NPDES SCR10ZG7N · Clean Water Act
THE RETREAT AT LAKE MURRAY PHASE 2, Lexington, SC: NPDES SCR10ZG7N discharge permit, effluent exceedances, inspections, penalties
THE RETREAT AT LAKE MURRAY PHASE 2, Lexington, South Carolina: General permit coverage SCR10ZG7N, held by T. Kevin Connelly; Construction stormwater; Effective; issued October 9, 2024, term to October 8, 2029, by State.
South Carolina holds 11,300 Construction stormwater coverages of this permit type in EPA’s file; 6,922 were issued before SCR10ZG7N. T. Kevin Connelly holds 4 permits in South Carolina.
Other permits held by T. Kevin Connelly
- LAKEVIEW PLACE, Seneca: SCR10ZE7R, issued 2023-12-07
- THE RETREAT AT LAKE MURRAY PHASE 1, Lexington: SCR10ZF1R, issued 2024-04-16
- THE RETREAT AT LAKE MURRAY PHASE 3, Lexington: SCR10ZG74, issued 2024-10-08
Coverages issued nearest SCR10ZG7N
- 2024-10-08: SHINE LANE TOWNHOMES, Moncks Corner: SCR10ZG7G, held by Chris Young
- 2024-10-08: FAIRMONT PINES NORTH PHASE 8, Moncks Corner: SCR10ZG7J, held by Jason Byham, Lennar Carolinas
- 2024-10-09: HARDEE FAMILY HOLDINGS, Conway: SCR10ZG7K, held by Trent Hardee, Hardee Family Holdings
- 2024-10-09: NORTH CHARLESTON SIDEWALKS PACKAGE 3A FERNWOOD DRIVE, Na: SCR10ZG7L, held by Mike Dalrymple
- 2024-10-09: PROJECT VOLLEY, Not In Limits: SCR10ZG7M, held by Arthur Samet
- 2024-10-09: ESTATES DRIVE DEVELOPMENT, Pickens: SCR10ZG7P, held by Michael Cone
- 2024-10-09: OLD MILL TRAIL DAM PARKING LOT, Lexington: SCR10ZG7Q, held by Randy Edwards
- 2024-10-09: PELZER AND WEST PELZER SEWER CONSOLIDATION IMPROVEMENT, Pelzer: SCR10ZG7R, held by Zach Dukes
- 2024-10-09: PORT CITY CENTRE PHASE 2 EARLY SITE PACKAGE, Summerville: SCR10ZG7T, held by Dave Williams
- 2024-10-09: AVONDALE WEST PHASE 2, Ridgeville: SCR10ZG7U, held by Steven Wilson
THE RETREAT AT LAKE MURRAY PHASE 2 among its neighbors
8 discharge permits are in the Beaverdam Creek-Saluda River subwatershed (HUC 030501091309); SCR10ZG7N is one. Its county: 747, 4 major; SCR10ZG7N is minor permit.
Other permits in the Beaverdam Creek-Saluda River subwatershed (HUC 030501091309)
- 1047 COUNTS FERRY RD, Lexington: SCR10ZLB3, minor, term to 2031-07-02
- PINTAIL POINT PHASE 1 LOT 13, Gilbert: SCR10ZGGP, minor, term to 2029-11-19
- PINTAIL POINT PHASE 2A LOT 61, Gilbert: SCR10ZF5G, minor, term to 2029-05-01
- THE RETREAT AT LAKE MURRAY PHASE 1, Lexington: SCR10ZF1R, minor, term to 2029-04-15
- THE RETREAT AT LAKE MURRAY PHASE 3, Lexington: SCR10ZG74, minor, term to 2029-10-07
- WATSON FARMS, Lexington: SCR10ZK0A, minor, term to 2030-12-22
- WINTER FARMS, Lexington: SCR10ZHKT, minor, term to 2030-05-07
What stands out
- Its term runs 4 years and 364 days, October 9, 2024 to October 8, 2029.
- No dated event in the 365 days to September 15, 2026.
- It is one of 13,763 discharge permits on the register in South Carolina; 11,300 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | THE RETREAT AT LAKE MURRAY PHASE 2 |
|---|---|
| Permittee | T. Kevin Connelly |
| NPDES ID | SCR10ZG7N |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 9, 2024 |
| Expires | October 8, 2029 |
| Agency | State |
| Address | Lexington, SC 29072 |
| Subwatershed | Beaverdam Creek-Saluda River (HUC 030501091309) |
NPDES SCR10ZG7N: effluent limits and exceedances
THE RETREAT AT LAKE MURRAY PHASE 2 (NPDES SCR10ZG7N): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SCR10ZG7N: no pollutant row on file.
NPDES SCR10ZG7N: inspections, violations and enforcement
NPDES SCR10ZG7N (THE RETREAT AT LAKE MURRAY PHASE 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SCR10ZG7N
NPDES SCR10ZG7N: one email when its EPA record changes — $99/month.
Permits near NPDES SCR10ZG7N
NPDES SCR10ZG7N: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.