NPDES SDR10K395 · Clean Water Act
BURNSFIELD ADDITION, Sioux Falls, SD: NPDES SDR10K395 discharge permit, effluent exceedances, inspections, penalties
BURNSFIELD ADDITION, Sioux Falls, South Dakota: General permit coverage SDR10K395, held by Burnsfield Addition; Construction stormwater; Administratively continued; issued August 20, 2021, term to March 31, 2023, by State; discharges to unnamed creek; Highway, Street, and Bridge Construction.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 235 were issued before SDR10K395.
Coverages issued nearest SDR10K395
- 2021-08-11: CREEK DRIVE STORAGE UNITS, Rapid City: SDR10K416, held by Creek Drive Storage Units
- 2021-08-12: ER 6385(07), MELLETTE COUNTY, PCN 07N2, White River: SDR10I01R, held by SD Department of Transportation
- 2021-08-18: PIERRE OUTDOOR POOL, Pierre: SDR10K391, held by Pierre Outdoor Pool
- 2021-08-20: AR RANCH PHASE 2, Piedmont: SDR10K393, held by AR Ranch Phase 2
- 2021-08-20: PLEASANT VALLEY ESTATES, Sturgis: SDR10K394, held by Pleasant Valley Estates
- 2021-08-24: THE RIDGE DEVELOPMENT, Deadwood: SDR10K396, held by the RIDGE Development
- 2021-08-24: RIVER VALLEY ADDITION PHASE I, North Sioux City: SDR10K398, held by River Valley Addition Phase I
- 2021-08-24: YELLOW JACKET SITE PLAN, Harrisburg: SDR10K399, held by Yellow Jacket Site Plan
- 2021-08-26: SUMMIT NORTH SIDE ADDITION, Summit: SDR10K406, held by Summit North Side Addition
- 2021-08-26: 41 ELLIS ADDITION, Sioux Falls: SDR10K407, held by 41 Ellis Addition
BURNSFIELD ADDITION among its neighbors
97 discharge permits are in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705); SDR10K395 is one.
Other permits in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705)
- 2025 CINDER AND LIME SLURRY PONDS CLOSURE BY REMOVAL, Sioux Falls: SDR10P5PU, minor, term to 2028-10-31
- ALIBI BAR, Sioux Falls: SDR10K703, minor, term to 2023-03-31
- ARROWHEAD PARKWAY PHASE 2B @ VETERANS PARKWAY, Sioux Falls: SDR10P5ET, minor, term to 2028-10-31
- ASPEN HARBOR ADDITION, Brandon: SDR10I075, minor, term to 2023-03-31
- BIG SIOUX RECREATION OUTLET IMPROVEMENT, Brandon: SDR10P5A4, minor, term to 2028-10-31
- BRANDON CORE AREA RECONSTRUCTION, PHASE 2B, Brandon: SDR10P5A2, minor, term to 2028-10-31
- BRANDON WTP EXPANSION, Brandon: SDR10K836, minor, term to 2023-03-31
- BRANDON, CITY OF (WTP), Brandon: SDG860074, minor, term to 2021-09-30
- BURWELL SITE, Sioux Falls: SDR10K864, minor, term to 2023-03-31
- BYRE APARTMENTS, Sioux Falls: SDR10K078, minor, term to 2023-03-31
What stands out
- Its term runs 1 year and 223 days, August 20, 2021 to March 31, 2023; the term ended 1,293 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | BURNSFIELD ADDITION |
|---|---|
| Permittee | Burnsfield Addition |
| NPDES ID | SDR10K395 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 20, 2021 |
| Expires | March 31, 2023 |
| Agency | State |
| Address | Sioux Falls, SD 57105 |
| Receiving water | unnamed creek |
| Subwatershed | Cactus Hills-Big Sioux River (HUC 101702031705) |
| NAICS | 237310 – Highway, Street, and Bridge Construction |
| SIC | 1611 – Highway And Street Construction |
NPDES SDR10K395: effluent limits and exceedances
BURNSFIELD ADDITION (NPDES SDR10K395): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10K395: no pollutant row on file.
NPDES SDR10K395: inspections, violations and enforcement
NPDES SDR10K395 (BURNSFIELD ADDITION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10K395
NPDES SDR10K395: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10K395
NPDES SDR10K395: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.