NPDES SDR10P5P3 · Clean Water Act
FSD CONSTRUCT SNOW REMOVAL EQUIPMENT (SRE) ACCESS ROAD, Sioux Falls, SD: NPDES SDR10P5P3 discharge permit, effluent exceedances, inspections, penalties
FSD CONSTRUCT SNOW REMOVAL EQUIPMENT (SRE) ACCESS ROAD, Sioux Falls, South Dakota: General permit coverage SDR10P5P3, held by Sioux Falls Regional Airport; Construction stormwater; Effective; issued August 26, 2025, term to October 31, 2028, by SDDANR.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 936 were issued before SDR10P5P3. Sioux Falls Regional Airport holds 4 permits in South Dakota.
Other permits held by Sioux Falls Regional Airport
- SIOUX FALLS AIRPORT AUTHORITY, Siu: SDPIU001J, issued 2021-12-01
- EASTSIDE WATER MAIN REPLACEMENT, Sioux Falls: SDR10P295
- EAST CARGO APRON, Sioux Falls: SDR10P53G, issued 2024-03-12
Coverages issued nearest SDR10P5P3
- 2025-08-26: THE TERRACES AT WESTHILL'S VILLAGE PHASE 1, Rapid City: SDR10P5G5, held by Scull Construction
- 2025-08-26: CHS ZIP TRIP - SOUTHERN VISTAS, Sioux Falls: SDR10P5GS, held by Cenex Zip Trip
- 2025-08-26: DENVER TERRACE APARTMENTS, Rapid City: SDR10P5IM, held by Blackwing Elite Builders
- 2025-08-26: ALPHA AVENUE SEWER PROJECT, Box Elder: SDR10P5MR, held by Flatland Excavating
- 2025-08-26: MCGRIFF SUBDIVISION / LINE ROAD, Box Elder, Sd: SDR10P5OW, held by LESKCA, Inc
- 2025-08-28: PCN 09MD - EPA, Wanblee: SDR10I047, held by SD Department of Transportation
- 2025-09-05: CONSTRUCT PHASE 2 TERMINAL APRON EXPANSION, Sioux Falls: SDR10P5N9, held by Sioux Falls Regional Airport Authority
- 2025-09-05: KNIFE RIVER CORSON EXPANSION, Brandon: SDR10P5O3, held by Knife River South Dakota
- 2025-09-05: UHV BUILDING 6, Sioux Falls: SDR10P5OV, held by UHV Building 6, LLC
- 2025-09-05: JOE DAVIS FEEDLOT, Forestburg: SDR10P5P9, held by Joe Davis
FSD CONSTRUCT SNOW REMOVAL EQUIPMENT (SRE) ACCESS ROAD among its neighbors
101 discharge permits are in the Falls of the Big Sioux River subwatershed (HUC 101702031203); SDR10P5P3 is one.
Other permits in the Falls of the Big Sioux River subwatershed (HUC 101702031203)
- 20TH STREET RECONSTRUCTION, Sioux Falls: SDR10P5TH, minor, term to 2028-10-31
- 3500 S. CLIFF AVE GRADINGE, Sioux Falls: SDR10P5TF, minor, term to 2028-10-31
- 3604 W. HOVLAND DRIVE, Sioux Falls: SDR10P5V9, minor, term to 2028-10-31
- 3D SECURITY BUILDING, Sioux Falls: SDR10K154, minor, term to 2023-03-31
- 43 POINT CAPITAL, Sioux Falls: SDR10K885
- 85TH STREET REGIONAL POND - EAST, Sioux Falls: SDR10P5RS, minor, term to 2028-10-31
- 85TH STREET STRIP MALL, Sioux Falls: SDR10K059, minor, term to 2023-03-31
- ABANDONED CITY TRAINING CENTER DEMOLITION, Sioux Falls: SDR10P5RR, minor, term to 2028-10-31
- ARCHES AT UPTOWN LLC, Sioux Falls: SD0028541
- AUGUSTANA ICE HOCKEY ARENA, Sioux Falls: SDR10K551, minor, term to 2023-03-31
What stands out
- Its term runs 3 years and 66 days, August 26, 2025 to October 31, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | FSD CONSTRUCT SNOW REMOVAL EQUIPMENT (SRE) ACCESS ROAD |
|---|---|
| Permittee | Sioux Falls Regional Airport |
| NPDES ID | SDR10P5P3 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 26, 2025 |
| Expires | October 31, 2028 |
| Agency | SDDANR |
| Address | Sioux Falls, SD 57104 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Falls of the Big Sioux River (HUC 101702031203) |
NPDES SDR10P5P3: effluent limits and exceedances
FSD CONSTRUCT SNOW REMOVAL EQUIPMENT (SRE) ACCESS ROAD (NPDES SDR10P5P3): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10P5P3: no pollutant row on file.
NPDES SDR10P5P3: inspections, violations and enforcement
NPDES SDR10P5P3 (FSD CONSTRUCT SNOW REMOVAL EQUIPMENT (SRE) ACCESS ROAD): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10P5P3
NPDES SDR10P5P3: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10P5P3
NPDES SDR10P5P3: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.