NPDES TXR1502YP · Clean Water Act
THE BARRACKS PHASE 1, San Marcos, TX: NPDES TXR1502YP discharge permit, effluent exceedances, inspections, penalties
THE BARRACKS PHASE 1, San Marcos, Texas: General permit coverage TXR1502YP, held by Jl Gray Construction, LLC; Construction stormwater; Effective; issued June 17, 2026, term to March 4, 2028; discharges to LOWER SAN MARCOS RIVER.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 21,901 were issued before TXR1502YP. Jl Gray Construction, LLC holds 56 permits in Texas.
Other permits held by Jl Gray Construction, LLC
- THE PFARM, Pflugerville: TXR1501XU, issued 2026-03-30
- THE PRESERVE AT MASON CREEK, Leander: TXR1503YP, issued 2026-06-17
- EASTON PARK SECTION 4B EAST PHASE 2 & 3, Austin: TXR1504XS, issued 2026-03-23
- THE RANCH CENTER LIFT STATION, Liberty Hill: TXR1504YP, issued 2026-06-17
- MELINA - PHASE 1 - LD, Georgetown: TXR1513WR, issued 2025-12-08
- MELINA PHASE 1, Georgetown: TXR1515WX, issued 2026-01-06
- KALI KATE, Buda: TXR1518XJ, issued 2026-02-18
- JUNIPER SPRINGS PHASE 8, Lockhart: TXR1520YU, issued 2026-07-08
- ELDORADO PHASES 7 AND 8, Liberty Hill: TXR1522XR, issued 2026-03-18
- ATLAS RANCH WWTF & OFFSITE TRAILS, Jarrell: TXR1530YB, issued 2026-04-27
Coverages issued nearest TXR1502YP
- 2026-06-16: UPRR CLARKS PARK NORTH YARD, Eagle Pass: TXR1585YO, held by CHOCTAW CONSTRUCTION SERVICES, L.L.C.
- 2026-06-16: SURGERY CENTER RAILHEAD PHASE 1, Frisco: TXR1586YO, held by Hba Design Build, LLC
- 2026-06-16: BENT TREE CC MAINTENANCE & TENNIS, Dallas: TXR1587YO, held by Hba Design Build, LLC
- 2026-06-16: THE COVES AT WINFIELD 6C, Laredo: TXR1588YO, held by Azar Services, L.L.C.
- 2026-06-17: HCFCD PROJECT ID K500-27-00-E001, Spring: TXR1501YP, held by Harris County Flood Control District
- 2026-06-17: THE PRESERVE AT MASON CREEK, Leander: TXR1503YP, held by Jl Gray Construction, LLC
- 2026-06-17: THE RANCH CENTER LIFT STATION, Liberty Hill: TXR1504YP, held by Jl Gray Construction, LLC
- 2026-06-17: TRINITY CROSSING - HOME BUILDING, Mesquite: TXR1505YP, held by Lennar Homes of Texas Land and Construction, Ltd.
- 2026-06-17: YELLOW BOX CLEBURNE POWER GENERATION, Cleburne: TXR1506YP, held by Yellow BOX Partners LLC
- 2026-06-17: COVE AT COOPER - HOME BUILDING, Lubbock: TXR1507YP, held by Lennar Homes of Texas Land and Construction, Ltd.
THE BARRACKS PHASE 1 among its neighbors
41 discharge permits are in the Redwood Cemetery-Cottonwood Creek subwatershed (HUC 121002030305); TXR1502YP is one. Its county: 410, 3 major; TXR1502YP is minor permit.
Other permits in the Redwood Cemetery-Cottonwood Creek subwatershed (HUC 121002030305)
- AMAZONCOM SERVICES SAT2, San Marcos: TXR05FD08, minor, term to 2026-08-13
- ARMED FORCES RESERVE CENTER AT SAN MARCOS TX, San Marcos: TXRNEBT43, minor, term to 2026-08-13
- CENTERPOINT RETAIL OUTLET, San Marcos: TXR1526XR, minor, term to 2028-03-04
- CORVAC COMPOSITES, San Marcos: TXR1593VF, minor, term to 2028-03-04
- CORVAC COMPOSITES, San Marcos: TXRNECD22, minor, term to 2026-08-13
- COTTONWOOD CREEK - PHASE 4 UNIT 1, San Marcos: TXR1551OE, minor, term to 2028-03-04
- COTTONWOOD CREEK SUBDIVISION, San Marcos: TXR1565TA, minor, term to 2028-03-04
- FM 1978 WATER RECLAMATION FACILITY 2, City Of San Marcos: TX0147842, minor, term to 2031-06-29
- H-E-B SAN MARCOS 03, San Marcos: TXR1596VT, minor, term to 2028-03-04
- HEB SAN MARCOS, San Marcos: TXR1587YB, minor, term to 2028-03-04
What stands out
- Its term runs 1 year and 261 days, June 17, 2026 to March 4, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | THE BARRACKS PHASE 1 |
|---|---|
| Permittee | Jl Gray Construction, LLC |
| NPDES ID | TXR1502YP |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 17, 2026 |
| Expires | March 4, 2028 |
| Address | San Marcos, TX 78666 |
| Receiving water | LOWER SAN MARCOS RIVER |
| Subwatershed | Redwood Cemetery-Cottonwood Creek (HUC 121002030305) |
| SIC | 1521 – Single-Family Housing Construction |
NPDES TXR1502YP: effluent limits and exceedances
THE BARRACKS PHASE 1 (NPDES TXR1502YP): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1502YP: no pollutant row on file.
NPDES TXR1502YP: inspections, violations and enforcement
NPDES TXR1502YP (THE BARRACKS PHASE 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1502YP
NPDES TXR1502YP: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1502YP
NPDES TXR1502YP: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.