NPDES SDR10J680 · Clean Water Act
CONTRACTOR SHOPS, Sioux Falls, SD: NPDES SDR10J680 discharge permit, effluent exceedances, inspections, penalties
CONTRACTOR SHOPS, Sioux Falls, South Dakota: General permit coverage SDR10J680, held by JTV Properties LLC; Construction stormwater; Administratively continued; issued November 4, 2019, term to March 31, 2023, by State.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 106 were issued before SDR10J680.
Coverages issued nearest SDR10J680
- 2019-09-17: LANDMARK INDUSTRIAL PARK ADDITION, Tea: SDR10J635, held by Nielson Development LLC
- 2019-09-17: SERENITY ADDITION, Tea: SDR10J636, held by Nielson Development LLC
- 2019-10-23: DRIFTWOOD DAIRY, Baltic: SDR10J668, held by Driftwood Dairy
- 2019-10-24: HARVEST CREEK ADDITION, Sioux Falls: SDR10J670, held by 5711 LLC
- 2019-10-29: DUNN PROPERTY, Watertown: SDR10J679, held by Dunn Property
- 2019-11-05: RIVER VALLEY CONDOMINIUMS, North Sioux City: SDR10J691, held by River Valley LLP
- 2019-11-26: APPLE SPRINGS, Sturgis: SDR10J701, held by 4 Bears in the Hills LLC
- 2020-01-15: THE LAKES OF WILLOW CREEK FIRST ADDITION, Watertown: SDR10J730, held by J & J Land Sales LLC
- 2020-03-04: PUMP STATION 19 MURDO: SDR10J771, held by Pump Station 19 Murdo
- 2020-03-09: DAKOTA LINE DAIRY, Humboldt: SDR10J780, held by Dakota Line Dairy
CONTRACTOR SHOPS among its neighbors
44 discharge permits are in the Outlet Skunk Creek subwatershed (HUC 101702031105); SDR10J680 is one.
Other permits in the Outlet Skunk Creek subwatershed (HUC 101702031105)
- 2025 MISCELLANEOUS DRAINAGE IMPROVEMENTS, Sioux Falls: SDR10P5MM, minor, term to 2028-10-31
- 41 ELLIS ADDITION, Sioux Falls: SDR10K407, minor, term to 2023-03-31
- 4200 N MARION ROAD APARTMENTS, Sioux Falls: SDR10K535, minor, term to 2023-03-31
- BASIN 15 EQ BASIN AND LIFT STATION, PHASE 2C EXTENSTION, Sioux Falls: SDR10P5EP, minor, term to 2028-10-31
- BASIN 15 SANITARY SEWER, PHASE 2A & PHASE 2B EXTENSION, Sioux Falls: SDR10P5B1, minor, term to 2028-10-31
- BETTERWAY INVESTMENTS - SIOUX FALLS DEVELOPMENT, Sioux Falls: SDR10P5T6, minor, term to 2028-10-31
- BIG LOST MEADERY/RANCH & ROOST, Sioux Falls: SDR10P550, minor, term to 2028-10-31
- BOYCE PARK ADDITION PHASES 4 & 5, Sioux Falls: SDR10P5BB, minor, term to 2028-10-31
- CAMPUS WIDE, SEWER & STORM SEWER INFRASTRUCTURE CAT 5.2, Sioux Falls: SDR10P5M1, minor, term to 2028-10-31
- CARDINAL COVE ADDITION, Sioux Falls: SDR10I515, minor, term to 2023-03-31
What stands out
- Its term runs 3 years and 147 days, November 4, 2019 to March 31, 2023; the term ended 1,264 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CONTRACTOR SHOPS |
|---|---|
| Permittee | JTV Properties LLC |
| NPDES ID | SDR10J680 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 4, 2019 |
| Expires | March 31, 2023 |
| Agency | State |
| Address | Sioux Falls, SD 57106 |
| Subwatershed | Outlet Skunk Creek (HUC 101702031105) |
NPDES SDR10J680: effluent limits and exceedances
CONTRACTOR SHOPS (NPDES SDR10J680): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10J680: no pollutant row on file.
NPDES SDR10J680: inspections, violations and enforcement
NPDES SDR10J680 (CONTRACTOR SHOPS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10J680
NPDES SDR10J680: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10J680
NPDES SDR10J680: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.