NPDES PAC020109 · Clean Water Act
LURAL GROVE, Pine, Township Of, PA: NPDES PAC020109 discharge permit, effluent exceedances, inspections, penalties
LURAL GROVE, Pine, Township Of, Pennsylvania: General permit coverage PAC020109, held by Cavalier Land Partners, L.P.; Construction stormwater; Effective; issued August 1, 2017, term to July 31, 2022, by Allegheny County Conservation District.
- November 19, 2019: WW Storm Water Construction - Failure to Implement SWPPP/SWMP (CT6).
- November 19, 2019: WW Storm Water Construction - Failure to properly install/implement BMPs (CT6).
- November 19, 2019: WW Storm Water Construction - Narrative effluent violation (CT6).
- May 1, 2018: WW Storm Water Construction - Failure to properly operate and maintain BMPs (CT6).
- May 1, 2018: WW Storm Water Construction - Narrative effluent violation (CT6).
- March 13, 2018: WW Storm Water Construction - Failure to properly operate and maintain BMPs (CT6).
- March 13, 2018: WW Storm Water Construction - Narrative effluent violation (CT6).
- January 11, 2018: WW Storm Water Construction - Failure to Implement SWPPP/SWMP (CT6).
- January 11, 2018: WW Storm Water Construction - Failure to properly operate and maintain BMPs (CT6).
- January 11, 2018: WW Storm Water Construction - Failure to properly install/implement BMPs (CT6).
- January 11, 2018: WW Storm Water Construction - Narrative effluent violation (CT6).
- December 1, 2017: WW Storm Water Construction - Failure to Implement SWPPP/SWMP (CT6).
- December 1, 2017: WW Storm Water Construction - Failure to properly operate and maintain BMPs (CT6).
- December 1, 2017: WW Storm Water Construction - Failure to properly install/implement BMPs (CT6).
- December 1, 2017: WW Storm Water Construction - Narrative effluent violation (CT6).
Pennsylvania holds 4,048 Construction stormwater coverages of this permit type in EPA’s file; 98 were issued before PAC020109.
Coverages issued nearest PAC020109
- 2017-07-17: MORAINE STATE PARK WASTE SITE, Portersville: PAC100055, held by Gulisek Construction LLC
- 2017-07-18: VILLAGE OF 4 SEASONS, Marple, Township Of: PAC230027, held by Fortjoy Development 2, LP
- 2017-07-24: NTB TIRE AND SERVICE CENTER, Cranberry, Township Of: PAC100052, held by NTW LLC - DBA National Tire & Battery
- 2017-07-25: PILSIE PILLAR DEVELOPMENT, Leetsdale, Borough Of: PAC020092, held by Centerside Industrial, LP
- 2017-07-26: LAMAR S SENSENIG POULTRY OPERATION, Union, Township Of: PAC380026, held by Lamar S. Sensenig
- 2017-08-01: COLUMBIA GAS D-7128 PIPELINE REPLACEMENT, Brownsville: PAC260011, held by Columbia Gas of Pennsylvania
- 2017-08-01: MAXIM DEVELOPMENT/ROSEMON ESTATES, Uniontown: PAC260012, held by Maxim Development - Emilio Ciarrocchi
- 2017-08-04: BEULAH'S VISTA PLAN OF LOTS, Mars: PAC100058, held by The Office of Horace Trumbauer, LLC
- 2017-08-08: FREEPORT ROAD DOLLAR GENERAL SOTRE, Butler: PAC000051, held by PTV XXX, LLC
- 2017-08-08: PROPOSED WALKING TRAIL, Slippery Rock: PAC100041, held by Slippery Rock Area Parks & Recreation
LURAL GROVE among its neighbors
60 discharge permits are in the Breakneck Creek subwatershed (HUC 050301050406); PAC020109 is one. Its county: 695, 8 major; PAC020109 is minor permit.
