Clean Water Act discharge permit · NPDES TXR1545RE
SUMMERWOOD TIE-IN PHASES 1 & 2 AND 11700 COMMON DOCK DRIVE, Houston, TX: NPDES TXR1545RE discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
SUMMERWOOD TIE-IN PHASES 1 & 2 AND 11700 COMMON DOCK DRIVE, held by CenterPoint Energy Resources Corp., holds NPDES permit TXR1545RE, which discharges to Carpenters Bayou. EPA’s file records it issued June 17, 2024 and expiring March 4, 2028. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for SUMMERWOOD TIE-IN PHASES 1 & 2 AND 11700 COMMON DOCK DRIVE: its NPDES ID, its permit type and status, its dates, its address in Houston, Texas, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES TXR1545RE.
What stands out
- Its term runs 3 years and 261 days, June 17, 2024 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | SUMMERWOOD TIE-IN PHASES 1 & 2 AND 11700 COMMON DOCK DRIVE |
|---|---|
| Permittee as filed | CenterPoint Energy Resources Corp. |
| NPDES ID | TXR1545RE |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | June 17, 2024 |
| Expiration date | March 4, 2028 |
| Address | Houston, TX 77044 |
| Receiving water | CARPENTERS BAYOU |
| Subwatershed | Carpenters Bayou (HUC 120401040702) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES TXR1545RE.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES TXR1545RE.
Inspections
EPA’s inspection file holds no inspection for NPDES TXR1545RE.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES TXR1545RE.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, TXR1545RE.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID TXR1545RE there.
SUMMERWOOD TIE-IN PHASES 1 & 2 AND 11700 COMMON DOCK DRIVE, Houston, Texas: Coverage under a general permit TXR1545RE, held by CenterPoint Energy Resources Corp.; Construction stormwater; Effective; issued June 17, 2024, term to March 4, 2028; discharges to CARPENTERS BAYOU.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 7,732 were issued before TXR1545RE. CenterPoint Energy Resources Corp. holds 12 permits in Texas.
Other permits held by CenterPoint Energy Resources Corp.
- CONROE 12-INCH RELIABILITY PHASES 1B-3, Conroe: TXR1504OW, issued 2023-10-30
- FM 2493 FLINT-BULLARD PHASES 1 AND 2, Bullard: TXR1516OP, issued 2023-10-05
- LEXINGTON PHASE 1, Missouri City: TXR1518TU, issued 2025-02-27
- SILA MAIN APPROACH PHASES 1-5, Houston: TXR1518VG, issued 2025-07-17
- EMBERLY MAIN APPROACH, Beasley: TXR1525PZ, issued 2024-02-20
- SOUTHWEST CROSSING AND WESTBURY LATERAL, Houston: TXR1538MX, issued 2023-05-24
- BRIDGELAND PHASE 6, Hockley: TXR1543UX, issued 2025-06-13
- LEXINGTON PHASE 2 & ALLUM, Houston: TXR1553WX, issued 2026-01-07
- US 59 WIDENING LAREDO PHASES 1-4, Laredo: TXR1558MQ, issued 2023-05-01
- FM 3083 PHASES 1-5, Conroe: TXR1559MO, issued 2023-04-24
Coverages issued nearest TXR1545RE
- 2024-06-17: ALTAMIRA SUBDIVISION, Navasota: TXR1539RE, held by Cervantez Construction, LLC
- 2024-06-17: CHAMBERS CREEK, Willis: TXR1540RE, held by Northtex Construction, LLC
- 2024-06-17: TRIPLE SEVENS FACILITY, Uvalde: TXR1541RE, held by Tyche Extraction Company, LLC
- 2024-06-17: HICKORY RIDGE, Elmendorf: TXR1542RE, held by Hakes Brothers Satx, LLC
- 2024-06-17: 15603 WOOD GROVE WAY, Willis: TXR1544RE, held by Royal Texan Homes LLC
- 2024-06-17: WARE SEGUIN RD, Schertz: TXR1547RE, held by Consolidated Installation Support, LLC
- 2024-06-17: ROYAL VISTA ESTATES UNIT 2, Tyler: TXR1548RE, held by Precision Civil, LLC
- 2024-06-17: CADENCE DRIVE PHASE 2, Manvel: TXR1549RE, held by Elite Construction And Engineering Services, LLC
- 2024-06-17: INDIGO, Richmond: TXR1550RE, held by Bull-G Construction Limited Liability Company
- 2024-06-17: WESTMOOR, Sherman: TXR1553RE, held by Meritage Homes of Texas, LLC
SUMMERWOOD TIE-IN PHASES 1 & 2 AND 11700 COMMON DOCK DRIVE among its neighbors
112 discharge permits are in the Carpenters Bayou subwatershed (HUC 120401040702); TXR1545RE is one. Its county: 4,455, 195 major; TXR1545RE is minor permit.
Other permits in the Carpenters Bayou subwatershed (HUC 120401040702)
- 683 LF SANITARY SEWER FACILITIES ALONG WHOUSTON LAKE PKWY, Houston: TXR1523WG, minor, term to 2028-03-04
- AMERICAN PALLET RECYCLING, Houston: TXR05FX71, minor, term to 2026-08-13
- AXIS INDUSTRIES GARRETT ROAD, Houston: TXR05GC60, minor, term to 2026-08-13
- BATTLEGROUND MATERIALS, Houston: TXR05HC33, minor, term to 2026-08-13
- CARPENTERS BAYOU TRAIL AND PEDESTIRAN BIKE BRIDGE, Houston: TXR1511RZ, minor, term to 2028-03-04
- CARPENTERS LANDING EAST, Channelview: TXR1566QX, minor, term to 2028-03-04
- CARPENTERS LOGISTICS CENTER WWTF, Channelview: TX0145653
- CE KING 66.72-ACRES, Houston: TXR1504ML, minor, term to 2028-03-04
- CHANNELVIEW CBP, Channelview: TXG113073, minor, term to 2026-11-06
- CHANNELVIEW TERMINAL, Channelview: TX0136573, minor, term to 2023-10-04
Nearby on the register
- Discharge permits in Houston
- Every permit record in Houston, A to Z
- Discharge permits in Texas
- Every permit record in Texas, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
SUMMERWOOD TIE-IN PHASES 1 & 2 AND 11700 COMMON DOCK DRIVE is one of 2,031 storm water construction permits in Harris County, and it sits among 112 NPDES permits in the Carpenters Bayou subwatershed. The permit has no pollutants under a numeric limit and no effluent exceedances on record.