NPDES SDR10P5EU · Clean Water Act
PUMP STATION 240 PHASE 2B - ARROWHEAD, Sioux Falls, SD: NPDES SDR10P5EU discharge permit, effluent exceedances, inspections, penalties
PUMP STATION 240 PHASE 2B - ARROWHEAD, Sioux Falls, South Dakota: General permit coverage SDR10P5EU, held by City of Sioux Falls; Construction stormwater; Effective; issued January 3, 2025, term to October 31, 2028, by SDDANR.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 706 were issued before SDR10P5EU. City of Sioux Falls holds 38 permits in South Dakota.
Other permits held by City of Sioux Falls
- E 57TH STREET EXPANSION PROJECT, Sioux Falls: SDR10P113, issued 2021-04-28
- JACOBSON PLAZA AT FALLS PARK, Sioux Falls: SDR10P251, issued 2022-10-19
- PARK ROADS & PARKING LOT IMPROVEMENTS, Sioux Falls: SDR10P286
- COVELL LAKE JAPANESE GARDENS SHORELINE IMPROVEMENTS, Sioux Falls: SDR10P380
- BASIN 15 SANITARY SEWER, PHASE 2A & PHASE 2B EXTENSION, Sioux Falls: SDR10P5B1, issued 2024-08-13
- BASIN 15 EQ BASIN AND LIFT STATION, PHASE 2C EXTENSTION, Sioux Falls: SDR10P5EP, issued 2025-01-03
- 12TH STREET LEWIS & CLARK CONNECTION - PHASE 1, Sioux Falls: SDR10P5EQ, issued 2025-01-03
- ARROWHEAD PARKWAY PHASE 2B @ VETERANS PARKWAY, Sioux Falls: SDR10P5ET, issued 2025-01-02
- LIGHT, POWER, AND TRAFFIC FACILITY, Sioux Falls: SDR10P5GQ, issued 2025-03-12
- 72ND STREET NORTH IMPROVEMENTS, Sioux Falls: SDR10P5H4, issued 2025-03-12
Coverages issued nearest SDR10P5EU
- 2025-01-02: CUSTER DAM RECONSTRUCTION, Custer: SDR10P5F1, held by City of Custer
- 2025-01-03: PCN 05TY - EPA, Mclaughlin: NDR10I05U, held by SD Department of Transportation
- 2025-01-03: PCN 04FC - EPA, Pine Ridge: SDR10I03N, held by SD Department of Transportation
- 2025-01-03: BASIN 15 EQ BASIN AND LIFT STATION, PHASE 2C EXTENSTION, Sioux Falls: SDR10P5EP, held by City of Sioux Falls
- 2025-01-03: 12TH STREET LEWIS & CLARK CONNECTION - PHASE 1, Sioux Falls: SDR10P5EQ, held by City of Sioux Falls
- 2025-01-03: 3525 DYESS AVE GRADING PROJECT, Rapid City: SDR10P5F5, held by Western Construction
- 2025-01-06: WATER MAIN REPLACEMENT AND METER PIT INSTALLATION, Blackhawk: SDR10P5E9, held by Lidel Construction
- 2025-01-06: WATERMAIN AND SITEWORK IMPROVEMENTS, Southwest Meade: SDR10P5EF, held by Lidel Construction
- 2025-01-06: CREEKSIDE HEIGHTS APARTMENTS PHASE 2, Rapid City: SDR10P5F6, held by Paradigm Construction, LLC
- 2025-01-09: PCN 08N8, Tulare: SDR10P5EY, held by SD Department of Transportation
PUMP STATION 240 PHASE 2B - ARROWHEAD among its neighbors
97 discharge permits are in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705); SDR10P5EU is one.
Other permits in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705)
- 2025 CINDER AND LIME SLURRY PONDS CLOSURE BY REMOVAL, Sioux Falls: SDR10P5PU, minor, term to 2028-10-31
- ALIBI BAR, Sioux Falls: SDR10K703, minor, term to 2023-03-31
- ARROWHEAD PARKWAY PHASE 2B @ VETERANS PARKWAY, Sioux Falls: SDR10P5ET, minor, term to 2028-10-31
- ASPEN HARBOR ADDITION, Brandon: SDR10I075, minor, term to 2023-03-31
- BIG SIOUX RECREATION OUTLET IMPROVEMENT, Brandon: SDR10P5A4, minor, term to 2028-10-31
- BRANDON CORE AREA RECONSTRUCTION, PHASE 2B, Brandon: SDR10P5A2, minor, term to 2028-10-31
- BRANDON WTP EXPANSION, Brandon: SDR10K836, minor, term to 2023-03-31
- BRANDON, CITY OF (WTP), Brandon: SDG860074, minor, term to 2021-09-30
- BURNSFIELD ADDITION, Sioux Falls: SDR10K395, minor, term to 2023-03-31
- BURWELL SITE, Sioux Falls: SDR10K864, minor, term to 2023-03-31
Identity
| Facility | PUMP STATION 240 PHASE 2B - ARROWHEAD |
|---|---|
| Permittee | City of Sioux Falls |
| NPDES ID | SDR10P5EU |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 3, 2025 |
| Expires | October 31, 2028 |
| Agency | SDDANR |
| Address | Sioux Falls, SD 57110 |
| Subwatershed | Cactus Hills-Big Sioux River (HUC 101702031705) |
NPDES SDR10P5EU: effluent limits and exceedances
PUMP STATION 240 PHASE 2B - ARROWHEAD (NPDES SDR10P5EU): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10P5EU: no pollutant row on file.
NPDES SDR10P5EU: inspections, violations and enforcement
NPDES SDR10P5EU (PUMP STATION 240 PHASE 2B - ARROWHEAD): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10P5EU
NPDES SDR10P5EU: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10P5EU
NPDES SDR10P5EU: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.