Other permits in the Breakneck Creek subwatershed (HUC 050301050406)
- 10-2 SR 3021 CORRIDOR IMPROVEMENTS, Cranberry, Township Of: PAC100306, minor, term to 2024-12-07
- 102 GRACE DR SRSTP, Cranberry Township: PAG041495, minor, term to 2028-11-11
- 135 WATTERS STATION RD SRSTP, Evans City: PAG041352, minor, term to 2028-11-11
- 245 LINDSAY RD SRSTP, Zelienople: PAG041390, minor, term to 2028-11-11
- 309 LINDSAY RD SRSTP, Zelienople: PAG041413, minor, term to 2028-11-11
- ADAMS TOWN CENTER, Adams, Township Of: PAC100334, minor, term to 2024-12-07
- ADAMS TWP BUTLER CNTY (ADAMS TOWNSHIP MS4), Mars: PAG138301, minor, term to 2018-08-19
- AMHERST VILLAGE RESIDENTIAL DEVELOPMENT, Mars: PAC100220, minor, term to 2024-12-07
- ANDREA WEIDER, Evans City: PAG048878, minor, term to 2008-03-12
- ANDRITZ METALS USA CALLERY FAC, Callery: PAG038482, minor, term to 2028-03-23
What stands out
- Its term runs 4 years and 364 days, August 1, 2017 to July 31, 2022; the term ended 1,507 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- Its newest dated event on file is a single-event violation on November 19, 2019, 2,492 days before EPA's file was loaded.
- No dated event in the 365 days to September 15, 2026.
- EPA's file dates 15 events for it, from 2017 to 2019; the busiest year is 2018 with 8.
- It is one of 14,586 discharge permits on the register in Pennsylvania; 4,395 of them (30%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | LURAL GROVE |
|---|---|
| Permittee | Cavalier Land Partners, L.P. |
| NPDES ID | PAC020109 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2017 |
| Expires | July 31, 2022 |
| Agency | Allegheny County Conservation District |
| Address | Pine, Township Of, PA 15090 |
| Subwatershed | Breakneck Creek (HUC 050301050406) |
NPDES PAC020109: effluent limits and exceedances
LURAL GROVE (NPDES PAC020109): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES PAC020109: no pollutant row on file.
NPDES PAC020109: inspections, violations and enforcement
NPDES PAC020109: 15 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| November 19, 2019 | WW Storm Water Construction - Failure to Implement SWPPP/SWMP | CT6 |
| November 19, 2019 | WW Storm Water Construction - Failure to properly install/implement BMPs | CT6 |
| November 19, 2019 | WW Storm Water Construction - Narrative effluent violation | CT6 |
| May 1, 2018 | WW Storm Water Construction - Failure to properly operate and maintain BMPs | CT6 |
| May 1, 2018 | WW Storm Water Construction - Narrative effluent violation | CT6 |
| March 13, 2018 | WW Storm Water Construction - Failure to properly operate and maintain BMPs | CT6 |
| March 13, 2018 | WW Storm Water Construction - Narrative effluent violation | CT6 |
| January 11, 2018 | WW Storm Water Construction - Failure to Implement SWPPP/SWMP | CT6 |
| January 11, 2018 | WW Storm Water Construction - Failure to properly operate and maintain BMPs | CT6 |
| January 11, 2018 | WW Storm Water Construction - Failure to properly install/implement BMPs | CT6 |
| January 11, 2018 | WW Storm Water Construction - Narrative effluent violation | CT6 |
| December 1, 2017 | WW Storm Water Construction - Failure to Implement SWPPP/SWMP | CT6 |
| December 1, 2017 | WW Storm Water Construction - Failure to properly operate and maintain BMPs | CT6 |
| December 1, 2017 | WW Storm Water Construction - Failure to properly install/implement BMPs | CT6 |
| December 1, 2017 | WW Storm Water Construction - Narrative effluent violation | CT6 |
NPDES PAC020109 (LURAL GROVE): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES PAC020109
NPDES PAC020109: one email when its EPA record changes — $99/month.
Permits near NPDES PAC020109
NPDES PAC020109: 0 pollutant rows, 15 dated events; ICIS-NPDES download, loaded September 15, 2026.