2025 CINDER AND LIME SLURRY PONDS CLOSURE BY REMOVAL, Sioux Falls, South Dakota: General permit coverage SDR10P5PU, held by Xcel Energy; Construction stormwater; Effective; issued September 25, 2025, term to October 31, 2028, by SDDANR.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 952 were issued before SDR10P5PU.
Coverages issued nearest SDR10P5PU
- 2025-09-05: JOE DAVIS FEEDLOT, Forestburg: SDR10P5P9, held by Joe Davis
- 2025-09-05: JERRY MOENCH WETLANDS DAM PROJECT, Alexandria: SDR10P5PC, held by Ducks Unlimited, Inc.
- 2025-09-22: PROJECT DAISY DISTRIBUTION WAREHOUSE, Sioux Falls: SDR10P5J6, held by Ryan Companies US, Inc.
- 2025-09-22: DIMOCK DAM, Dimock: SDR10P5P1, held by Lidel Construction
- 2025-09-22: NEDIFI COURT, Spearfish: SDR10P5PV, held by Rogers Construction Inc
- 2025-09-26: PRAIRIE SQUARE LLC, Brandon: SDR10P5QE, held by Raeco Builders
- 2025-09-30: 25007 FISHER - ON-SITE, Mobridge: NDR10I06B, held by Central Specialties, Inc.
- 2025-10-02: WINK MEADOWS MITIGATION BANK, Bruce: SDR10P5P4, held by Maccs Exacating
- 2025-10-02: IROQUOIS MAIN LIFT STATION & FORCEMAIN, Iroquois: SDR10P5PD, held by City of Iroquois
- 2025-10-02: FORMOSA - SIOUX FALLS, SD, Sioux Falls: SDR10P5PS, held by Formosa Food Company, Inc.
2025 CINDER AND LIME SLURRY PONDS CLOSURE BY REMOVAL among its neighbors
97 discharge permits are in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705); SDR10P5PU is one.
Other permits in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705)
- ALIBI BAR, Sioux Falls: SDR10K703, minor, term to 2023-03-31
- ARROWHEAD PARKWAY PHASE 2B @ VETERANS PARKWAY, Sioux Falls: SDR10P5ET, minor, term to 2028-10-31
- ASPEN HARBOR ADDITION, Brandon: SDR10I075, minor, term to 2023-03-31
- BIG SIOUX RECREATION OUTLET IMPROVEMENT, Brandon: SDR10P5A4, minor, term to 2028-10-31
- BRANDON CORE AREA RECONSTRUCTION, PHASE 2B, Brandon: SDR10P5A2, minor, term to 2028-10-31
- BRANDON WTP EXPANSION, Brandon: SDR10K836, minor, term to 2023-03-31
- BRANDON, CITY OF (WTP), Brandon: SDG860074, minor, term to 2021-09-30
- BURNSFIELD ADDITION, Sioux Falls: SDR10K395, minor, term to 2023-03-31
- BURWELL SITE, Sioux Falls: SDR10K864, minor, term to 2023-03-31
- BYRE APARTMENTS, Sioux Falls: SDR10K078, minor, term to 2023-03-31
What stands out
- Its term runs 3 years and 36 days, September 25, 2025 to October 31, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | 2025 CINDER AND LIME SLURRY PONDS CLOSURE BY REMOVAL |
|---|---|
| Permittee | Xcel Energy |
| NPDES ID | SDR10P5PU |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 25, 2025 |
| Expires | October 31, 2028 |
| Agency | SDDANR |
| Address | Sioux Falls, SD 57110 |
| Subwatershed | Cactus Hills-Big Sioux River (HUC 101702031705) |
NPDES SDR10P5PU: effluent limits and exceedances
2025 CINDER AND LIME SLURRY PONDS CLOSURE BY REMOVAL (NPDES SDR10P5PU): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10P5PU: no pollutant row on file.
NPDES SDR10P5PU: inspections, violations and enforcement
NPDES SDR10P5PU (2025 CINDER AND LIME SLURRY PONDS CLOSURE BY REMOVAL): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10P5PU
NPDES SDR10P5PU: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10P5PU
NPDES SDR10P5PU: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.