NPDES SDR10P5A9 · Clean Water Act
PHASE 4 UTILITY IMPROVEMENTS, Miller, SD: NPDES SDR10P5A9 discharge permit, effluent exceedances, inspections, penalties
PHASE 4 UTILITY IMPROVEMENTS, Miller, South Dakota: General permit coverage SDR10P5A9, held by City of Miller; Construction stormwater; Effective; issued October 7, 2024, term to October 31, 2028, by SDDANR.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 665 were issued before SDR10P5A9. City of Miller holds 2 permits in South Dakota.
Other permits held by City of Miller
- AIRPORT CONNECTOR TAXIWAY AND ACCESS ROAD, Miller: SDR10P5UH, issued 2026-06-08
Coverages issued nearest SDR10P5A9
- 2024-09-24: SULLY LAKE SUBSTATION, Pierre: SDR10P5C8, held by Morris, Inc
- 2024-09-24: SHEPHERD HILLS SOUTH PHASE 6 - UTILITIES, Rapid City: SDR10P5C9, held by Dream Construction, Inc.
- 2024-09-24: ALLCITY SUITES & STORAGE - PIERRE, Pierre: SDR10P5CF, held by AllCity Suites & Storage, LLC
- 2024-09-25: REPAIR AND REHABILITATE CONATA PICNIC ROAD, BADLANDS NATIONAL PARK, Wall: SDR10P5AR, held by Morris Inc.
- 2024-09-25: SCHUSTER SITE AND POND, Hartford: SDR10P5BM, held by Runge Enterprises, Inc.
- 2024-10-07: BLACK HILLS AIRPORT GENERAL AVIATION TAXILANES RECONSTRUCTION & EXTENSION, Spearfish: SDR10P5CE, held by North Start Construction, Inc.
- 2024-10-07: EXCEPTIONAL HEALTHCARE - RAPID CITY, SD 57701, Rapid City: SDR10P5CY, held by Dean Kurtz Construction
- 2024-10-08: BRANDON VALLEY ELEMENTARY SCHOOL (EASTSIDE), Brandon: SDR10P5C7, held by Brandon Valley School District
- 2024-10-08: CENTENNIAL MOUNTAIN ESTATES: PHASE 1, Spearfish: SDR10P5CO, held by ARC Development LLC
- 2024-10-09: PRIMROSE SCHOOL, Sioux Falls: SDR10P5CD, held by Bespoke Beginnings Propco, LLC
PHASE 4 UTILITY IMPROVEMENTS among its neighbors
6 discharge permits are in the Lower Ree Creek subwatershed (HUC 101600090103); SDR10P5A9 is one.
Other permits in the Lower Ree Creek subwatershed (HUC 101600090103)
- AIRPORT CONNECTOR TAXIWAY AND ACCESS ROAD, Miller: SDR10P5UH, minor, term to 2028-10-31
- MID DAKOTA RURAL WATER SYSTEM, CONTRACT 4-7, SCHEDULE 2 & 3, Miller: SDR10P5KY, minor, term to 2028-10-31
- MID-DAKOTA RURAL WATER SYSTEM (WTP), Miller: SDG860043, minor, term to 2021-09-30
- MILLER, CITY OF, Miller: SD0022659, minor, term to 2021-03-31
- WESSINGTON SPRINGS EXPANSION CONTRACT 4-8, Miller: SDR10P5TT, minor, term to 2028-10-31
Identity
| Facility | PHASE 4 UTILITY IMPROVEMENTS |
|---|---|
| Permittee | City of Miller |
| NPDES ID | SDR10P5A9 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 7, 2024 |
| Expires | October 31, 2028 |
| Agency | SDDANR |
| Address | Miller, SD 57362 |
| Subwatershed | Lower Ree Creek (HUC 101600090103) |
NPDES SDR10P5A9: effluent limits and exceedances
PHASE 4 UTILITY IMPROVEMENTS (NPDES SDR10P5A9): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10P5A9: no pollutant row on file.
NPDES SDR10P5A9: inspections, violations and enforcement
NPDES SDR10P5A9 (PHASE 4 UTILITY IMPROVEMENTS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10P5A9
NPDES SDR10P5A9: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10P5A9
NPDES SDR10P5A9: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.