NPDES SCR10ZF1R · Clean Water Act
THE RETREAT AT LAKE MURRAY PHASE 1, Lexington, SC: NPDES SCR10ZF1R discharge permit, effluent exceedances, inspections, penalties
THE RETREAT AT LAKE MURRAY PHASE 1, Lexington, South Carolina: General permit coverage SCR10ZF1R, held by T. Kevin Connelly; Construction stormwater; Effective; issued April 16, 2024, term to April 15, 2029, by State.
South Carolina holds 11,300 Construction stormwater coverages of this permit type in EPA’s file; 5,755 were issued before SCR10ZF1R. T. Kevin Connelly holds 4 permits in South Carolina.
Other permits held by T. Kevin Connelly
- LAKEVIEW PLACE, Seneca: SCR10ZE7R, issued 2023-12-07
- THE RETREAT AT LAKE MURRAY PHASE 3, Lexington: SCR10ZG74, issued 2024-10-08
- THE RETREAT AT LAKE MURRAY PHASE 2, Lexington: SCR10ZG7N, issued 2024-10-09
Coverages issued nearest SCR10ZF1R
- 2024-04-15: IMPROVEMENTS TO CAYCE CROSSING, West Columbia: SCR10ZF1G, held by Satish H. Patel
- 2024-04-15: 2.5-AC MULTIFAMILY COMPLEX AT HUGER AND WILLIAMS STREETS, Columbia: SCR10ZF1H, held by Jerome Kline
- 2024-04-15: THE COTTAGES AT DEERFIELD, Surfside Beach: SCR10ZF1J, held by Whit Bundy
- 2024-04-15: JUDSON NORTH PARKING, Greenville: SCR10ZF1L, held by Kenneth Reiter
- 2024-04-16: BRAXTON RIDGE PHASE 3, Fountain Inn: SCR10ZF1Q, held by Ryan Beck
- 2024-04-16: VERVE COLUMBIA, Columbia: SCR10ZF1S, held by Bethany Rooney
- 2024-04-16: HEARTLAND ACRES LOT 14, Rock Hill: SCR10ZF1T, held by John Blake
- 2024-04-16: SHEPHERDS TRACE LOT # 30, 535 BAREFOOT LANE, Clover: SCR10ZF1U, held by David Frailey
- 2024-04-16: NINETY SIX HIGH SCHOOL PARKING LOT EXPANSION, Ninety Six: SCR10ZF1V, held by Andrew Macke
- 2024-04-16: ESTATES OF CHARLES AYERS- BRANHAM ROAD- TRACT 3, Rock Hill: SCR10ZF1W, held by Sam Patterson
THE RETREAT AT LAKE MURRAY PHASE 1 among its neighbors
8 discharge permits are in the Beaverdam Creek-Saluda River subwatershed (HUC 030501091309); SCR10ZF1R is one. Its county: 747, 4 major; SCR10ZF1R is minor permit.
Other permits in the Beaverdam Creek-Saluda River subwatershed (HUC 030501091309)
- 1047 COUNTS FERRY RD, Lexington: SCR10ZLB3, minor, term to 2031-07-02
- PINTAIL POINT PHASE 1 LOT 13, Gilbert: SCR10ZGGP, minor, term to 2029-11-19
- PINTAIL POINT PHASE 2A LOT 61, Gilbert: SCR10ZF5G, minor, term to 2029-05-01
- THE RETREAT AT LAKE MURRAY PHASE 2, Lexington: SCR10ZG7N, minor, term to 2029-10-08
- THE RETREAT AT LAKE MURRAY PHASE 3, Lexington: SCR10ZG74, minor, term to 2029-10-07
- WATSON FARMS, Lexington: SCR10ZK0A, minor, term to 2030-12-22
- WINTER FARMS, Lexington: SCR10ZHKT, minor, term to 2030-05-07
What stands out
- Its term runs 4 years and 364 days, April 16, 2024 to April 15, 2029.
- No dated event in the 365 days to September 15, 2026.
- It is one of 13,763 discharge permits on the register in South Carolina; 11,300 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | THE RETREAT AT LAKE MURRAY PHASE 1 |
|---|---|
| Permittee | T. Kevin Connelly |
| NPDES ID | SCR10ZF1R |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 16, 2024 |
| Expires | April 15, 2029 |
| Agency | State |
| Address | Lexington, SC 29072 |
| Subwatershed | Beaverdam Creek-Saluda River (HUC 030501091309) |
NPDES SCR10ZF1R: effluent limits and exceedances
THE RETREAT AT LAKE MURRAY PHASE 1 (NPDES SCR10ZF1R): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SCR10ZF1R: no pollutant row on file.
NPDES SCR10ZF1R: inspections, violations and enforcement
NPDES SCR10ZF1R (THE RETREAT AT LAKE MURRAY PHASE 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SCR10ZF1R
NPDES SCR10ZF1R: one email when its EPA record changes — $99/month.
Permits near NPDES SCR10ZF1R
NPDES SCR10ZF1R: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.