NPDES SDR10P5B6 · Clean Water Act
LIBERTY RIDGE, Sioux Falls, SD: NPDES SDR10P5B6 discharge permit, effluent exceedances, inspections, penalties
LIBERTY RIDGE, Sioux Falls, South Dakota: General permit coverage SDR10P5B6, held by Nielson Development; Construction stormwater; Effective; issued September 23, 2024, term to October 31, 2028, by SDDANR.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 651 were issued before SDR10P5B6.
Coverages issued nearest SDR10P5B6
- 2024-09-10: WILD ROSE DAIRY EXPANSION, Brandt: SDR10P5B8, held by Wildrose Dairy
- 2024-09-10: DEER BOULEVARD ESTATES, Yankton: SDR10P5BI, held by BD Construction, LLC
- 2024-09-10: DOLLAR TREE, Sioux Falls: SDR10P5BK, held by SkoBros LLC
- 2024-09-10: STORAGE UNIT DEVELOPMENT, Harrisburg: SDR10P5C3, held by Forever-Co
- 2024-09-10: HOWARD-MISSOURI RIVER BANK STABILIZATION PROJECT NWO-2014-00998-PIE, Geddes: SDR10P5C5, held by David Howard
- 2024-09-23: WHISKEY RIDGE SUBDIVISION, Sturgis: SDR10P5BH, held by Whiskey Ridge LLC
- 2024-09-23: CUSTER HIGH SCHOOL CTE FACILITY, Custer: SDR10P5BQ, held by Dean Kurtz Construction
- 2024-09-23: SCHIPPOREIT BUILDING SITE, Spearfish: SDR10P5CC, held by Tate Schipporeit
- 2024-09-24: DIESEL MACHINERY INC., Sioux Falls: SDR10P5A0, held by Diesel Machinery Inc
- 2024-09-24: YANKTON RURAL & VERMILLION RURAL, Yankton: SDR10P5AO, held by Santel Communications
LIBERTY RIDGE among its neighbors
97 discharge permits are in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705); SDR10P5B6 is one.
Other permits in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705)
- 2025 CINDER AND LIME SLURRY PONDS CLOSURE BY REMOVAL, Sioux Falls: SDR10P5PU, minor, term to 2028-10-31
- ALIBI BAR, Sioux Falls: SDR10K703, minor, term to 2023-03-31
- ARROWHEAD PARKWAY PHASE 2B @ VETERANS PARKWAY, Sioux Falls: SDR10P5ET, minor, term to 2028-10-31
- ASPEN HARBOR ADDITION, Brandon: SDR10I075, minor, term to 2023-03-31
- BIG SIOUX RECREATION OUTLET IMPROVEMENT, Brandon: SDR10P5A4, minor, term to 2028-10-31
- BRANDON CORE AREA RECONSTRUCTION, PHASE 2B, Brandon: SDR10P5A2, minor, term to 2028-10-31
- BRANDON WTP EXPANSION, Brandon: SDR10K836, minor, term to 2023-03-31
- BRANDON, CITY OF (WTP), Brandon: SDG860074, minor, term to 2021-09-30
- BURNSFIELD ADDITION, Sioux Falls: SDR10K395, minor, term to 2023-03-31
- BURWELL SITE, Sioux Falls: SDR10K864, minor, term to 2023-03-31
What stands out
- Its term runs 4 years and 38 days, September 23, 2024 to October 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | LIBERTY RIDGE |
|---|---|
| Permittee | Nielson Development |
| NPDES ID | SDR10P5B6 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2024 |
| Expires | October 31, 2028 |
| Agency | SDDANR |
| Address | Sioux Falls, SD 57110 |
| Subwatershed | Cactus Hills-Big Sioux River (HUC 101702031705) |
NPDES SDR10P5B6: effluent limits and exceedances
LIBERTY RIDGE (NPDES SDR10P5B6): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10P5B6: no pollutant row on file.
NPDES SDR10P5B6: inspections, violations and enforcement
NPDES SDR10P5B6 (LIBERTY RIDGE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10P5B6
NPDES SDR10P5B6: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10P5B6
NPDES SDR10P5B6: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.