NPDES TXR1505XT · Clean Water Act
N DIAMONDHEAD BOULEVARD PHASE 2 & NEWPORT POINTE SECTION 6, Crosby, TX: NPDES TXR1505XT discharge permit, effluent exceedances, inspections, penalties
N DIAMONDHEAD BOULEVARD PHASE 2 & NEWPORT POINTE SECTION 6, Crosby, Texas: General permit coverage TXR1505XT, held by CrosTex Construction, Inc.; Construction stormwater; Effective; issued March 25, 2026, term to March 4, 2028; discharges to GUM GULLY.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 19,838 were issued before TXR1505XT. CrosTex Construction, Inc. holds 26 permits in Texas.
Other permits held by CrosTex Construction, Inc.
- THE HIGHLANDS SECTION 17, Porter: TXR1502SY, issued 2024-12-05
- ANNISTON SEC 13 & SEC 14, Houston: TXR1504PW, issued 2024-02-08
- HOCKLEY MEADOWS SECTION 3, Hockley: TXR1519WS, issued 2025-12-11
- DUMONT PLACE, Houston: TXR1520ZI, issued 2026-09-02
- COBBLESTONE SECTION 4, Texas City: TXR1521YF, issued 2026-05-11
- LONGLEAF CLEARING & GRUBBING, Magnolia: TXR1525YZ, issued 2026-07-28
- HERITAGE BEND TBPH SECTION 1, Fulshear: TXR1529YS, issued 2026-06-30
- WOODTRACE BOULEVARD PHASE 3, Magnolia: TXR1529ZB, issued 2026-08-05
- MIRROR LAKE CIRCLE PHASE 6, Porter: TXR1531VP, issued 2025-08-20
- SIENNA PARKWAY PHASE 7, Missouri City: TXR1531YS, issued 2026-06-30
Coverages issued nearest TXR1505XT
- 2026-03-24: MCDONALDS 042-3705, Pflugerville: TXR1575XS, held by The Struthoff Company, Inc.
- 2026-03-25: EDGEWOOD BUILDING PROGRAM PHASE 2, Edgewood: TXR1501XT, held by Berry & Clay Construction
- 2026-03-25: WILLIAMS BRANCH SECTION 1, Conroe: TXR1502XT, held by Beyer Construction, LLC
- 2026-03-25: FIRESONG SECTION 1, Montgomery: TXR1503XT, held by Beyer Construction, LLC
- 2026-03-25: FIRESONG STREET DEDICATION AND MODEL HOME, Montgomery: TXR1504XT, held by Beyer Construction, LLC
- 2026-03-25: MONTE CRISTO SUBDIVISION, Cibolo: TXR1506XT, held by Statewide Asset Services, LLC
- 2026-03-25: TTS ZARZAMORA, San Antonio: TXR1507XT, held by Statewide Asset Services, LLC
- 2026-03-25: SEAGOVILLE PRE-K THROUGH 8TH GRADE, Dallas: TXR1508XT, held by Phillips May
- 2026-03-25: MIDWAY BLVDMISSION DR, Odessa: TXR1509XT, held by Jones Bros. Dirt & Paving Contractors, Inc.
- 2026-03-25: GREENS PRAIRIE RESERVE PHS 604, College Station: TXR1510XT, held by Ccb Construction And Associates, Inc.
N DIAMONDHEAD BOULEVARD PHASE 2 & NEWPORT POINTE SECTION 6 among its neighbors
108 discharge permits are in the Jackson Bayou-San Jacinto River subwatershed (HUC 120401040704); TXR1505XT is one. Its county: 4,455, 195 major; TXR1505XT is minor permit.
Other permits in the Jackson Bayou-San Jacinto River subwatershed (HUC 120401040704)
- ALTIVIA OXIDE CHEMICALS PLANT, Crosby: TX0095559, minor, term to 2023-09-18
- AMERICAN STEEL PIPE FABRICATION, Crosby: TXR05GM94, minor, term to 2026-08-13
- ASPHALT PACKAGE 2023 - 2 - 23103MF2WQ01, Crosby: TXR1582OF, minor, term to 2028-03-04
- ASPHALT PACKAGE 2023 - 2 - 23103MF2WQ01, Crosby: TXR1594OE, minor, term to 2028-03-04
- BARRET CROSSING SUBDIVISION, Crosby: TXR1536YS, minor, term to 2028-03-04
- BARRET STREET DEDICATION PAVING BRIDGE, Crosby: TXR1564NF, minor, term to 2028-03-04
- BARRETT CROSSING AT SWEETGRASS VILLAGE - HOME BUILDING, Crosby: TXR1549PO, minor, term to 2028-03-04
- BARRETT CROSSING LIFT STATION, Crobsy: TXR1567MG, minor, term to 2028-03-04
- BARRETT CROSSING STREET DEDICATION SEC 1, Crosby: TXR1582LZ, minor, term to 2028-03-04
- BARRETT STATION PHASE 1, Crosby: TXR1516PA, minor, term to 2028-03-04
What stands out
- Its term runs 1 year and 345 days, March 25, 2026 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | N DIAMONDHEAD BOULEVARD PHASE 2 & NEWPORT POINTE SECTION 6 |
|---|---|
| Permittee | CrosTex Construction, Inc. |
| NPDES ID | TXR1505XT |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 25, 2026 |
| Expires | March 4, 2028 |
| Address | Crosby, TX 77532 |
| Receiving water | GUM GULLY |
| Subwatershed | Jackson Bayou-San Jacinto River (HUC 120401040704) |
NPDES TXR1505XT: effluent limits and exceedances
N DIAMONDHEAD BOULEVARD PHASE 2 & NEWPORT POINTE SECTION 6 (NPDES TXR1505XT): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1505XT: no pollutant row on file.
NPDES TXR1505XT: inspections, violations and enforcement
NPDES TXR1505XT (N DIAMONDHEAD BOULEVARD PHASE 2 & NEWPORT POINTE SECTION 6): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1505XT
NPDES TXR1505XT: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1505XT
NPDES TXR1505XT: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.