NPDES SDR10P5C8 · Clean Water Act
SULLY LAKE SUBSTATION, Pierre, SD: NPDES SDR10P5C8 discharge permit, effluent exceedances, inspections, penalties
SULLY LAKE SUBSTATION, Pierre, South Dakota: General permit coverage SDR10P5C8, held by Morris, Inc; Construction stormwater; Effective; issued September 24, 2024, term to October 31, 2028, by SDDANR.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 655 were issued before SDR10P5C8.
Coverages issued nearest SDR10P5C8
- 2024-09-24: DIESEL MACHINERY INC., Sioux Falls: SDR10P5A0, held by Diesel Machinery Inc
- 2024-09-24: YANKTON RURAL & VERMILLION RURAL, Yankton: SDR10P5AO, held by Santel Communications
- 2024-09-24: LOT 1 BLOCK 7 TALLGRASS, Brandon: SDR10P5B2, held by Sure Foundation Lutheran Church
- 2024-09-24: PLAINVIEW DAIRY, Toronto: SDR10P5BT, held by Plainview Dairy, LLC
- 2024-09-24: SDSU - SCLB 6026, AES COTTONWOOD FIELD STATION RENOVATIONS AND UPGRADES, Philip: SDR10P5BX, held by Bureau of Administration
- 2024-09-24: SHEPHERD HILLS SOUTH PHASE 6 - UTILITIES, Rapid City: SDR10P5C9, held by Dream Construction, Inc.
- 2024-09-24: ALLCITY SUITES & STORAGE - PIERRE, Pierre: SDR10P5CF, held by AllCity Suites & Storage, LLC
- 2024-09-25: REPAIR AND REHABILITATE CONATA PICNIC ROAD, BADLANDS NATIONAL PARK, Wall: SDR10P5AR, held by Morris Inc.
- 2024-09-25: SCHUSTER SITE AND POND, Hartford: SDR10P5BM, held by Runge Enterprises, Inc.
- 2024-10-07: PHASE 4 UTILITY IMPROVEMENTS, Miller: SDR10P5A9, held by City of Miller
SULLY LAKE SUBSTATION among its neighbors
1 discharge permits are in the Okobojo Lake-Okobojo Creek subwatershed (HUC 101301051806); SDR10P5C8 is one.
What stands out
- Its term runs 4 years and 37 days, September 24, 2024 to October 31, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SULLY LAKE SUBSTATION |
|---|---|
| Permittee | Morris, Inc |
| NPDES ID | SDR10P5C8 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 24, 2024 |
| Expires | October 31, 2028 |
| Agency | SDDANR |
| Address | Pierre, SD 57501 |
| Subwatershed | Okobojo Lake-Okobojo Creek (HUC 101301051806) |
NPDES SDR10P5C8: effluent limits and exceedances
SULLY LAKE SUBSTATION (NPDES SDR10P5C8): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10P5C8: no pollutant row on file.
NPDES SDR10P5C8: inspections, violations and enforcement
NPDES SDR10P5C8 (SULLY LAKE SUBSTATION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10P5C8
NPDES SDR10P5C8: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10P5C8
NPDES SDR10P5C8: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.