Clean Water Act discharge permit · NPDES SDR10K837
GEVO NET ZERO 1, Lake Preston, SD: NPDES SDR10K837 discharge permit, effluent exceedances, inspections, penalties
- Administratively continuedPermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
GEVO NET ZERO 1, held by Gevo Net Zero 1 LLC, holds NPDES permit SDR10K837. EPA’s file records it issued September 12, 2022 and expiring March 31, 2023. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for GEVO NET ZERO 1: its NPDES ID, its permit type and status, its dates, its address in Lake Preston, South Dakota. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES SDR10K837.
Identity
| Facility as filed | GEVO NET ZERO 1 |
|---|---|
| Permittee as filed | Gevo Net Zero 1 LLC |
| NPDES ID | SDR10K837 |
| Permit status | Administratively continued (past its expiration date and still in force until reissued) |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | September 12, 2022 |
| Expiration date | March 31, 2023 |
| Issuing agency | State |
| Address | Lake Preston, SD 57249 |
| Subwatershed | Lake Preston Lakebed (HUC 101701030203) |
| NAICS | 237990 – Other Heavy and Civil Engineering Construction |
| SIC | 1629 – Heavy Construction |
Cited to the EPA ICIS-NPDES permit file (ECHO download) and EPA’s NAICS/SIC and component files, the same download.
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES SDR10K837.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES SDR10K837.
Inspections
EPA’s inspection file holds no inspection for NPDES SDR10K837.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES SDR10K837.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, SDR10K837.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID SDR10K837 there.
GEVO NET ZERO 1, Lake Preston, South Dakota: Coverage under a general permit SDR10K837, held by Gevo Net Zero 1 LLC; Construction stormwater; Administratively continued (past its expiration date and still in force until reissued); issued September 12, 2022, term to March 31, 2023, by State; Other Heavy and Civil Engineering Construction.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 415 were issued before SDR10K837.
Coverages issued nearest SDR10K837
- 2022-09-02: B-21: MISSION OPERATIONS PLANNING FACILITY/FIELD TRAINING DETACHMENT FACILITY, Ellsworth Afb: SDR10K832, held by United States Army Corps of Engineers
- 2022-09-05: HR2 STRIP MALL, Sioux Falls: SDR10P245, held by ANUVIC LLC
- 2022-09-08: ISABELLA ADDITION, Watertown: SDR10K843, held by Steve Horning
- 2022-09-08: LOT 6/TRACT 4 CANTON DEVELOPMENT ADDITION, Canton: SDR10K869, held by Wurtz Construction
- 2022-09-12: BRANDON WTP EXPANSION, Brandon: SDR10K836, held by City of Brandon
- 2022-09-12: NEIGHBORHOOD DENTAL, Sioux Falls: SDR10K842, held by Neighborhood Dental
- 2022-09-12: PCN 04KR, Roswell: SDR10P236, held by SD Department of Transportation
- 2022-09-19: MARSHALL DAIRY EAST - DIGESTER, Veblen: SDR10K848, held by Riverview LLP
- 2022-09-19: MARSHALL DAIRY WEST - DIGESTER, Veblen: SDR10K849, held by Riverview LLP
- 2022-09-23: WILD SPRINGS SOLAR PROJECT, New Underwood: SDR10K855, held by Wild Springs Solar LLC
GEVO NET ZERO 1 among its neighbors
3 discharge permits are in the Lake Preston Lakebed subwatershed (HUC 101701030203); SDR10K837 is one.
Other permits in the Lake Preston Lakebed subwatershed (HUC 101701030203)
- GEVO NET ZERO 1, Lake Preston: SD0028650
- KINGSBURY COUNTY SWITCHING STATION GRADING, Lake Preston: SDR10P5M0, minor, term to 2028-10-31
Nearby on the register
- Discharge permits in Lake Preston
- Every permit record in Lake Preston, A to Z
- Discharge permits in South Dakota
- Every permit record in South Dakota, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
GEVO NET ZERO 1 is one of 3 NPDES permits in the Lake Preston Lakebed subwatershed, and it is one of 5 storm water construction permits in Lake Preston. Among those 5 Lake Preston storm water construction permits, 0.0% carry a violation on file, and this permit recorded 0 pollutants with an effluent exceedance.