NPDES TXR1505OI · Clean Water Act
AEP MULBERRY CREEK SUBSTATION, Abilene, TX: NPDES TXR1505OI discharge permit, effluent exceedances, inspections, penalties
AEP MULBERRY CREEK SUBSTATION, Abilene, Texas: General permit coverage TXR1505OI, held by Beta Engineering, LLC; Construction stormwater; Effective; issued September 12, 2023, term to March 4, 2028; discharges to CLEAR FORK BRAZOS RIVER.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 3,862 were issued before TXR1505OI. Beta Engineering, LLC holds 3 permits in Texas.
Other permits held by Beta Engineering, LLC
- MARVIN SUBSTATION, El Paso: TXR1582YO, issued 2026-06-16
- AEP MULBERRY CREEK SUBSTATION, Abilene: TXR1594UY, issued 2025-06-19
Coverages issued nearest TXR1505OI
- 2023-09-11: LOT 7 & 18 BLK A INFRASTRUCTURE, Frisco: TXR1597OH, held by FSWC, LP
- 2023-09-11: PAINTED TREE LAKESIDE, Mckinney: TXR1598OH, held by Tri Pointe Homes Dfw, LLC
- 2023-09-12: CARDINAL HILLS - LAND DEVELOPMENT, Dallas: TXR1501OI, held by Forestar (USA) Real Estate Group Inc.
- 2023-09-12: PALOMA, Hockley: TXR1502OI, held by Century Land Holdings of Texas, LLC
- 2023-09-12: MEADOWS AT TELGE SECTION 1, Cypress: TXR1503OI, held by Gonzalez Construction Enterprise Inc.
- 2023-09-12: YUKON COMMERCIAL WATERLINE, Odessa: TXR1507OI, held by Leeco Properties, Inc.
- 2023-09-12: CORNERSTONE CHURCH, San Antonio: TXR1515OI, held by Stoddard Enterprise, LLC
- 2023-09-12: THE LANDING MEADOWS & THE LANDING AT NEW CANEY, New Caney: TXR1517OI, held by DaCo Paving, Inc.
- 2023-09-12: TXDOT PHR CSJ 1428-01-027, Mercedes Tx: TXR1519OI, held by Asago, LLC
- 2023-09-12: LINE E REPLACEMENT, Gainesville: TXR1522OI, held by Atmos Energy Corporation
AEP MULBERRY CREEK SUBSTATION among its neighbors
8 discharge permits are in the Lower Mulberry Creek subwatershed (HUC 120601020505); TXR1505OI is one. Its county: 30, 1 major; TXR1505OI is minor permit.
Other permits in the Lower Mulberry Creek subwatershed (HUC 120601020505)
- ABILENE ENVIRONMENTAL LANDFILL, Abilene: TXR05FI78, minor, term to 2026-08-13
- ABILENE NW TO MULBERRY CREEK, Abilene: TXR1570YY, minor, term to 2028-03-04
- AEP MULBERRY CREEK SUBSTATION, Abilene: TXR1594UY, minor, term to 2028-03-04
- CRUSOE ENERGY WA CONNECT, Abilene: TXR1596UI, minor, term to 2028-03-04
- DOG STAR SOLAR ITC, Tye: TXR1541YR, minor, term to 2028-03-04
- LANCIUM ABIPK, Abilene: TXR1566RP, minor, term to 2028-03-04
- MULTIPLE LOTS IN PLAINVIEW ESTATES SUBDIVISION, Hawley: TXR1557IP, minor, term to 2023-03-04
What stands out
- Its term runs 4 years and 174 days, September 12, 2023 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | AEP MULBERRY CREEK SUBSTATION |
|---|---|
| Permittee | Beta Engineering, LLC |
| NPDES ID | TXR1505OI |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 12, 2023 |
| Expires | March 4, 2028 |
| Address | Abilene, TX 79601 |
| Receiving water | CLEAR FORK BRAZOS RIVER |
| Subwatershed | Lower Mulberry Creek (HUC 120601020505) |
NPDES TXR1505OI: effluent limits and exceedances
AEP MULBERRY CREEK SUBSTATION (NPDES TXR1505OI): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1505OI: no pollutant row on file.
NPDES TXR1505OI: inspections, violations and enforcement
NPDES TXR1505OI (AEP MULBERRY CREEK SUBSTATION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1505OI
NPDES TXR1505OI: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1505OI
NPDES TXR1505OI: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.