SWIFTEX TO SIM GIDEON OVERHAUL PROJECT, Bastrop, Texas: General permit coverage TXR1510RH, held by Irby Construction Company; Construction stormwater; Effective; issued June 25, 2024, term to March 4, 2028; discharges to PINEY CREEK; Other Electric Power Generation [2007].
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 7,866 were issued before TXR1510RH. Irby Construction Company holds 32 permits in Texas.
Other permits held by Irby Construction Company
- T786T787 NORTH MCCAMEY TO SAND LAKE TRANSMISSION LINE, Mccamey: TXR1509TI, issued 2025-01-17
- T597 RIVERY TO GEORGETOWN, Georgetown: TXR1513ZF, issued 2026-08-20
- BUCHANAN CTEC TO KINGSLAND 1 T-291 69KV TL OVERHAUL, Kingsland: TXR1514XH, issued 2026-02-11
- KINGSLAND1 TO SANDY CREEK TL OH, Kingsland: TXR1515VJ, issued 2025-07-28
- ALTAIR TO GARWOOD TL OH T546, Garwood: TXR1516NU, issued 2023-07-28
- T788T789 NORTH MCCAMEY TO BEARKAT TRANSMISSION LINE, Mccamey: TXR1516TI, issued 2025-01-17
- MENDOZA SUBSTATION, Lockhart: TXR1522ZG, issued 2026-08-25
- BUCHANAN CTEC TO BLUFFTON CTEC TL OH, Buchanan Dam: TXR1530ZE, issued 2026-08-18
- T497 LAKEWAY TO MARBLE FALLS TL UPGRADE, Spicewood: TXR1531NK, issued 2023-06-29
- SAN MARCOS TO STRAHAN T230 AND REDWOOD TO SAN MARCOS T200, San Marcos: TXR1534RV, issued 2024-08-16
Coverages issued nearest TXR1510RH
- 2024-06-25: TIOGA PIPE & SUPPLY EXPANSION, Houston: TXR1501RH, held by CRB CONSTRUCTION, INC.
- 2024-06-25: FGU WRRF 2 - PHASE 1, San Antonio: TXR1502RH, held by Cbu Management, LLC
- 2024-06-25: ESTATES OF TEXAS GRAND RANCH, Huntsville: TXR1504RH, held by Design Tech Homes, Ltd.
- 2024-06-25: DUM 1727-02-024, Etter: TXR1506RH, held by Texas Department of Transportation
- 2024-06-25: LUXE LOCKER AUSTIN, Austin: TXR1507RH, held by S.B.C.C., Inc.
- 2024-06-25: SENOX ADDITION, Mesquite: TXR1511RH, held by Raymond Construction Co., Inc.
- 2024-06-25: CANYON CREEK, Granbury: TXR1512RH, held by Foxhall Homes LLC
- 2024-06-25: LOGANS RANCH SUBDIVISION, Harlingen: TXR1513RH, held by Ray Garza
- 2024-06-25: MCDONALDS 042-3366, Fort Worth: TXR1514RH, held by Stovall Construction, INC.
- 2024-06-25: PROSE AVIATOR, Mckinney: TXR1515RH, held by Alliance Residential Builders, LP
SWIFTEX TO SIM GIDEON OVERHAUL PROJECT among its neighbors
11 discharge permits are in the Spicer Creek-Piney Creek subwatershed (HUC 120903010205); TXR1510RH is one. Its county: 222, 5 major; TXR1510RH is minor permit.
Other permits in the Spicer Creek-Piney Creek subwatershed (HUC 120903010205)
- A PLACE TO CALL HOME RV PARK, Bastrop: TXR1507UL, minor, term to 2028-03-04
- BASTROP HIGH SCHOOL ADDITIONS & RENOVATION, Bastrop: TXR1513UT, minor, term to 2028-03-04
- CAMP SWIFT IRON REMOVAL WTP, Bastrop: TX0119946, minor, term to 2019-09-01
- CAMP SWIFT SUBDIVISION, Bastrop: TXR1587SZ, minor, term to 2028-03-04
- LOST PINES 1 POWER PLANT, Bastrop: TX0119661, minor, term to 2024-12-06
- SAYERS RANCH WWTP, Bastrop: TX0148288
- SAYERS RANCH WWTP, Bastrop: TX0148997
- SIM GIDEON POWER PLANT, Bastrop: TX0064378, major, term to 2019-09-01
- SIMSBORO AQUIFER WTP WELL FIELD AND TRANSMISSION FACILITIES, Bastrop: TXR1589MV, minor, term to 2028-03-04
- SWIFTEX TO SIM GIDEON OVERHAUL PROJECT, Bastrop: TXR1517RG, minor, term to 2028-03-04
What stands out
- Its term runs 3 years and 253 days, June 25, 2024 to March 4, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SWIFTEX TO SIM GIDEON OVERHAUL PROJECT |
|---|---|
| Permittee | Irby Construction Company |
| NPDES ID | TXR1510RH |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 25, 2024 |
| Expires | March 4, 2028 |
| Address | Bastrop, TX 78602 |
| Receiving water | PINEY CREEK |
| Subwatershed | Spicer Creek-Piney Creek (HUC 120903010205) |
| NAICS | 221119 – Other Electric Power Generation [2007] |
| SIC | 4911 – Electric Services |
NPDES TXR1510RH: effluent limits and exceedances
SWIFTEX TO SIM GIDEON OVERHAUL PROJECT (NPDES TXR1510RH): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1510RH: no pollutant row on file.
NPDES TXR1510RH: inspections, violations and enforcement
NPDES TXR1510RH (SWIFTEX TO SIM GIDEON OVERHAUL PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1510RH
NPDES TXR1510RH: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1510RH
NPDES TXR1510RH: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.