NPDES TXR15406W · Clean Water Act
NORTH PARK 18, Odessa, TX: NPDES TXR15406W discharge permit, effluent exceedances, inspections, penalties
NORTH PARK 18, Odessa, Texas: General permit coverage TXR15406W, held by Betenbough Homes, LLC; Construction stormwater; Administratively continued; issued April 1, 2019, term to March 4, 2023; discharges to DETENTION BASIN DUE EAST.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 240 were issued before TXR15406W. Betenbough Homes, LLC holds 26 permits in Texas.
Other permits held by Betenbough Homes, LLC
- ABBEY GLEN, Lubbock: TXR1501ME, issued 2023-03-20
- WINDMILL CROSSING COMMERCIAL, Oddessa: TXR1503UH, issued 2025-04-15
- 87TH STREET UTILITY CONSTRUCTION, Odessa: TXR1505PK, issued 2023-12-27
- HOMESTEAD, Amarillo: TXR1506MW, issued 2023-05-19
- 100THLOOP 338 INTERSECTION, Odessa: TXR1508PK, issued 2023-12-27
- WEST MILWAUKEEE RIDGE, Lubbock: TXR1511SQ, issued 2024-11-04
- ANTIQUA TERRACE 2ND FILING, Odessa: TXR1515ZJ, issued 2026-09-07
- BETENBOUGH SLIDE SALES OFFICE, Lubbock: TXR1516SQ, issued 2024-11-04
- ALCOVE FARMS PAVING, Lubbock: TXR1524XG, issued 2026-02-09
- HAVEN AT MISSION ESTATES, Odessa: TXR1526NI, issued 2023-06-21
Coverages issued nearest TXR15406W
- 2019-03-01: COMMERCIAL DEVELOPMENT PHASE 1, El Paso: TXR15730V, held by Paragon Project Resources, Inc.
- 2019-03-01: ORCHARD VILLAGE PHASE 2, Fort Worth: TXR15731V, held by Wall007 LLC
- 2019-03-01: WATER DISTRIBUTION IMROVEMENTS PHASE II, Cameron: TXR15733V, held by Elliott Construction, LLC
- 2019-03-01: 10-ACRE COMMERCIAL DEVELOPMENT, Baytown: TXR15735V, held by Bovay Engineers, Inc.
- 2019-04-01: CHERRY PEAK OFFICE CONDOS LOT 1 BLOCK B, Lakeway: TXR15405W, held by Peak Design Build LLC
- 2019-04-01: HARRIS COUNTY CSCD EXPANSION AT ATASCOCITA, Humble: TXR15407W, held by THE GONZALEZ GROUP, LP
- 2019-04-01: CEDAR PORT PHASE III BUILDING 4, Baytown: TXR15408W, held by Clay Development & Construction, Inc.
- 2019-04-01: PARADIGM METALS INC, Hutto: TXR15409W, held by Harley Blackburn Holdings, LLC
- 2019-04-01: PROPOSED CLEARING & GRUBBING TO SERVE HIGHLAND MEADOWS, Rosenberg: TXR15412W, held by Fort Bend Excavation, Inc.
- 2019-04-01: EAST MONTGOMERY COUNTY MUD 5, New Caney: TXR15413W, held by East Montgomery County Municipal Utility District 5
NORTH PARK 18 among its neighbors
43 discharge permits are in the Antelope Lake-Muskingam Draw subwatershed (HUC 120800050305); TXR15406W is one.
Other permits in the Antelope Lake-Muskingam Draw subwatershed (HUC 120800050305)
- 100THLOOP 338 INTERSECTION, Odessa: TXR1508PK, minor, term to 2028-03-04
- 161 ROLLING WINDS, Odessa: TXR1544TZ, minor, term to 2028-03-04
- 87TH STREET UTILITY CONSTRUCTION, Odessa: TXR1505PK, minor, term to 2028-03-04
- AIR PRODUCTS - ODESSA, Odessa: TXR05EZ49, minor, term to 2026-08-13
- BRENNTAG SOUTHWEST, Odessa: TXR05HA24, minor, term to 2026-08-13
- CIRCLE K ODESSA TX, Odessa: TXR1514YS, minor, term to 2028-03-04
- CITY OF ODESSA MS4, Odessa: TXR040808
- CRANE AVENUE IMPROVEMENTS, Odessa: TXR1552RL, minor, term to 2028-03-04
- CRMWD ODESSA RESERVOIR AREA PIPING MODIFICATIONS C, Odessa: TXR1572UQ, minor, term to 2028-03-04
- ECTOR COUNTY COURTHOUSE PROJECT, Odessa: TXR1507WS, minor, term to 2028-03-04
What stands out
- Its term runs 3 years and 337 days, April 1, 2019 to March 4, 2023; the term ended 1,291 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NORTH PARK 18 |
|---|---|
| Permittee | Betenbough Homes, LLC |
| NPDES ID | TXR15406W |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 1, 2019 |
| Expires | March 4, 2023 |
| Address | Odessa, TX 79764 |
| Receiving water | DETENTION BASIN DUE EAST |
| Subwatershed | Antelope Lake-Muskingam Draw (HUC 120800050305) |
NPDES TXR15406W: effluent limits and exceedances
NORTH PARK 18 (NPDES TXR15406W): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR15406W: no pollutant row on file.
NPDES TXR15406W: inspections, violations and enforcement
NPDES TXR15406W (NORTH PARK 18): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR15406W
NPDES TXR15406W: one email when its EPA record changes — $99/month.
Permits near NPDES TXR15406W
NPDES TXR15406W: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.