NPDES TXR1517RG · Clean Water Act
SWIFTEX TO SIM GIDEON OVERHAUL PROJECT, Bastrop, TX: NPDES TXR1517RG discharge permit, effluent exceedances, inspections, penalties
SWIFTEX TO SIM GIDEON OVERHAUL PROJECT, Bastrop, Texas: General permit coverage TXR1517RG, held by LCRA Transmission Services Corporation; Construction stormwater; Effective; issued June 21, 2024, term to March 4, 2028; discharges to PINEY CREEK.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 7,831 were issued before TXR1517RG. LCRA Transmission Services Corporation holds 31 permits in Texas.
Other permits held by LCRA Transmission Services Corporation
- HOWARD LN TO WELLS BRANCH T387 TRANSMISSION LINE UPGRADE, Austin: TXR1514YW, issued 2026-07-16
- HUECO SPRINGS SUBTL235765 PROJECT, New Braunfels: TXR1515WA, issued 2025-10-01
- CALDWELL SUBSTATION, Caldwell: TXR1520VO, issued 2025-08-18
- BUCHANAN CTEC TO KINGSLAND 1 T-291 69KV TL OVERHAUL, Kingsland: TXR1526XF, issued 2026-02-04
- BUCHANAN CTEC TO BLUFFTON CTEC TL OH, Buchanan Dam: TXR1529WT, issued 2025-12-16
- HAYS ENERGY TO KENDALL TL UPGRADE SEGMENT 4, Boerne: TXR1532PI, issued 2023-12-18
- HE TO KENDALL SEGMENT 3 TL UPGRADE, Bulverde: TXR1533NU, issued 2023-07-30
- HENNE TO KOHLENBERG TL ADDITION, New Braunfels: TXR1535VC, issued 2025-07-02
- KINGSLAND1 TO SANDY CREEK TL OH, Kingsland: TXR1536VC, issued 2025-07-02
- LIMMER SUBSTATION, Hutto: TXR1539RK, issued 2024-07-10
Coverages issued nearest TXR1517RG
- 2024-06-21: TXDOT - PAR - CSJ 0081-10-052, Whitesboro: TXR1510RG, held by Overland Corporation
- 2024-06-21: PAVING OPERATIONS FOR MEADOW RIDGE ESTATES, Josephine: TXR1511RG, held by Chris Harp Construction Limited Liability Company
- 2024-06-21: FULSHEAR LAKES LAKESIDE PARK - HOME BUILDING, Fulshear: TXR1514RG, held by Perry Homes, LLC
- 2024-06-21: PARK TRAILS, Forney: TXR1515RG, held by Grand Texas Homes, Inc.
- 2024-06-21: CENTER AT PALM VALLEY SITE DEVELOPMENT IMPROVEMENTS, Round Rock: TXR1516RG, held by Gulf Rc Ventures LLC
- 2024-06-21: CONCRETE BATCH PLANT SUPPORTING MEADOWS PH 1 4388P, Ponder: TXR1518RG, held by RPM xConstruction, LLC
- 2024-06-21: CONCRETE BATCH PLANT SUPPORTING MCKINNEY CRUSHER, Mckinney: TXR1519RG, held by RPM xConstruction, LLC
- 2024-06-21: HEATH HORIZON MOB, Heath: TXR1521RG, held by Triton Gc, LLC
- 2024-06-21: WATER & WASTE WATER IMPROVEMENTS FOR WINDING TRAIL WEST, Austin: TXR1524RG, held by Wpm Construction Services, Inc.
- 2024-06-21: EAST BRAKER LANE MULTI-FAMILY PROJECT, Austin: TXR1527RG, held by Shreve Land Constructors, LLC
SWIFTEX TO SIM GIDEON OVERHAUL PROJECT among its neighbors
11 discharge permits are in the Spicer Creek-Piney Creek subwatershed (HUC 120903010205); TXR1517RG is one. Its county: 222, 5 major; TXR1517RG is minor permit.
Other permits in the Spicer Creek-Piney Creek subwatershed (HUC 120903010205)
- A PLACE TO CALL HOME RV PARK, Bastrop: TXR1507UL, minor, term to 2028-03-04
- BASTROP HIGH SCHOOL ADDITIONS & RENOVATION, Bastrop: TXR1513UT, minor, term to 2028-03-04
- CAMP SWIFT IRON REMOVAL WTP, Bastrop: TX0119946, minor, term to 2019-09-01
- CAMP SWIFT SUBDIVISION, Bastrop: TXR1587SZ, minor, term to 2028-03-04
- LOST PINES 1 POWER PLANT, Bastrop: TX0119661, minor, term to 2024-12-06
- SAYERS RANCH WWTP, Bastrop: TX0148288
- SAYERS RANCH WWTP, Bastrop: TX0148997
- SIM GIDEON POWER PLANT, Bastrop: TX0064378, major, term to 2019-09-01
- SIMSBORO AQUIFER WTP WELL FIELD AND TRANSMISSION FACILITIES, Bastrop: TXR1589MV, minor, term to 2028-03-04
- SWIFTEX TO SIM GIDEON OVERHAUL PROJECT, Bastrop: TXR1510RH, minor, term to 2028-03-04
What stands out
- Its term runs 3 years and 257 days, June 21, 2024 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SWIFTEX TO SIM GIDEON OVERHAUL PROJECT |
|---|---|
| Permittee | LCRA Transmission Services Corporation |
| NPDES ID | TXR1517RG |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 21, 2024 |
| Expires | March 4, 2028 |
| Address | Bastrop, TX 78602 |
| Receiving water | PINEY CREEK |
| Subwatershed | Spicer Creek-Piney Creek (HUC 120903010205) |
NPDES TXR1517RG: effluent limits and exceedances
SWIFTEX TO SIM GIDEON OVERHAUL PROJECT (NPDES TXR1517RG): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1517RG: no pollutant row on file.
NPDES TXR1517RG: inspections, violations and enforcement
NPDES TXR1517RG (SWIFTEX TO SIM GIDEON OVERHAUL PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1517RG
NPDES TXR1517RG: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1517RG
NPDES TXR1517RG: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.