NPDES SDR10P5E9 · Clean Water Act
WATER MAIN REPLACEMENT AND METER PIT INSTALLATION, Blackhawk, SD: NPDES SDR10P5E9 discharge permit, effluent exceedances, inspections, penalties
WATER MAIN REPLACEMENT AND METER PIT INSTALLATION, Blackhawk, South Dakota: General permit coverage SDR10P5E9, held by Lidel Construction; Construction stormwater; Effective; issued January 6, 2025, term to October 31, 2028, by SDDANR.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 712 were issued before SDR10P5E9. Lidel Construction holds 3 permits in South Dakota.
Other permits held by Lidel Construction
- WATERMAIN AND SITEWORK IMPROVEMENTS, Southwest Meade: SDR10P5EF, issued 2025-01-06
- DIMOCK DAM, Dimock: SDR10P5P1, issued 2025-09-22
Coverages issued nearest SDR10P5E9
- 2025-01-03: PCN 04FC - EPA, Pine Ridge: SDR10I03N, held by SD Department of Transportation
- 2025-01-03: BASIN 15 EQ BASIN AND LIFT STATION, PHASE 2C EXTENSTION, Sioux Falls: SDR10P5EP, held by City of Sioux Falls
- 2025-01-03: 12TH STREET LEWIS & CLARK CONNECTION - PHASE 1, Sioux Falls: SDR10P5EQ, held by City of Sioux Falls
- 2025-01-03: PUMP STATION 240 PHASE 2B - ARROWHEAD, Sioux Falls: SDR10P5EU, held by City of Sioux Falls
- 2025-01-03: 3525 DYESS AVE GRADING PROJECT, Rapid City: SDR10P5F5, held by Western Construction
- 2025-01-06: WATERMAIN AND SITEWORK IMPROVEMENTS, Southwest Meade: SDR10P5EF, held by Lidel Construction
- 2025-01-06: CREEKSIDE HEIGHTS APARTMENTS PHASE 2, Rapid City: SDR10P5F6, held by Paradigm Construction, LLC
- 2025-01-09: PCN 08N8, Tulare: SDR10P5EY, held by SD Department of Transportation
- 2025-01-09: PCN 08N9, Northville: SDR10P5EZ, held by SD Department of Transportation
- 2025-01-09: PCN 0609, Colman: SDR10P5F7, held by SD Department of Transportation
WATER MAIN REPLACEMENT AND METER PIT INSTALLATION among its neighbors
5 discharge permits are in the Stagebarn Canyon Creek subwatershed (HUC 101201110603); SDR10P5E9 is one.
Other permits in the Stagebarn Canyon Creek subwatershed (HUC 101201110603)
- PCN 08LD, Summerset: SDR10P305, minor, term to 2023-03-31
- SUMMERSET HEIGHTS APARTMENTS, Summerset: SDR10K613, minor, term to 2023-03-31
- SUMMERSET WASTE WATER TREATMENT PLANT REED BED EXPANSION, Summerset: SDR10P5R2, minor, term to 2028-10-31
- SUMMERSET, CITY OF, Summerset, City Of: SDL027758, minor, term to 2011-06-30
Identity
| Facility | WATER MAIN REPLACEMENT AND METER PIT INSTALLATION |
|---|---|
| Permittee | Lidel Construction |
| NPDES ID | SDR10P5E9 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 6, 2025 |
| Expires | October 31, 2028 |
| Agency | SDDANR |
| Address | Blackhawk, SD 57718 |
| Subwatershed | Stagebarn Canyon Creek (HUC 101201110603) |
NPDES SDR10P5E9: effluent limits and exceedances
WATER MAIN REPLACEMENT AND METER PIT INSTALLATION (NPDES SDR10P5E9): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10P5E9: no pollutant row on file.
NPDES SDR10P5E9: inspections, violations and enforcement
NPDES SDR10P5E9 (WATER MAIN REPLACEMENT AND METER PIT INSTALLATION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10P5E9
NPDES SDR10P5E9: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10P5E9
NPDES SDR10P5E9: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.