NPDES TXR1570YY · Clean Water Act
ABILENE NW TO MULBERRY CREEK, Abilene, TX: NPDES TXR1570YY discharge permit, effluent exceedances, inspections, penalties
ABILENE NW TO MULBERRY CREEK, Abilene, Texas: General permit coverage TXR1570YY, held by AEP Texas Inc.; Construction stormwater; Effective; issued July 27, 2026, term to March 4, 2028; discharges to CLEAR FORK BRAZOS RIVER.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 22,826 were issued before TXR1570YY. AEP Texas Inc. holds 50 permits in Texas.
Other permits held by AEP Texas Inc.
- LYTLE SUBSTATION, Natalia: TXR1503VP, issued 2025-08-19
- AEP CRUCE TO REFORZAR TRANSMISSION LINE CONSTRUCT, Falfurrias: TXR1504VH, issued 2025-07-21
- REFORZAR SUBSTATION CONSTRUCTION, Falfurrias: TXR1507PJ, issued 2023-12-19
- OKLAUNION PSO SUBSTATION PROJECT, Oklaunion: TXR1507QQ, issued 2024-04-22
- TANGO TO PAWNEE 345KV T-LINE REBUILD, Mineral: TXR1509XG, issued 2026-02-06
- ZOISITE SUBSTATION AND LAYDOWN YARD, Palacios: TXR1509YI, issued 2026-05-20
- HECKER TO RESNIK T-LINE REBUILD PROJECT, Gregory: TXR1510YT, issued 2026-07-02
- DACOSTA TO CANGREJO T-LINE REBUILD PROJECT, Dacosta: TXR1514WO, issued 2025-11-24
- AEP - CRUCE TO CENIZO TRANSMISSION LINE CONSTRUCT, Hebbronville: TXR1520VH, issued 2025-07-21
- AEP GOHLKE TO JOSLIN TRANSMISSION LINE REBUILD, Point Comfort: TXR1520XQ, issued 2026-03-13
Coverages issued nearest TXR1570YY
- 2026-07-27: 1821 JUBILEE LANE, Southlake: TXR1565YY, held by Calais Custom Homes, LLC
- 2026-07-27: EDWARD JONES BUILDING, Copperas Cove: TXR1566YY, held by Dmd Construction LLC
- 2026-07-27: CLARENDON TO GREENBELT, Clarendon: TXR1567YY, held by AEP Texas Inc.
- 2026-07-27: MAJESTIC SANDS UNIT ONE, El Paso: TXR1568YY, held by Tri-State Ventures DBA Carefree Homes
- 2026-07-27: WACO GATEWAY, Waco: TXR1569YY, held by LOCKHART EXCAVATION LLC
- 2026-07-27: QTS FTW1 DC1 EXPANSION 18MW, Fort Worth: TXR1571YY, held by AP Gulf States, Inc.
- 2026-07-27: CROSS CREEK WEST - HOME BUILDING, Fulshear: TXR1572YY, held by Dfh Coventry, LLC
- 2026-07-27: SANTA FE PARK, Lubbock: TXR1573YY, held by Arco National Holdings, Inc.
- 2026-07-27: PINE RANCH, Lindale: TXR1574YY, held by Pine Ranch Land Investors LLC
- 2026-07-27: 2121-06-062 HUDSPETH SAFETY REST AREA, Fort Hancock: TXR1575YY, held by Ragle, Inc.
ABILENE NW TO MULBERRY CREEK among its neighbors
8 discharge permits are in the Lower Mulberry Creek subwatershed (HUC 120601020505); TXR1570YY is one. Its county: 191, 1 major; TXR1570YY is minor permit.
Other permits in the Lower Mulberry Creek subwatershed (HUC 120601020505)
- ABILENE ENVIRONMENTAL LANDFILL, Abilene: TXR05FI78, minor, term to 2026-08-13
- AEP MULBERRY CREEK SUBSTATION, Abilene: TXR1505OI, minor, term to 2028-03-04
- AEP MULBERRY CREEK SUBSTATION, Abilene: TXR1594UY, minor, term to 2028-03-04
- CRUSOE ENERGY WA CONNECT, Abilene: TXR1596UI, minor, term to 2028-03-04
- DOG STAR SOLAR ITC, Tye: TXR1541YR, minor, term to 2028-03-04
- LANCIUM ABIPK, Abilene: TXR1566RP, minor, term to 2028-03-04
- MULTIPLE LOTS IN PLAINVIEW ESTATES SUBDIVISION, Hawley: TXR1557IP, minor, term to 2023-03-04
What stands out
- Its term runs 1 year and 221 days, July 27, 2026 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ABILENE NW TO MULBERRY CREEK |
|---|---|
| Permittee | AEP Texas Inc. |
| NPDES ID | TXR1570YY |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 27, 2026 |
| Expires | March 4, 2028 |
| Address | Abilene, TX 79601 |
| Receiving water | CLEAR FORK BRAZOS RIVER |
| Subwatershed | Lower Mulberry Creek (HUC 120601020505) |
NPDES TXR1570YY: effluent limits and exceedances
ABILENE NW TO MULBERRY CREEK (NPDES TXR1570YY): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1570YY: no pollutant row on file.
NPDES TXR1570YY: inspections, violations and enforcement
NPDES TXR1570YY (ABILENE NW TO MULBERRY CREEK): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1570YY
NPDES TXR1570YY: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1570YY
NPDES TXR1570YY: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.