NPDES TXR1518VG · Clean Water Act
SILA MAIN APPROACH PHASES 1-5, Houston, TX: NPDES TXR1518VG discharge permit, effluent exceedances, inspections, penalties
SILA MAIN APPROACH PHASES 1-5, Houston, Texas: General permit coverage TXR1518VG, held by CenterPoint Energy Resources Corp.; Construction stormwater; Effective; issued July 17, 2025, term to March 4, 2028; discharges to LUCE BAYOU.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 14,616 were issued before TXR1518VG. CenterPoint Energy Resources Corp. holds 12 permits in Texas.
Other permits held by CenterPoint Energy Resources Corp.
- CONROE 12-INCH RELIABILITY PHASES 1B-3, Conroe: TXR1504OW, issued 2023-10-30
- FM 2493 FLINT-BULLARD PHASES 1 AND 2, Bullard: TXR1516OP, issued 2023-10-05
- LEXINGTON PHASE 1, Missouri City: TXR1518TU, issued 2025-02-27
- EMBERLY MAIN APPROACH, Beasley: TXR1525PZ, issued 2024-02-20
- SOUTHWEST CROSSING AND WESTBURY LATERAL, Houston: TXR1538MX, issued 2023-05-24
- BRIDGELAND PHASE 6, Hockley: TXR1543UX, issued 2025-06-13
- SUMMERWOOD TIE-IN PHASES 1 & 2 AND 11700 COMMON DOCK DRIVE, Houston: TXR1545RE, issued 2024-06-17
- LEXINGTON PHASE 2 & ALLUM, Houston: TXR1553WX, issued 2026-01-07
- US 59 WIDENING LAREDO PHASES 1-4, Laredo: TXR1558MQ, issued 2023-05-01
- FM 3083 PHASES 1-5, Conroe: TXR1559MO, issued 2023-04-24
Coverages issued nearest TXR1518VG
- 2025-07-17: HEB ARSENAL ELECTRICAL UPGRADE, San Antonio: TXR1513VG, held by Joeris General Contractors, LLC
- 2025-07-17: HOT WELLS MISSION REACH WATER MAIN REPLACEMENT, Texas: TXR1514VG, held by Pesado Construction Company
- 2025-07-17: VAN ZANDT MIXED USE, Fort Worth: TXR1515VG, held by Van Zandt Apartments, LLC
- 2025-07-17: HCFCD PROJECT ID E500-25-00-E002, Houston: TXR1516VG, held by Harris County Flood Control District
- 2025-07-17: FALCON SAGINAW DISTRIBUTION CENTER, Saginaw: TXR1517VG, held by Pm Fcd Saginaw, L.L.C.
- 2025-07-17: ARBOR OAKS STORMWATER DETENTION BASIN, Houston: TXR1520VG, held by Sprint Sand and Clay, LLC
- 2025-07-17: PAN & COFFEE BOERNE, Boerne: TXR1521VG, held by Quinn Enterprises LLC
- 2025-07-17: TXDOT BRY CSJ 0648-01-036, Mumford: TXR1522VG, held by Texas Department of Transportation
- 2025-07-17: BOARDWALK ESTATES, College Station: TXR1524VG, held by Lintz Construction, LLC
- 2025-07-17: BAYSIDE DRIVEWAY MODIFICATIONS, League City: TXR1525VG, held by Generocity Services Inc.
SILA MAIN APPROACH PHASES 1-5 among its neighbors
55 discharge permits are in the Luce Bayou-Frontal Lake Houston subwatershed (HUC 120401030205); TXR1518VG is one. Its county: 4,455, 195 major; TXR1518VG is minor permit.
Other permits in the Luce Bayou-Frontal Lake Houston subwatershed (HUC 120401030205)
- BLEU RIVIERA DR STREET DEDICATION SEC 2 W D & PAVING, Huffman: TXR1537TH, minor, term to 2028-03-04
- COLONY RIDGE PUGMILL 1, Cleveland: TXR1597PJ, minor, term to 2028-03-04
- DS CONCRETE WORLD, Cleveland: TXR05GN81, minor, term to 2026-08-13
- HC MUD NO 514 WWTP AND LIFT STATION, Huffman: TXR1542QT, minor, term to 2028-03-04
- HMSS PLANT - HUFFMAN, Huffman: TXR05GU18, minor, term to 2026-08-13
- KINGLAND CENTRAL WASTEWATER TREATMENT PLANT, Plum Grove: TX0145025, minor, term to 2029-09-09
- LIBERTY COUNTY MUD NO 6 WWTP NO 1, Huffman: TX0147800
- LIBERTY COUNTY MUD NO 6 WWTP NO 2, Huffman: TX0147818
- LIBERTY COUNTY UTILITIES WWTP NO 1, Plum Grove: TX0141062, minor, term to 2026-11-10
- LIBERTY COUNTY UTILITIES WWTP NO 3, Plum Grove: TX0144339, minor, term to 2028-10-30
What stands out
- Its term runs 2 years and 231 days, July 17, 2025 to March 4, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SILA MAIN APPROACH PHASES 1-5 |
|---|---|
| Permittee | CenterPoint Energy Resources Corp. |
| NPDES ID | TXR1518VG |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 17, 2025 |
| Expires | March 4, 2028 |
| Address | Houston, TX 77336 |
| Receiving water | LUCE BAYOU |
| Subwatershed | Luce Bayou-Frontal Lake Houston (HUC 120401030205) |
| SIC | 4924 – Natural Gas Distribution |
NPDES TXR1518VG: effluent limits and exceedances
SILA MAIN APPROACH PHASES 1-5 (NPDES TXR1518VG): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1518VG: no pollutant row on file.
NPDES TXR1518VG: inspections, violations and enforcement
NPDES TXR1518VG (SILA MAIN APPROACH PHASES 1-5): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1518VG
NPDES TXR1518VG: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1518VG
NPDES TXR1518VG: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.