NPDES NMR1005PM · Clean Water Act
LRGPWW MESQUITE-BRAZITO WASTEWATER PROJECT - LIFT STATION 15, Mesilla Park, NM: NPDES NMR1005PM discharge permit, effluent exceedances, inspections, penalties
LRGPWW MESQUITE-BRAZITO WASTEWATER PROJECT - LIFT STATION 15, Mesilla Park, New Mexico: General permit coverage NMR1005PM, held by Lower Rio Grande Public Water Works Authority; Construction stormwater; Effective; issued July 4, 2023, term to February 16, 2027, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 1,328 were issued before NMR1005PM. Lower Rio Grande Public Water Works Authority holds 6 permits in New Mexico.
Other permits held by Lower Rio Grande Public Water Works Authority
- VALLE DEL RIO WATER SYSTEM IMPR PH II, La Mesa: NMR1002YM, issued 2020-05-15
- SOUTH VALLEY SERVICE AREA WATER SUPPLY AND TREATMENT, Mesquite: NMR1004DH, issued 2021-12-16
- LIFT STATION 16 WASTEWATER SYSTEM IMPROVEMENTS - ALONG EAST ORGAN RD, Mesilla Park: NMR1004N2, issued 2022-04-13
- MESQUITE-BRAZITO WASTEWATER SYSTEM: LIFT 12 IMPROVEMENTS, Mesilla Park: NMR1004RF, issued 2022-05-25
- MESQUITE-BRAZITO WASTEWATER SYSTEM: LIFT 11 IMPROVEMENTS CONTRACTOR, Mesquite: NMR1004WU, issued 2022-07-14
Coverages issued nearest NMR1005PM
- 2023-06-30: CERRILOS SENIOR CENTER & TURQUOISE TRAIL FIRE STATION #3, Los Cerrilos: NMR1005PC, held by Duke City Builders
- 2023-06-30: CERRILLOS SENIOR CENTER AND TURQUOISE TRAIL FIRE STATION #3, Los Cerrilos: NMR1005PD, held by Santa Fe County
- 2023-07-03: 500 BELEN PL., Las Cruces: NMR1005PE, held by Roberto Trigo
- 2023-07-03: JACKSON HILL QUARRY, Eagles Nest: NMR1005PI, held by Fisher Sand and Gravel of NM, Inc
- 2023-07-04: RZX PROPERTY LLC LOT 1 AND 2, Santa Fe Nm: NMR1005PK, held by RZX Property LLC
- 2023-07-04: VILLA ESCONDIDA PHASE II, Los Lunas: NMR1005PN, held by Villa E P2 LLC
- 2023-07-04: FOUR SINGLE FAMILY RESIDENCES AT 505 LUNA AZUL, CHAPARRAL, Chaparral: NMR1005PO, held by FMJ Construction
- 2023-07-06: SUNLAND PARK LEVEE REPAIR - 07, Chamberino: NMR1005PV, held by Odin Construction Solutions, LLC
- 2023-07-06: PINON ELEMENTARY SCHOOL REPLACEMENT, White Rock: NMR1005PW, held by Jaynes Corporation
- 2023-07-07: CN4100384R MORA/COLFAX COUNTIES, Guadalupe: NMR1005PY, held by Fisher Sand and Gravel of NM, Inc
LRGPWW MESQUITE-BRAZITO WASTEWATER PROJECT - LIFT STATION 15 among its neighbors
21 discharge permits are in the Achenback Canyon subwatershed (HUC 130301020703); NMR1005PM is one.
Other permits in the Achenback Canyon subwatershed (HUC 130301020703)
- BOWER GARAGE, Las Cruces: NMR1005CM, minor, term to 2027-02-16
- CONSTRUCTION OF GIRASOL SOUTH ROAD, MESQUITE, NM, Mesquite: NMR1005KA, minor, term to 2027-02-16
- JIMERSON PROJECT, Las Cruces: NMR10079J, minor, term to 2027-02-16
- LIFT STATION 16 WASTEWATER SYSTEM IMPROVEMENTS - ALONG EAST ORGAN RD, Mesilla Park: NMR1004N2, minor, term to 2027-02-16
- LIFT STATION 16 WASTEWATER SYSTEM IMPROVEMENTS - PROJECT 2 SMITHCO, Mesilla Park: NMR1004N8, minor, term to 2027-02-16
- MESQUITE-BRAZITO WASTEWATER SYSTEM: LIFT 12 IMPROVEMENTS, Mesilla Park: NMR1004RE, minor, term to 2027-02-16
- MESQUITE-BRAZITO WASTEWATER SYSTEM: LIFT 12 IMPROVEMENTS, Mesilla Park: NMR1004RF, minor, term to 2027-02-16
- SFH 13626 GIRASOL ROAD, Las Cruces: NMR10072M, minor, term to 2027-02-16
- SINGLE FAMILY HOME - 1 FOX CANYON RD, Las Cruces: NMR1005O8, minor, term to 2027-02-16
- SINGLE FAMILY HOME - 5490 THOMAS MORAN RD, Las Cruces: NMR1005C9, minor, term to 2027-02-16
What stands out
- Its term runs 3 years and 227 days, July 4, 2023 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | LRGPWW MESQUITE-BRAZITO WASTEWATER PROJECT - LIFT STATION 15 |
|---|---|
| Permittee | Lower Rio Grande Public Water Works Authority |
| NPDES ID | NMR1005PM |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 4, 2023 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Mesilla Park, NM 88047 |
| Subwatershed | Achenback Canyon (HUC 130301020703) |
NPDES NMR1005PM: effluent limits and exceedances
LRGPWW MESQUITE-BRAZITO WASTEWATER PROJECT - LIFT STATION 15 (NPDES NMR1005PM): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NMR1005PM: no pollutant row on file.
NPDES NMR1005PM: inspections, violations and enforcement
NPDES NMR1005PM (LRGPWW MESQUITE-BRAZITO WASTEWATER PROJECT - LIFT STATION 15): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NMR1005PM
NPDES NMR1005PM: one email when its EPA record changes — $99/month.
Permits near NPDES NMR1005PM
NPDES NMR1005PM: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.