NPDES SDR10P5C5 · Clean Water Act
HOWARD-MISSOURI RIVER BANK STABILIZATION PROJECT NWO-2014-00998-PIE, Geddes, SD: NPDES SDR10P5C5 discharge permit, effluent exceedances, inspections, penalties
HOWARD-MISSOURI RIVER BANK STABILIZATION PROJECT NWO-2014-00998-PIE, Geddes, South Dakota: General permit coverage SDR10P5C5, held by David Howard; Construction stormwater; Effective; issued September 10, 2024, term to October 31, 2028, by SDDANR.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 646 were issued before SDR10P5C5.
Coverages issued nearest SDR10P5C5
- 2024-09-04: BIRDIE VIEW DEVELOPMENT, Harrisburg: SDR10P5B4, held by Birdie View, LLC
- 2024-09-10: WILD ROSE DAIRY EXPANSION, Brandt: SDR10P5B8, held by Wildrose Dairy
- 2024-09-10: DEER BOULEVARD ESTATES, Yankton: SDR10P5BI, held by BD Construction, LLC
- 2024-09-10: DOLLAR TREE, Sioux Falls: SDR10P5BK, held by SkoBros LLC
- 2024-09-10: STORAGE UNIT DEVELOPMENT, Harrisburg: SDR10P5C3, held by Forever-Co
- 2024-09-23: LIBERTY RIDGE, Sioux Falls: SDR10P5B6, held by Nielson Development
- 2024-09-23: WHISKEY RIDGE SUBDIVISION, Sturgis: SDR10P5BH, held by Whiskey Ridge LLC
- 2024-09-23: CUSTER HIGH SCHOOL CTE FACILITY, Custer: SDR10P5BQ, held by Dean Kurtz Construction
- 2024-09-23: SCHIPPOREIT BUILDING SITE, Spearfish: SDR10P5CC, held by Tate Schipporeit
- 2024-09-24: DIESEL MACHINERY INC., Sioux Falls: SDR10P5A0, held by Diesel Machinery Inc
HOWARD-MISSOURI RIVER BANK STABILIZATION PROJECT NWO-2014-00998-PIE among its neighbors
3 discharge permits are in the Lake Andes subwatershed (HUC 101401011706); SDR10P5C5 is one.
Other permits in the Lake Andes subwatershed (HUC 101401011706)
- LAKE ANDES NATIONAL WILDLIFE REFUGE COMPLEX, Lake Andes: SDR10P5PK, minor, term to 2028-10-31
- STORM SEWER IMPROVEMENTS, Ravinia: SDR10I03H, minor, term to 2027-02-16
What stands out
- Its term runs 4 years and 51 days, September 10, 2024 to October 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | HOWARD-MISSOURI RIVER BANK STABILIZATION PROJECT NWO-2014-00998-PIE |
|---|---|
| Permittee | David Howard |
| NPDES ID | SDR10P5C5 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 10, 2024 |
| Expires | October 31, 2028 |
| Agency | SDDANR |
| Address | Geddes, SD 57342 |
| Subwatershed | Lake Andes (HUC 101401011706) |
NPDES SDR10P5C5: effluent limits and exceedances
HOWARD-MISSOURI RIVER BANK STABILIZATION PROJECT NWO-2014-00998-PIE (NPDES SDR10P5C5): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10P5C5: no pollutant row on file.
NPDES SDR10P5C5: inspections, violations and enforcement
NPDES SDR10P5C5 (HOWARD-MISSOURI RIVER BANK STABILIZATION PROJECT NWO-2014-00998-PIE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10P5C5
NPDES SDR10P5C5: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10P5C5
NPDES SDR10P5C5: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.