NPDES SDR10P5LW · Clean Water Act
FOSS FIELDS 2ND ADDITION, Sioux Falls, SD: NPDES SDR10P5LW discharge permit, effluent exceedances, inspections, penalties
FOSS FIELDS 2ND ADDITION, Sioux Falls, South Dakota: General permit coverage SDR10P5LW, held by Foss Development, LLC; Construction stormwater; Effective; issued July 14, 2025, term to October 31, 2028, by SDDANR.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 887 were issued before SDR10P5LW.
Coverages issued nearest SDR10P5LW
- 2025-07-01: CONSTRUCT PHASE 1 APRON EXPANSION, Sioux Falls: SDR10P5N8, held by Sioux Falls Regional Airport Authority
- 2025-07-02: SANITARY SEWER SYSTEM IMPROVEMENTS, Timber Lake: SDR10I044, held by Dahme Construction Co. Inc.
- 2025-07-07: SOUTHWEST BOOSTER STATION RECONSTRUCTION (2759), Rapid City: SDR10P5LV, held by City of Rapid City
- 2025-07-14: NEW PARKING LOT - SE CORNER OF 8TH ST AND JACKRABBIT, Brookings: SDR10P5KP, held by South Dakota State University (SDSU)
- 2025-07-14: DROGE ADDITION, Lennox: SDR10P5LR, held by 3D Architecture & Design, LLC
- 2025-07-14: JET HOLDINGS, Rapid City: SDR10P5N6, held by Jet Holdings LLC
- 2025-07-14: EASTSIDE ACRES, Spearfish: SDR10P5NB, held by Eastside Developers, LLC
- 2025-07-14: AUTOZONE STORE #10687, Box Elder: SDR10P5NE, held by AutoZone, Inc.
- 2025-07-14: ARROWHEAD, Rapid City: SDR10P5NG, held by 3133 holdings LLC
- 2025-07-14: PROJECT BRF 6215(00)23-2 STRUCTURE REPLACEMENT, Artesian: SDR10P5NH, held by Timmons Construction, Inc.
FOSS FIELDS 2ND ADDITION among its neighbors
97 discharge permits are in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705); SDR10P5LW is one.
Other permits in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705)
- 2025 CINDER AND LIME SLURRY PONDS CLOSURE BY REMOVAL, Sioux Falls: SDR10P5PU, minor, term to 2028-10-31
- ALIBI BAR, Sioux Falls: SDR10K703, minor, term to 2023-03-31
- ARROWHEAD PARKWAY PHASE 2B @ VETERANS PARKWAY, Sioux Falls: SDR10P5ET, minor, term to 2028-10-31
- ASPEN HARBOR ADDITION, Brandon: SDR10I075, minor, term to 2023-03-31
- BIG SIOUX RECREATION OUTLET IMPROVEMENT, Brandon: SDR10P5A4, minor, term to 2028-10-31
- BRANDON CORE AREA RECONSTRUCTION, PHASE 2B, Brandon: SDR10P5A2, minor, term to 2028-10-31
- BRANDON WTP EXPANSION, Brandon: SDR10K836, minor, term to 2023-03-31
- BRANDON, CITY OF (WTP), Brandon: SDG860074, minor, term to 2021-09-30
- BURNSFIELD ADDITION, Sioux Falls: SDR10K395, minor, term to 2023-03-31
- BURWELL SITE, Sioux Falls: SDR10K864, minor, term to 2023-03-31
What stands out
- Its term runs 3 years and 109 days, July 14, 2025 to October 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | FOSS FIELDS 2ND ADDITION |
|---|---|
| Permittee | Foss Development, LLC |
| NPDES ID | SDR10P5LW |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 14, 2025 |
| Expires | October 31, 2028 |
| Agency | SDDANR |
| Address | Sioux Falls, SD 57110 |
| Subwatershed | Cactus Hills-Big Sioux River (HUC 101702031705) |
NPDES SDR10P5LW: effluent limits and exceedances
FOSS FIELDS 2ND ADDITION (NPDES SDR10P5LW): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10P5LW: no pollutant row on file.
NPDES SDR10P5LW: inspections, violations and enforcement
NPDES SDR10P5LW (FOSS FIELDS 2ND ADDITION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10P5LW
NPDES SDR10P5LW: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10P5LW
NPDES SDR10P5LW: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.