NPDES SDR10K391 · Clean Water Act
PIERRE OUTDOOR POOL, Pierre, SD: NPDES SDR10K391 discharge permit, effluent exceedances, inspections, penalties
PIERRE OUTDOOR POOL, Pierre, South Dakota: General permit coverage SDR10K391, held by Pierre Outdoor Pool; Construction stormwater; Administratively continued; issued August 18, 2021, term to March 31, 2023, by State; discharges to Pierre storm sewer.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 234 were issued before SDR10K391.
Coverages issued nearest SDR10K391
- 2021-08-05: FIRST RATE SHOP BUILDING, Sioux Falls: SDR10K380, held by First Rate Shop Building
- 2021-08-05: GRANITE VALLEY ADDITION PHASE 4, Sioux Falls: SDR10K381, held by Granite Valley Addition Phase 4
- 2021-08-06: HERITAGE POND SUBDIVISION, Crooks: SDR10K385, held by Heritage Pond Subdivision
- 2021-08-11: CREEK DRIVE STORAGE UNITS, Rapid City: SDR10K416, held by Creek Drive Storage Units
- 2021-08-12: ER 6385(07), MELLETTE COUNTY, PCN 07N2, White River: SDR10I01R, held by SD Department of Transportation
- 2021-08-20: AR RANCH PHASE 2, Piedmont: SDR10K393, held by AR Ranch Phase 2
- 2021-08-20: PLEASANT VALLEY ESTATES, Sturgis: SDR10K394, held by Pleasant Valley Estates
- 2021-08-20: BURNSFIELD ADDITION, Sioux Falls: SDR10K395, held by Burnsfield Addition
- 2021-08-24: THE RIDGE DEVELOPMENT, Deadwood: SDR10K396, held by the RIDGE Development
- 2021-08-24: RIVER VALLEY ADDITION PHASE I, North Sioux City: SDR10K398, held by River Valley Addition Phase I
PIERRE OUTDOOR POOL among its neighbors
17 discharge permits are in the Bad River-Missouri River subwatershed (HUC 101401010302); SDR10K391 is one.
Other permits in the Bad River-Missouri River subwatershed (HUC 101401010302)
- BECKER-HANSEN PARKING LOT RECONSTRUCTION, Pierre: SDR10P5YY, minor, term to 2028-10-31
- CIRCLE OF CARE VETERINARY CENTER, Pierre: SDR10P5T0, minor, term to 2028-10-31
- MID-DAKOTA BACKWASH RECOVERY, Pierre: SDR10P587, minor, term to 2028-10-31
- MID-DAKOTA RURAL WATER SYSTEMS INC, Pierre: SDGA20012, minor, term to 2025-09-30
- NEW DOH PUBLIC HEALTH LABORATORY, Pierre: SDR10P56U, minor, term to 2028-10-31
- PCN 026Z, Pierre: SDR10P5FH, minor, term to 2028-10-31
- PIERRE VALVOLINE, Pierre: SDR10P5XC, minor, term to 2028-10-31
- PIERRE, CITY OF, Pierre: SD0020176, major, term to 2020-09-30
- PIERRE, CITY OF (BIOSOLIDS), Pierre, City Of: SDL020176, minor, term to 2018-03-31
- PIERRE, CITY OF (BIOSOLIDS), Pierre: SDLG20176, minor, term to 2028-08-31
What stands out
- Its term runs 1 year and 225 days, August 18, 2021 to March 31, 2023; the term ended 1,264 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PIERRE OUTDOOR POOL |
|---|---|
| Permittee | Pierre Outdoor Pool |
| NPDES ID | SDR10K391 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 18, 2021 |
| Expires | March 31, 2023 |
| Agency | State |
| Address | Pierre, SD 57501 |
| Receiving water | Pierre storm sewer |
| Subwatershed | Bad River-Missouri River (HUC 101401010302) |
NPDES SDR10K391: effluent limits and exceedances
PIERRE OUTDOOR POOL (NPDES SDR10K391): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10K391: no pollutant row on file.
NPDES SDR10K391: inspections, violations and enforcement
NPDES SDR10K391 (PIERRE OUTDOOR POOL): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10K391
NPDES SDR10K391: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10K391
NPDES SDR10K391: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.