Velarion Records
Free: one email when NPDES PAC020092 changes. Unsubscribe any time.

NPDES PAC020092 · Clean Water Act

PILSIE PILLAR DEVELOPMENT, Leetsdale, Borough Of, PA: NPDES PAC020092 discharge permit, effluent exceedances, inspections, penalties

PILSIE PILLAR DEVELOPMENT, Leetsdale, Borough Of, Pennsylvania: General permit coverage PAC020092, held by Centerside Industrial, LP; Construction stormwater; Effective; issued July 25, 2017, term to July 24, 2022, by Allegheny County Conservation District; Industrial Building Construction.

  • December 10, 2019: WW Storm Water Construction - Failure to Implement SWPPP/SWMP (CT6).
  • December 10, 2019: WW Storm Water Construction - Narrative effluent violation (CT6).
  • October 29, 2019: WW Storm Water Construction - Failure to properly install/implement BMPs (CT6).
  • October 29, 2019: WW Storm Water Construction - Failure to properly operate and maintain BMPs (CT6).
  • October 29, 2019: WW Storm Water Construction - Failure to Conduct Inspections (CT6).
  • October 29, 2019: WW Storm Water Construction - Narrative effluent violation (CT6).

Pennsylvania holds 4,048 Construction stormwater coverages of this permit type in EPA’s file; 96 were issued before PAC020092.

Coverages issued nearest PAC020092

PILSIE PILLAR DEVELOPMENT among its neighbors

27 discharge permits are in the McCabe Run-Ohio River subwatershed (HUC 050301010307); PAC020092 is one. Its county: 695, 8 major; PAC020092 is minor permit.

Other permits in the McCabe Run-Ohio River subwatershed (HUC 050301010307)

What stands out

  • Its term runs 4 years and 364 days, July 25, 2017 to July 24, 2022; the term ended 1,543 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
  • Its newest dated event on file is a single-event violation on December 10, 2019, 2,500 days before EPA's file was loaded.
  • No dated event in the 365 days to October 14, 2026.
  • EPA's file dates 6 events for it, all in 2019.
  • It is one of 14,586 discharge permits on the register in Pennsylvania; 4,395 of them (30%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityPILSIE PILLAR DEVELOPMENT
PermitteeCenterside Industrial, LP
NPDES IDPAC020092
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedJuly 25, 2017
ExpiresJuly 24, 2022
AgencyAllegheny County Conservation District
AddressLeetsdale, Borough Of, PA 15056
Receiving water impaired303(D) Listed
SubwatershedMcCabe Run-Ohio River (HUC 050301010307)
NAICS236210 – Industrial Building Construction

NPDES PAC020092: effluent limits and exceedances

PILSIE PILLAR DEVELOPMENT (NPDES PAC020092): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES PAC020092: no pollutant row on file.

NPDES PAC020092: inspections, violations and enforcement

NPDES PAC020092: 6 single-event violations

DateWhat EPA recordedAgency
December 10, 2019WW Storm Water Construction - Failure to Implement SWPPP/SWMPCT6
December 10, 2019WW Storm Water Construction - Narrative effluent violationCT6
October 29, 2019WW Storm Water Construction - Failure to properly install/implement BMPsCT6
October 29, 2019WW Storm Water Construction - Failure to properly operate and maintain BMPsCT6
October 29, 2019WW Storm Water Construction - Failure to Conduct InspectionsCT6
October 29, 2019WW Storm Water Construction - Narrative effluent violationCT6

NPDES PAC020092 (PILSIE PILLAR DEVELOPMENT): no inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES PAC020092

NPDES PAC020092: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES PAC020092

NPDES PAC020092: 0 pollutant rows, 6 dated events; ICIS-NPDES download, loaded October 14, 2026.