NPDES SDR10K836 · Clean Water Act
BRANDON WTP EXPANSION, Brandon, SD: NPDES SDR10K836 discharge permit, effluent exceedances, inspections, penalties
BRANDON WTP EXPANSION, Brandon, South Dakota: General permit coverage SDR10K836, held by City of Brandon; Construction stormwater; Administratively continued; issued September 12, 2022, term to March 31, 2023, by State.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 415 were issued before SDR10K836. City of Brandon holds 4 permits in South Dakota.
Other permits held by City of Brandon
- RUSHMORE AREA RECONSTRUCTION - PHASE 2, Brandon: SDR10K957
- BRANDON CORE AREA RECONSTRUCTION, PHASE 2B, Brandon: SDR10P5A2, issued 2024-08-13
- SD 11/I-90 EXIT 406 WATER MAIN AND SANITARY SEWER, Brandon: SDR10P5A3, issued 2024-08-13
Coverages issued nearest SDR10K836
- 2022-09-02: B-21: FORMAL TRAINING UNIT/AMU (FTU), Ellsworth Afb: SDR10K831, held by United States Army Corps of Engineers
- 2022-09-02: B-21: MISSION OPERATIONS PLANNING FACILITY/FIELD TRAINING DETACHMENT FACILITY, Ellsworth Afb: SDR10K832, held by United States Army Corps of Engineers
- 2022-09-05: HR2 STRIP MALL, Sioux Falls: SDR10P245, held by ANUVIC LLC
- 2022-09-08: ISABELLA ADDITION, Watertown: SDR10K843, held by Steve Horning
- 2022-09-08: LOT 6/TRACT 4 CANTON DEVELOPMENT ADDITION, Canton: SDR10K869, held by Wurtz Construction
- 2022-09-12: GEVO NET ZERO 1, Lake Preston: SDR10K837, held by Gevo Net Zero 1 LLC
- 2022-09-12: NEIGHBORHOOD DENTAL, Sioux Falls: SDR10K842, held by Neighborhood Dental
- 2022-09-12: PCN 04KR, Roswell: SDR10P236, held by SD Department of Transportation
- 2022-09-19: MARSHALL DAIRY EAST - DIGESTER, Veblen: SDR10K848, held by Riverview LLP
- 2022-09-19: MARSHALL DAIRY WEST - DIGESTER, Veblen: SDR10K849, held by Riverview LLP
BRANDON WTP EXPANSION among its neighbors
97 discharge permits are in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705); SDR10K836 is one. Its county: 56, 2 major; SDR10K836 is minor permit.
Other permits in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705)
- 2025 CINDER AND LIME SLURRY PONDS CLOSURE BY REMOVAL, Sioux Falls: SDR10P5PU, minor, term to 2028-10-31
- ALIBI BAR, Sioux Falls: SDR10K703, minor, term to 2023-03-31
- ARROWHEAD PARKWAY PHASE 2B @ VETERANS PARKWAY, Sioux Falls: SDR10P5ET, minor, term to 2028-10-31
- ASPEN HARBOR ADDITION, Brandon: SDR10I075, minor, term to 2023-03-31
- BIG SIOUX RECREATION OUTLET IMPROVEMENT, Brandon: SDR10P5A4, minor, term to 2028-10-31
- BRANDON CORE AREA RECONSTRUCTION, PHASE 2B, Brandon: SDR10P5A2, minor, term to 2028-10-31
- BRANDON, CITY OF (WTP), Brandon: SDG860074, minor, term to 2021-09-30
- BURNSFIELD ADDITION, Sioux Falls: SDR10K395, minor, term to 2023-03-31
- BURWELL SITE, Sioux Falls: SDR10K864, minor, term to 2023-03-31
- BYRE APARTMENTS, Sioux Falls: SDR10K078, minor, term to 2023-03-31
What stands out
- Its term runs 200 days, September 12, 2022 to March 31, 2023; the term ended 1,264 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | BRANDON WTP EXPANSION |
|---|---|
| Permittee | City of Brandon |
| NPDES ID | SDR10K836 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 12, 2022 |
| Expires | March 31, 2023 |
| Agency | State |
| Address | Brandon, SD 57005 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Cactus Hills-Big Sioux River (HUC 101702031705) |
NPDES SDR10K836: effluent limits and exceedances
BRANDON WTP EXPANSION (NPDES SDR10K836): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10K836: no pollutant row on file.
NPDES SDR10K836: inspections, violations and enforcement
NPDES SDR10K836 (BRANDON WTP EXPANSION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10K836
NPDES SDR10K836: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10K836
NPDES SDR10K836: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.