NPDES SDR10P5PC · Clean Water Act
JERRY MOENCH WETLANDS DAM PROJECT, Alexandria, SD: NPDES SDR10P5PC discharge permit, effluent exceedances, inspections, penalties
JERRY MOENCH WETLANDS DAM PROJECT, Alexandria, South Dakota: General permit coverage SDR10P5PC, held by Ducks Unlimited, Inc.; Construction stormwater; Effective; issued September 5, 2025, term to October 31, 2028, by SDDANR.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 944 were issued before SDR10P5PC.
Coverages issued nearest SDR10P5PC
- 2025-08-28: PCN 09MD - EPA, Wanblee: SDR10I047, held by SD Department of Transportation
- 2025-09-05: CONSTRUCT PHASE 2 TERMINAL APRON EXPANSION, Sioux Falls: SDR10P5N9, held by Sioux Falls Regional Airport Authority
- 2025-09-05: KNIFE RIVER CORSON EXPANSION, Brandon: SDR10P5O3, held by Knife River South Dakota
- 2025-09-05: UHV BUILDING 6, Sioux Falls: SDR10P5OV, held by UHV Building 6, LLC
- 2025-09-05: JOE DAVIS FEEDLOT, Forestburg: SDR10P5P9, held by Joe Davis
- 2025-09-22: PROJECT DAISY DISTRIBUTION WAREHOUSE, Sioux Falls: SDR10P5J6, held by Ryan Companies US, Inc.
- 2025-09-22: DIMOCK DAM, Dimock: SDR10P5P1, held by Lidel Construction
- 2025-09-22: NEDIFI COURT, Spearfish: SDR10P5PV, held by Rogers Construction Inc
- 2025-09-25: 2025 CINDER AND LIME SLURRY PONDS CLOSURE BY REMOVAL, Sioux Falls: SDR10P5PU, held by Xcel Energy
- 2025-09-26: PRAIRIE SQUARE LLC, Brandon: SDR10P5QE, held by Raeco Builders
JERRY MOENCH WETLANDS DAM PROJECT among its neighbors
1 discharge permits are in the Bloom Creek subwatershed (HUC 101600111403); SDR10P5PC is one.
What stands out
- Its term runs 3 years and 56 days, September 5, 2025 to October 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | JERRY MOENCH WETLANDS DAM PROJECT |
|---|---|
| Permittee | Ducks Unlimited, Inc. |
| NPDES ID | SDR10P5PC |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 5, 2025 |
| Expires | October 31, 2028 |
| Agency | SDDANR |
| Address | Alexandria, SD 57311 |
| Subwatershed | Bloom Creek (HUC 101600111403) |
NPDES SDR10P5PC: effluent limits and exceedances
JERRY MOENCH WETLANDS DAM PROJECT (NPDES SDR10P5PC): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10P5PC: no pollutant row on file.
NPDES SDR10P5PC: inspections, violations and enforcement
NPDES SDR10P5PC (JERRY MOENCH WETLANDS DAM PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10P5PC
NPDES SDR10P5PC: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10P5PC
NPDES SDR10P5PC: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.