AI discharge permit, effluent exceedances, inspections, penalties
RED HAWK ESTATES, PHASE 2, Las Cruces, New Mexico: General permit coverage NMR1004AI, held by SIerra Norte Development, Inc.; Construction stormwater; Administratively continued; issued November 1, 2021, term to February 15, 2022, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 443 were issued before NMR1004AI. SIerra Norte Development, Inc. holds 19 permits in New Mexico.
Other permits held by SIerra Norte Development, Inc.
- METRO PARK VILLAGE PHASE 4 AND 5, Las Cruces: NMR100362, issued 2020-08-07
- THE TRAILS AT METRO PHASE 1 AND 2, Las Cruces: NMR1003EI, issued 2020-11-16
- PEACHTREE HILLS RD STORMWATER CROSSING, Las Cruces: NMR1003EJ
- METRO VERDE SOUTH PHASES 3E AND 3F, Las Cruces: NMR1004EH, issued 2022-01-03
- METRO VERDE ARCADIA SUBDIVISION PHASE 1, Las Cruces: NMR1004HQ, issued 2022-02-14
- SONOMA RANCH EAST II PHASE 11, Las Cruces: NMR1004NV, issued 2022-04-21
- METRO VERDE NORTH PHASE 1 SUBDIVISION, Las Cruces: NMR1005DI, issued 2023-02-08
- RED HAWK CENTRAL SUBDIVISION, Las Cruces: NMR1005H4, issued 2023-03-28
- SONOMA-CENTRAL SUBDIVISION PHASE 1 DEVELOPER, Las Cruces: NMR1005Z9, issued 2023-11-07
- METRO EVOLUTION PHASE 2 SUBDIVISION, Las Cruces: NMR10068K, issued 2024-02-27
Coverages issued nearest NMR1004AI
- 2021-11-01: NA-19-G01 CHURCHROCK SCATTERED HOUSING 2019, Churchrock: AZR10I0RB, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2021-11-01: YELLOWMAN SIPHON HDPE CONSTRUCTION, Fruitland: AZR10I0RD, held by Meridian Contracting, Inc.
- 2021-11-01: SINGLE FAMILY HOME - 573 E. AFTON, La Mesa: NMR1004AD, held by JMS Construction
- 2021-11-01: SUNPORT TAXIWAY G1 RELOCATION AND TAXIWAY C FILLET REDUCTION, Albuquerque: NMR1004AF, held by TLC Plumbing and Utility
- 2021-11-01: RED HAWK ESTATES, PHASE 2, Las Cruces: NMR1004AH, held by Caliper Construction, Inc.
- 2021-11-02: RAISING CANE'S #705 ALBUQUERQUE, NM, Albuquerque: NMR1004AL, held by Raising Cane's Restaurants, LLC
- 2021-11-05: SINGLE FAMILY HOME - 170 S. TIERRA VISTA, Anthony: NMR1004AQ, held by Winton Flair Homes
- 2021-11-07: CLINES CORNERS WIND, Encino: NMR1004AR, held by Pattern Renewables 2 LP
- 2021-11-08: RIO VISTA 801 HWY 550, Bernalillo: NMR1004AS, held by Sheriff's Posse Hwy 550 Lot A, LLC
- 2021-11-08: PARKHILL ESTATES UNITS 6B & 7A, Las Cruces: NMR1004AV, held by Hakes Brothers
RED HAWK ESTATES, PHASE 2 among its neighbors
84 discharge permits are in the Indian Lake subwatershed (HUC 130301030507); NMR1004AI is one.
Other permits in the Indian Lake subwatershed (HUC 130301030507)
- 15515 SPACE MURALS - SINGLE FAMILY RESIDENCE, Las Cruces: NMR1003BN, minor, term to 2022-02-15
- 15575 SPACE MURALS LANE DRIVEWAY AND BUILDING, Las Cruces: NMR1006TB, minor, term to 2027-02-16
- 6327 WAGONS EAST TRAIL - ROADRUNNER CONSTRUCTION, Las Cruces: NMR1004UG, minor, term to 2027-02-16
- 6351 WAGONS EAST TRAIL SFH, Las Cruces: NMR1004I8, minor, term to 2022-02-15
- AMBER MESA ROADS, Las Cruces: NMR1007FO, minor, term to 2027-02-16
- BERRY PATCH AVENUE ROADWAY AND DRAINAGE PROJECT, Las Cruces: NMR1002WX
- BERRY PATCH AVENUE ROADWAY AND DRAINAGE PROJECT, Las Cruces: NMR1002XA
- BRAHMAN DIVERSION CHANNEL EXTENSION (DRAGON FLY), Las Cruces: NMR10066F, minor, term to 2027-02-16
- DEVELOPMENT AT 9575 BATAAN MEMORIAL WEST, CONTRACTOR, Las Cruces: NMR1005H5, minor, term to 2027-02-16
- DEVELOPMENT AT 9575 BATAAN MEMORIAL WEST, OWNER, Las Cruces: NMR1005H6, minor, term to 2027-02-16
What stands out
- Its term runs 106 days, November 1, 2021 to February 15, 2022; the term ended 1,673 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | RED HAWK ESTATES, PHASE 2 |
|---|---|
| Permittee | SIerra Norte Development, Inc. |
| NPDES ID | NMR1004AI |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 1, 2021 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Las Cruces, NM 88012 |
| Subwatershed | Indian Lake (HUC 130301030507) |
NPDES NMR1004AI: effluent limits and exceedances
RED HAWK ESTATES, PHASE 2 (NPDES NMR1004AI): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NMR1004AI: no pollutant row on file.
NPDES NMR1004AI: inspections, violations and enforcement
NPDES NMR1004AI (RED HAWK ESTATES, PHASE 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NMR1004AI
NPDES NMR1004AI: one email when its EPA record changes — $99/month.
Permits near NPDES NMR1004AI
NPDES NMR1004AI: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.