NPDES TXR1596VT · Clean Water Act
H-E-B SAN MARCOS 03, San Marcos, TX: NPDES TXR1596VT discharge permit, effluent exceedances, inspections, penalties
H-E-B SAN MARCOS 03, San Marcos, Texas: General permit coverage TXR1596VT, held by DNT Construction, LLC; Construction stormwater; Effective; issued September 8, 2025, term to March 4, 2028; discharges to COTTONWOOD CREEK.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 15,682 were issued before TXR1596VT. DNT Construction, LLC holds 172 permits in Texas.
Other permits held by DNT Construction, LLC
- RIVERSTONE UNITS G1 G2 G3 G4 G5 G6 G7 G8 G9, San Antonio: TXR1501UY, issued 2025-06-16
- CANTERA HILLS UNIT 4 ENCLAVE, San Antonio: TXR1501XV, issued 2026-04-01
- MCCARTY COMMONS COMMERCIAL DEVELOPMENT PIC PH 2, San Marcos: TXR1501YO, issued 2026-06-12
- MORGAN HEIGHTS PHASES 5 AND 6, San Antonio: TXR1503TW, issued 2025-03-06
- RIVERSTONE ALAMO PARKWAY PH II & GALM ROAD PH IV, San Antonio: TXR1503UY, issued 2025-06-16
- REGENT PARK UNIT 9, Boerne: TXR1503VQ, issued 2025-08-21
- KALLISON RANCH 215 PHASE 3 UNIT 13C, San Antonio: TXR1503XG, issued 2026-02-06
- LANGDON UNIT 11 12 13, San Antonio: TXR1504QR, issued 2024-04-24
- REGENT PARK UNIT 7, Boerne: TXR1504VQ, issued 2025-08-21
- ELLWOOD PHASE 2 DETENTION, Iowa Colony: TXR1504WD, issued 2025-10-14
Coverages issued nearest TXR1596VT
- 2025-09-08: ALEDO ROAD INFRASTRUCTURE, Fort Worth: TXR1590VT, held by Acadia Services, LLC
- 2025-09-08: BLOSSOM RANCH - UNIT 1B, San Antonio: TXR1591VT, held by DNT Construction, LLC
- 2025-09-08: BRE PHASE 2 COLLECTOR, San Antonio: TXR1593VT, held by DNT Construction, LLC
- 2025-09-08: EAST INDUSTRIAL PARKWAY PHASE 2, New Caney: TXR1594VT, held by Principal Services, Ltd.
- 2025-09-08: 10021 KENDALL CYN, San Antonio: TXR1595VT, held by Shuvra Kanta Paladhi
- 2025-09-08: BRIDGELAND CREEKLAND VILLAGE SECTION 17, Cypress: TXR1598VT, held by Principal Services, Ltd.
- 2025-09-09: SUNSET OAKS SECTION VI PHASE 1A, Maxwell: TXR1530VU, held by KB Home Lone Star Inc.
- 2025-09-09: URBAN AIR - DENTON, Denton: TXR1531VU, held by Hba Design Build, LLC
- 2025-09-09: OAK RIDGE NORTH PLAZA, Oak Ridge North: TXR1532VU, held by Dso Construction, LLC
- 2025-09-09: PROPOSED 50-AC HENDRICKS TRACT - PAVING & TURN LAN, Porter: TXR1533VU, held by Scythe Construction, LLC
H-E-B SAN MARCOS 03 among its neighbors
41 discharge permits are in the Redwood Cemetery-Cottonwood Creek subwatershed (HUC 121002030305); TXR1596VT is one. Its county: 410, 3 major; TXR1596VT is minor permit.
Other permits in the Redwood Cemetery-Cottonwood Creek subwatershed (HUC 121002030305)
- AMAZONCOM SERVICES SAT2, San Marcos: TXR05FD08, minor, term to 2026-08-13
- ARMED FORCES RESERVE CENTER AT SAN MARCOS TX, San Marcos: TXRNEBT43, minor, term to 2026-08-13
- CENTERPOINT RETAIL OUTLET, San Marcos: TXR1526XR, minor, term to 2028-03-04
- CORVAC COMPOSITES, San Marcos: TXR1593VF, minor, term to 2028-03-04
- CORVAC COMPOSITES, San Marcos: TXRNECD22, minor, term to 2026-08-13
- COTTONWOOD CREEK - PHASE 4 UNIT 1, San Marcos: TXR1551OE, minor, term to 2028-03-04
- COTTONWOOD CREEK SUBDIVISION, San Marcos: TXR1565TA, minor, term to 2028-03-04
- FM 1978 WATER RECLAMATION FACILITY 2, City Of San Marcos: TX0147842, minor, term to 2031-06-29
- HEB SAN MARCOS, San Marcos: TXR1587YB, minor, term to 2028-03-04
- KISSING TREE AKA PASO ROBLES PHS 3E 6C AND 8A, San Marcos: TXR1549WO, minor, term to 2028-03-04
What stands out
- Its term runs 2 years and 178 days, September 8, 2025 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | H-E-B SAN MARCOS 03 |
|---|---|
| Permittee | DNT Construction, LLC |
| NPDES ID | TXR1596VT |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 8, 2025 |
| Expires | March 4, 2028 |
| Address | San Marcos, TX 78666 |
| Receiving water | COTTONWOOD CREEK |
| Subwatershed | Redwood Cemetery-Cottonwood Creek (HUC 121002030305) |
NPDES TXR1596VT: effluent limits and exceedances
H-E-B SAN MARCOS 03 (NPDES TXR1596VT): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1596VT: no pollutant row on file.
NPDES TXR1596VT: inspections, violations and enforcement
NPDES TXR1596VT (H-E-B SAN MARCOS 03): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1596VT
NPDES TXR1596VT: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1596VT
NPDES TXR1596VT: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.