NPDES SDR10P5MR · Clean Water Act
ALPHA AVENUE SEWER PROJECT, Box Elder, SD: NPDES SDR10P5MR discharge permit, effluent exceedances, inspections, penalties
ALPHA AVENUE SEWER PROJECT, Box Elder, South Dakota: General permit coverage SDR10P5MR, held by Flatland Excavating; Construction stormwater; Effective; issued August 26, 2025, term to October 31, 2028, by SDDANR.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 936 were issued before SDR10P5MR. Flatland Excavating holds 3 permits in South Dakota.
Other permits held by Flatland Excavating
- AGENCY VILLAGE WATER MAIN LOOPING, Agency Village: SDR10I03A, issued 2024-06-17
- SPRING CREEK / COW CREEK SANITARY DISTRICT WASTEWATER TREATMENT FACILITY, Pierre: SDR10P5MI, issued 2025-06-30
Coverages issued nearest SDR10P5MR
- 2025-08-25: DUMONT HOLDINGS SUBDIVISION, Yankton: SDR10P5PB, held by Dumont Holding LLC
- 2025-08-26: COLONIAL ESTATES ADDITION, Salem: SDR10P5F4, held by Salem Economic Development Corporation
- 2025-08-26: THE TERRACES AT WESTHILL'S VILLAGE PHASE 1, Rapid City: SDR10P5G5, held by Scull Construction
- 2025-08-26: CHS ZIP TRIP - SOUTHERN VISTAS, Sioux Falls: SDR10P5GS, held by Cenex Zip Trip
- 2025-08-26: DENVER TERRACE APARTMENTS, Rapid City: SDR10P5IM, held by Blackwing Elite Builders
- 2025-08-26: MCGRIFF SUBDIVISION / LINE ROAD, Box Elder, Sd: SDR10P5OW, held by LESKCA, Inc
- 2025-08-26: FSD CONSTRUCT SNOW REMOVAL EQUIPMENT (SRE) ACCESS ROAD, Sioux Falls: SDR10P5P3, held by Sioux Falls Regional Airport
- 2025-08-28: PCN 09MD - EPA, Wanblee: SDR10I047, held by SD Department of Transportation
- 2025-09-05: CONSTRUCT PHASE 2 TERMINAL APRON EXPANSION, Sioux Falls: SDR10P5N9, held by Sioux Falls Regional Airport Authority
- 2025-09-05: KNIFE RIVER CORSON EXPANSION, Brandon: SDR10P5O3, held by Knife River South Dakota
ALPHA AVENUE SEWER PROJECT among its neighbors
46 discharge permits are in the Ellsworth Air Force Base-Boxelder Creek subwatershed (HUC 101201110401); SDR10P5MR is one.
Other permits in the Ellsworth Air Force Base-Boxelder Creek subwatershed (HUC 101201110401)
- 1416 SANITARY SEWER UPGRADE PHASE 1, Box Elder: SDR10P5KF, minor, term to 2028-10-31
- 449 CIMARRON, Box Elder: SDR10P548, minor, term to 2028-10-31
- ALPHA OMEGA SUBDIVISION PHASE 1, Box Elder: SDR10J764, minor, term to 2023-03-31
- AUTOZONE STORE #10687, Box Elder: SDR10P5NE, minor, term to 2028-10-31
- B-21 EAST ALERT APRON EPS, Ellsworth Air Force Base: SDR10P5UV, minor, term to 2028-10-31
- B-21 FUELS SYSTEM MAINTENANCE DOCK, Ellsworth Afb: SDR10P5AS, minor, term to 2028-10-31
- B-21 LOW OBSERVABLE RESTORATION FACILITY, Ellsworth Afb: SDR10K531, minor, term to 2023-03-31
- B-21 WEAPONS GENERATION FACILITY, Ellsworth Air Force Base: SDR10P55B, minor, term to 2028-10-31
- B-21: ADAL FLIGHT SIMULATOR FACILITY, Ellsworth Afb: SDR10P294, minor, term to 2023-03-31
- B-21: FORMAL TRAINING UNIT/AMU (FTU), Ellsworth Afb: SDR10K831, minor, term to 2023-03-31
What stands out
- Its term runs 3 years and 66 days, August 26, 2025 to October 31, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ALPHA AVENUE SEWER PROJECT |
|---|---|
| Permittee | Flatland Excavating |
| NPDES ID | SDR10P5MR |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 26, 2025 |
| Expires | October 31, 2028 |
| Agency | SDDANR |
| Address | Box Elder, SD 57719 |
| Subwatershed | Ellsworth Air Force Base-Boxelder Creek (HUC 101201110401) |
NPDES SDR10P5MR: effluent limits and exceedances
ALPHA AVENUE SEWER PROJECT (NPDES SDR10P5MR): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10P5MR: no pollutant row on file.
NPDES SDR10P5MR: inspections, violations and enforcement
NPDES SDR10P5MR (ALPHA AVENUE SEWER PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10P5MR
NPDES SDR10P5MR: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10P5MR
NPDES SDR10P5MR: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.