NPDES NMR1004RE · Clean Water Act
MESQUITE-BRAZITO WASTEWATER SYSTEM: LIFT 12 IMPROVEMENTS, Mesilla Park, NM: NPDES NMR1004RE discharge permit, effluent exceedances, inspections, penalties
MESQUITE-BRAZITO WASTEWATER SYSTEM: LIFT 12 IMPROVEMENTS, Mesilla Park, New Mexico: General permit coverage NMR1004RE, held by Smithco Construction, Inc.; Construction stormwater; Effective; issued May 25, 2022, term to February 16, 2027, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 735 were issued before NMR1004RE. Smithco Construction, Inc. holds 15 permits in New Mexico.
Other permits held by Smithco Construction, Inc.
- SOUTHEAST COLLECTION PROJECT PHASE II DA MDWCA, Las Cruces: NMR1001MG
- ANAPRA STORMWATER PUMP STATION IMPROVEMENTS PHASE 1, Sunland Park: NMR1001QW
- CUCHILLO NEGRO ARROYO BANK STABILIZATION, Truth Or Consequences: NMR1002SG
- CHAMBERINO MDWC & SA WATER SYSTEM IMPROVEMENTS, Chamberino: NMR10034T, issued 2020-07-27
- LIFT STATION 16 WASTEWATER SYSTEM IMPROVEMENTS - PROJECT 2 SMITHCO, Mesilla Park: NMR1004N8, issued 2022-04-14
- BONITO LAKE INFRASTRUCTURE IMPROVEMENTS, Nogal: NMR1004US, issued 2022-06-21
- MESQUITE-BRAZITO WASTEWATER SYSTEM: LIFT 11 IMPROVEMENTS CONTRACTOR, Mesquite: NMR1004WT, issued 2022-07-14
- CASA ADOBES MDWCA USDA/RD 2020 WATER SYSTEM IMPROVEMENTS, Mimbres: NMR1005WQ, issued 2023-10-05
- CHAPARRAL WASTEWATER COLLECTION IMPROVEMENTS PHASE 2C, Chaparral: NMR1006Y2, issued 2025-01-23
- WILLIAMSBURG WATEWATER SYSTEM IMPROVEMENTS, Williamsburg: NMR10071I
Coverages issued nearest NMR1004RE
- 2022-05-23: CARRIAGE ESTATES, Rio Rancho: NMR1004R2, held by Architectural Contractors - SCM Partners
- 2022-05-24: CARRIAGE ESTATES, Rio Rancho: NMR1004R3, held by Architectural Contractors, Inc.
- 2022-05-24: DUTCH BROTHERS NM 528, Albuquerque: NMR1004R9, held by Western Hills Real Estate/Development
- 2022-05-24: VENTANA SQUARE TRACT H-10, Albuquerque: NMR1004RA, held by JCJ,LLC
- 2022-05-24: VILLAS DE RIVERA SUB, AKA SANTA TERESA UNIT 2A 840 SUBDIVISION, R1704956, Santa Teresa: NMR1004RC, held by Skyline Engineering Inc.
- 2022-05-25: MESQUITE-BRAZITO WASTEWATER SYSTEM: LIFT 12 IMPROVEMENTS, Mesilla Park: NMR1004RF, held by Lower Rio Grande Public Water Works Authority
- 2022-05-26: EXPLORE ACADEMY GYM ADDITION, Albuquerque: NMR1004RH, held by Explore Academy Foundation
- 2022-05-27: DAC SLEEPY FARMS WW COLLECTION, Vado: NMR1004RM, held by J29 Enterprises, LLC
- 2022-05-27: SANTA TERESA INDUSTRIAL RAIL FACILITY EXP. TRACK 170, 171, 172 301, Santa Teresa: NMR1004RN, held by Ironhorse Development
- 2022-05-31: NA-19-U93 GALLUP FAILED SEPTIC NORTH, Tohatchi: AZR10I0U8, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
MESQUITE-BRAZITO WASTEWATER SYSTEM: LIFT 12 IMPROVEMENTS among its neighbors
21 discharge permits are in the Achenback Canyon subwatershed (HUC 130301020703); NMR1004RE is one.
Other permits in the Achenback Canyon subwatershed (HUC 130301020703)
- BOWER GARAGE, Las Cruces: NMR1005CM, minor, term to 2027-02-16
- CONSTRUCTION OF GIRASOL SOUTH ROAD, MESQUITE, NM, Mesquite: NMR1005KA, minor, term to 2027-02-16
- JIMERSON PROJECT, Las Cruces: NMR10079J, minor, term to 2027-02-16
- LIFT STATION 16 WASTEWATER SYSTEM IMPROVEMENTS - ALONG EAST ORGAN RD, Mesilla Park: NMR1004N2, minor, term to 2027-02-16
- LIFT STATION 16 WASTEWATER SYSTEM IMPROVEMENTS - PROJECT 2 SMITHCO, Mesilla Park: NMR1004N8, minor, term to 2027-02-16
- LRGPWW MESQUITE-BRAZITO WASTEWATER PROJECT - LIFT STATION 15, Mesilla Park: NMR1005PM, minor, term to 2027-02-16
- MESQUITE-BRAZITO WASTEWATER SYSTEM: LIFT 12 IMPROVEMENTS, Mesilla Park: NMR1004RF, minor, term to 2027-02-16
- SFH 13626 GIRASOL ROAD, Las Cruces: NMR10072M, minor, term to 2027-02-16
- SINGLE FAMILY HOME - 1 FOX CANYON RD, Las Cruces: NMR1005O8, minor, term to 2027-02-16
- SINGLE FAMILY HOME - 5490 THOMAS MORAN RD, Las Cruces: NMR1005C9, minor, term to 2027-02-16
What stands out
- Its term runs 4 years and 267 days, May 25, 2022 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | MESQUITE-BRAZITO WASTEWATER SYSTEM: LIFT 12 IMPROVEMENTS |
|---|---|
| Permittee | Smithco Construction, Inc. |
| NPDES ID | NMR1004RE |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 25, 2022 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Mesilla Park, NM 88047 |
| Subwatershed | Achenback Canyon (HUC 130301020703) |
NPDES NMR1004RE: effluent limits and exceedances
MESQUITE-BRAZITO WASTEWATER SYSTEM: LIFT 12 IMPROVEMENTS (NPDES NMR1004RE): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NMR1004RE: no pollutant row on file.
NPDES NMR1004RE: inspections, violations and enforcement
NPDES NMR1004RE (MESQUITE-BRAZITO WASTEWATER SYSTEM: LIFT 12 IMPROVEMENTS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NMR1004RE
NPDES NMR1004RE: one email when its EPA record changes — $99/month.
Permits near NPDES NMR1004RE
NPDES NMR1004RE: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.