Velarion Records
Free: one email when NPDES SDR10P5NG changes. Unsubscribe any time.

NPDES SDR10P5NG · Clean Water Act

ARROWHEAD, Rapid City, SD: NPDES SDR10P5NG discharge permit, effluent exceedances, inspections, penalties

ARROWHEAD, Rapid City, South Dakota: General permit coverage SDR10P5NG, held by 3133 holdings LLC; Construction stormwater; Effective; issued July 14, 2025, term to October 31, 2028, by SDDANR.

  • February 12, 2026: Evaluation (S).
  • July 14, 2025: Failure to submit required application or NOI regarding construction stormwater discharges (ST6).

South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 887 were issued before SDR10P5NG.

Coverages issued nearest SDR10P5NG

ARROWHEAD among its neighbors

24 discharge permits are in the Canyon Lake-Rapid Creek subwatershed (HUC 101201100202); SDR10P5NG is one.

Other permits in the Canyon Lake-Rapid Creek subwatershed (HUC 101201100202)

What stands out

  • Its term runs 3 years and 109 days, July 14, 2025 to October 31, 2028.
  • Its newest dated event on file is an inspection on February 12, 2026, 215 days before EPA's file was loaded.
  • In the 365 days to September 15, 2026, it was dated 1 inspection.
  • EPA's file dates 2 events for it, from 2025 to 2026.
  • It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityARROWHEAD
Permittee3133 holdings LLC
NPDES IDSDR10P5NG
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedJuly 14, 2025
ExpiresOctober 31, 2028
AgencySDDANR
AddressRapid City, SD 57702
SubwatershedCanyon Lake-Rapid Creek (HUC 101201100202)

NPDES SDR10P5NG: effluent limits and exceedances

ARROWHEAD (NPDES SDR10P5NG): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES SDR10P5NG: no pollutant row on file.

NPDES SDR10P5NG: inspections, violations and enforcement

NPDES SDR10P5NG: 1 single-event violation

DateWhat EPA recordedAgency
July 14, 2025Failure to submit required application or NOI regarding construction stormwater dischargesST6

NPDES SDR10P5NG: 1 inspection

DateWhat EPA recordedAgency
February 12, 2026EvaluationS

NPDES SDR10P5NG (ARROWHEAD): no formal enforcement action and informal enforcement action on file.

Watch NPDES SDR10P5NG

NPDES SDR10P5NG: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES SDR10P5NG

NPDES SDR10P5NG: 0 pollutant rows, 2 dated events; ICIS-NPDES download, loaded September 15, 2026.